Differences between revisions 8 and 18 (spanning 10 versions)
Revision 8 as of 2017-11-30 11:20:56
Size: 1057
Editor: KiwamuIzumi
Comment:
Revision 18 as of 2017-12-01 13:00:26
Size: 1782
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
   * Yokozawa and Yamamoto
Line 35: Line 36:
 * Better radio-wave-reception for PHS in the mine.  * Better radiowave reception for PHS in the mine and in the building.
Line 38: Line 39:
 * Place to store backpacks, baggages and so on.  * A place to store backpacks, baggages and so on in the mine.

 * Torque-gauged wrenches for SMAs.
 
 * Laptops in the mine which can run medm natively.

 * Weekly (or daily) cleaning chore.

 * More visible fonts on the card reader at the fan house at the Mozumi entrance.

 * Touch screen interface for controlling the interferometer.

 * Purge air functionality for all individual chambers to get rid of KOACH filters.

 * Larger control room.

 * Get rid of white board business --> can we do all the process electronically?

 * Klog comments should be able to display the attachments such as pictures.

 * Cross reference in klog.

 * A meeting in which people quantitatively report the activities.

Describe KAGRA/wishlist here.

  • Site wide weekly meeting to level up the common knowledge
  • Journal club
  • Visitor schedule for commissioning
  • Punch list for commissioning and IOO
  • Site weekly from young researchers
    • Yokozawa and Yamamoto
  • Quiet place with high-speed network inside the mine to attend telecons from the mine
  • DGS access from rest houses around the tunnel entrance
  • Change the charset of klog from iso-8859-1 to UTF-8 to allow showing Japanese
  • Screw holes to fix cables to flanges
  • Ventilation system around mine so that we can use organic solvent
  • Systematic collaboration member list, author list, KSC member list management
  • "Approved" sign in JGWDoc
  • Vacuum sign-off sheet when sealing up an pumping down.
  • Wind shield for output optical tables
  • Calibration campaign (using IMC, suspensions, etc.)
  • Installation/integration closeout reviews
  • Better radiowave reception for PHS in the mine and in the building.
    • Or else get good headsets.
  • A place to store backpacks, baggages and so on in the mine.
  • Torque-gauged wrenches for SMAs.
  • Laptops in the mine which can run medm natively.
  • Weekly (or daily) cleaning chore.
  • More visible fonts on the card reader at the fan house at the Mozumi entrance.
  • Touch screen interface for controlling the interferometer.
  • Purge air functionality for all individual chambers to get rid of KOACH filters.
  • Larger control room.
  • Get rid of white board business --> can we do all the process electronically?

  • Klog comments should be able to display the attachments such as pictures.
  • Cross reference in klog.
  • A meeting in which people quantitatively report the activities.

KAGRA/wishlist (last edited 2017-12-01 13:00:26 by KiwamuIzumi)