* Systematic collaboration member list, author list, KSC member list management * "Approved" sign in JGWDoc * Vacuum sign-off sheet when sealing up an pumping down. * Wind shield for output optical tables * Calibration campaign (using IMC, suspensions, etc.) * Installation/integration closeout reviews * Better radio-wave-reception for PHS. * Or else get good headsets. |
Describe KAGRA/wishlist here.
- Site wide weekly meeting to level up the common knowledge
- Journal club
- Visitor schedule for commissioning
- Punch list for commissioning and IOO
- Site weekly from young researchers
- Quiet place with high-speed network inside the mine to attend telecons from the mine
- DGS access from rest houses around the tunnel entrance
- Change the charset of klog from iso-8859-1 to UTF-8 to allow showing Japanese
- Screw holes to fix cables to flanges
- Ventilation system around mine so that we can use organic solvent
- Systematic collaboration member list, author list, KSC member list management
- "Approved" sign in JGWDoc
- Vacuum sign-off sheet when sealing up an pumping down.
- Wind shield for output optical tables
- Calibration campaign (using IMC, suspensions, etc.)
- Installation/integration closeout reviews
- Better radio-wave-reception for PHS.
- Or else get good headsets.