4546
Comment:
|
4647
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
. [[KAGRA/Subgroups/DAS/Meeting/learn2011|Data Analysis lecture & workshop]] on July 20th, 2012 |
|
Line 7: | Line 9: |
. KAGRA webs site ([[http://gwcenter.icrr.u-tokyo.ac.jp/|Japanese]], [[http://gwcenter.icrr.u-tokyo.ac.jp/en/|English]]) | . KAGRA website ([[http://gwcenter.icrr.u-tokyo.ac.jp/|Japanese]], [[http://gwcenter.icrr.u-tokyo.ac.jp/en/|English]]) |
Line 31: | Line 33: |
||**||Detector Configuration||DET||[[KAGRA/Subgroups/DET|wiki]]||[[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/detectorcharacterization/|blog]]|| | ||**||Detector Characterization||DC||[[KAGRA/Subgroups/DET|wiki]]||[[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/detectorcharacterization/|blog]]|| |
Line 52: | Line 54: |
.[[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/ICD|Interface Control Document (ICD)]] (Also see [[LCGT/Interface|Interface Control wiki]]) | .[[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/ICD|Interface Control Document (ICD)]] (Also see [[KAGRA/Interface|Interface Control wiki]]) |
KAGRA Wiki
News
Data Analysis lecture & workshop on July 20th, 2012
Meetings |
KAGRA collaboration meeting |
Documents |
|
Special WG' |
KAGRA Roadmap |
Tools |
KAGRA conference calendar |
Subsystems
Subgroup name |
Links |
|||
1 |
Tunnel |
TUN |
||
2 |
Facility |
FCL |
|
|
3 |
Vacuum |
VAC |
|
|
4 |
Cryogenics |
CRY |
||
5 |
Vibration Isolation |
VIS |
||
6 |
Mirror |
MIR |
|
|
7 |
Laser |
LAS |
|
|
8 |
Main Interferometer |
MIF |
|
|
9 |
Input/Output Optics |
IOO |
|
|
10 |
Auxiliary Optics Subsystem |
AOS |
||
11 |
Analog Electronics |
AEL |
|
|
12 |
Digital System |
DGS |
||
13 |
Data Analysis |
DAS |
|
|
14 |
Geophysics Interferometer |
GIF |
|
|
** |
Detector Characterization |
DC |
Project time-line
Time-line chart is here (password protected).
iKAGRA wiki: iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
bKAGRA wiki: bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.
Official Sensitivity of bKAGRA
KAGRA Official Documents
Others
Misc. (tools, past discussions, etc.)