Line 6: Line 6:
 * Took out the NAB from the wooden box.
 * Insert the NAB into the clean booth for the IXA chamber.
 * Took out the inner tower from the IXA chamber.
  * Was dangerous when it was hung up to float.
 * Inserted the NAB suspension into the inner tower.
  * Some screws were about to touch or going to touch the inner tower so we removed them.
  * There were several points to be noted so that the NAB suspension won't crash against the inner tower, so be careful.
 * Found everything are not fully consistent. Especially we needed to decide what should be used as reference. Today we used an array of through holes as the reference; the NAB suspension was somehow moved so that the interface through holes can overlap the screw hole array at the one side; the other side of the inner tower showed the through holes were totally useless to access the NAB suspension.
 * Then measured several parts.
Line 11: Line 16:
 * Ladders to access the top of the NAB suspension outside of the chamber.
 * Ladders to access the top of the NAB suspension in the chamber.
 * A jig to keep the slings distance when the whole structure will be hung.
  == Issues ==
 * We found installing the dampers is mostly impossible the current structure; !!!! Urgently discuss how to resolve this!!!!
 * We found the relative positions are not perfect and need to be resolved finally when the NAB would be suspended.
Line 15: Line 21:
== Next plan ==
 * Install at Kamioka.
== Next plans ==
 * Insert the NAB+tower into IXA
 * Alignment and adjustment

20180611

Today's activities

Workers: Akutsu, Ikenoue, Simon, L. Shimizu, Yokozawa

  • Took out the inner tower from the IXA chamber.
    • Was dangerous when it was hung up to float.
  • Inserted the NAB suspension into the inner tower.
    • Some screws were about to touch or going to touch the inner tower so we removed them.
    • There were several points to be noted so that the NAB suspension won't crash against the inner tower, so be careful.
  • Found everything are not fully consistent. Especially we needed to decide what should be used as reference. Today we used an array of through holes as the reference; the NAB suspension was somehow moved so that the interface through holes can overlap the screw hole array at the one side; the other side of the inner tower showed the through holes were totally useless to access the NAB suspension.
  • Then measured several parts.

Wanted!

  • Long ruler; use with a laser lever

Issues

  • We found installing the dampers is mostly impossible the current structure; !!!! Urgently discuss how to resolve this!!!!
  • We found the relative positions are not perfect and need to be resolved finally when the NAB would be suspended.

Next plans

  • Insert the NAB+tower into IXA
  • Alignment and adjustment