Differences between revisions 4 and 7 (spanning 3 versions)
Revision 4 as of 2017-11-22 20:13:53
Size: 714
Comment:
Revision 7 as of 2017-11-30 11:19:56
Size: 993
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 27: Line 27:
 *  * Vacuum sign-off sheet when sealing up an pumping down.

 * Wind shield for output optical tables

 * Calibration campaign (using IMC, suspensions, etc.)

 * Installation/integration closeout reviews

 * Better radio-wave-reception for PHS.
  * Or else get good headsets.

Describe KAGRA/wishlist here.

  • Site wide weekly meeting to level up the common knowledge
  • Journal club
  • Visitor schedule for commissioning
  • Punch list for commissioning and IOO
  • Site weekly from young researchers
  • Quiet place with high-speed network inside the mine to attend telecons from the mine
  • DGS access from rest houses around the tunnel entrance
  • Change the charset of klog from iso-8859-1 to UTF-8 to allow showing Japanese
  • Screw holes to fix cables to flanges
  • Ventilation system around mine so that we can use organic solvent
  • Systematic collaboration member list, author list, KSC member list management
  • "Approved" sign in JGWDoc
  • Vacuum sign-off sheet when sealing up an pumping down.
  • Wind shield for output optical tables
  • Calibration campaign (using IMC, suspensions, etc.)
  • Installation/integration closeout reviews
  • Better radio-wave-reception for PHS.
    • Or else get good headsets.

KAGRA/wishlist (last edited 2017-12-01 13:00:26 by KiwamuIzumi)