Differences between revisions 1 and 4 (spanning 3 versions)
Revision 1 as of 2018-06-08 17:27:41
Size: 398
Comment:
Revision 4 as of 2018-06-08 17:52:46
Size: 684
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
Workers: Akutsu, Ken Tanaka with helps from Hayakawa and Nakada.
Line 8: Line 7:
* Took out the NAB from the wooden box.
* Insert the NAB into the clean booth for the IXA chamber.
Workers: Akutsu, Ken Tanaka with helps from Hayakawa and Nakada.
 * Took out the NAB from the wooden box.
 * Insert the NAB into the clean booth for the IXA chamber.

== Wanted! ==
 * Long ruler; use with a laser lever
 * Ladders to access the top of the NAB suspension outside of the chamber.
 * Ladders to access the top of the NAB suspension in the chamber.
 * A jig to keep the slings distance when the whole structure will be hung.
Line 12: Line 18:

== Wanted! ==
 * Install at Kamioka.

20180607

Today's activities

Workers: Akutsu, Ken Tanaka with helps from Hayakawa and Nakada.

  • Took out the NAB from the wooden box.
  • Insert the NAB into the clean booth for the IXA chamber.

Wanted!

  • Long ruler; use with a laser lever
  • Ladders to access the top of the NAB suspension outside of the chamber.
  • Ladders to access the top of the NAB suspension in the chamber.
  • A jig to keep the slings distance when the whole structure will be hung.

Next plan

  • Install at Kamioka.

KAGRA/subgroups/AOS/NarrowAngleBaffles/2018-06-07 (last edited 2018-06-08 17:52:46 by TomotadaAkutsu)