|| ||Jul||Aug||Sep||Oct||Nov||Dec||Jan||Feb||Mar||Apr||May||Jun||Jul||Aug||Sep||Oct||Nov||Dec||Jan||Feb||Mar|| ||Janis || || || ||T-4|| || || || || || || || || || || || || || || || || || ||Joris || || || || || ||T-5||T-5|| || || || || || || || || || || || || || || ||Jerome || || || || || || || || || || || || || || || || || || || || || || ||Kazuhiro|| || || || || || || || || || || || || || || || || || || || || || |
|| ||Jul||Aug||Sep||Oct ||Nov||Dec||Jan||Feb||Mar||Apr||May||Jun||Jul||Aug||Sep||Oct||Nov||Dec||Jan||Feb||Mar|| ||Janis || || || ||T-4 || || || || || || || || || || || || || || || || || || ||Joris || || || || || ||T-5||T-5|| || || || || || || || || || || || || || || ||Jerome || || || ||ICRR|| || || || || || || || || || || || || || || || || || ||Kazuhiro|| || || || || || || || || || || || || || || || || || || || || || || || || || ||NAOJ|| || || || || || || || || || || || || || || || || || |
ELiTES activities in Japan (2015-2016)
Task List
(Task-1) Cryogenic Payload [host: Tomaru and Yamamoto]
- Collaboration on the cryogenic payload design (2015)
- Property measurement of cryogenic materials (2015) : (1) application and removal of indium (2) measurements of the thermal resistance of heat links and joint interfaces
- Development of local sensors and actuators (2015)
- Platform assembly (2015 1Q-2Q)
- Cooling test (2015 3Q-4Q)
- Suspension assembly (2015 1Q-4Q)
- Control test (2015 3Q - 2016 2Q)
- Vibration test at JAXA (2016 1-2Q)
- Installation and commissioning at the KAGRA site : available when CRY members work at site
(Task-2) Cool-down test of the cryostat + duct shield [host: Tomaru and Yamamoto]
- Preparation of a cryo-cooler system and DAQ system (2015 2Q)
- Cooling test and vibration test (2015 3Q)
(Task-3) Installation of the cryogenic payload prototype [host: Tomaru and Yamamoto]
- Installation (2016, 1-2Q)
- Cooling test and control test (2016, 3-4Q) : actual cooling of the real system is planned in 2017
(Task-4) Output mode-cleaner development [host: Somiya]
- Development of control scheme with a table-top experiment at Tokyo Tech
(Task-5) Development of horizontal accelerometer for the inverted pendulum [host: Takahashi]
- Experiment at National Astronomical Observatory at Mitaka
(Task-6) Site development of Kamioka [host: Kokeyama]
- Development real time software for subsystem controls
- Develop the mine environment monitor system
- Fabrications for analog circuits
- Other input/output optics installation tasks
Overseas Participants List
2015
- Janis Woehler (AEI): Task-4
- Joris van Heijningen (NIKHEF): Task-5
- Jerome Degallaix (LMA):
- Kazuhiro Agatsuma (NIKHEF)
Allocation Plan
|
2015 |
2016 |
2017 |
||||||||||||||||||
|
Jul |
Aug |
Sep |
Oct |
Nov |
Dec |
Jan |
Feb |
Mar |
Apr |
May |
Jun |
Jul |
Aug |
Sep |
Oct |
Nov |
Dec |
Jan |
Feb |
Mar |
Janis |
|
|
|
T-4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Joris |
|
|
|
|
|
T-5 |
T-5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Jerome |
|
|
|
ICRR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Kazuhiro |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
NAOJ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|