Line 9: Line 9:
 * Assembly and testings of the payload prototype : (1) platform assembly [1Q-2Q] (2) cooling test [3Q-4Q] (3) suspension assembly [1Q-4Q] (4) control test [2015 3Q - 2016 2Q] (5) vibration test [2016 1-2Q, JAXA]  * Platform assembly (2015 1Q-2Q)
* Cooling test (2015 3Q-4Q)
* Suspension assembly (2015 1Q-4Q)
* Control test (2015 3Q - 2016 2Q)
* Vibration test at JAXA (2016 1-2Q)
Line 18: Line 22:
 * Cooling test and control test (2016, 3-4Q) : actual cooling of the real system would be done in 2017  * Cooling test and control test (2016, 3-4Q) : actual cooling of the real system is planned in 2017
Line 23: Line 27:
=== (Task-5) Development of horizontal accelerometer for the inverted pendulum [host: Takahashi] ===
 * Experiment at National Astronomical Observatory at Mitaka
Line 24: Line 30:
=== (Task-6) Miscellaneous installation work at the Kamioka site [host: Kokeyama] ===
 * On-demand tasks (degital system, analogue circuits, input optics, etc.)

----------------------------------------------------------
Line 25: Line 35:
 * TBA (AEI)
=== 2015 ===
 * Janis Woehler (AEI): Task-4
 * Joris van Heijningen (NIKHEF): Task-5
Line 28: Line 41:
 * TBA -> Task-4
|| ||<style="text-align: center;"-6>2015||<style="text-align: center;"-12>2016||<style="text-align: center;"-3>2017||
|| ||Jul||Aug||Sep||Oct||Nov||Dec||Jan||Feb||Mar||Apr||May||Jun||Jul||Aug||Sep||Oct||Nov||Dec||Jan||Feb||Mar||
||Janis || || || ||T-4|| || || || || || || || || || || || || || || || || ||
||Joris || || || || || || || || || || || || || || || || || || || || || ||
||TBA || || || || || || || || || || || || || || || || || || || || || ||
||TBA || || || || || || || || || || || || || || || || || || || || || ||

ELiTES activities in Japan (2015-2016)

Task List

(Task-1) Cryogenic Payload [host: Tomaru and Yamamoto]

  • Collaboration on the cryogenic payload design (2015)
  • Property measurement of cryogenic materials (2015) : (1) application and removal of indium (2) measurements of the thermal resistance of heat links and joint interfaces
  • Development of local sensors and actuators (2015)
  • Platform assembly (2015 1Q-2Q)
  • Cooling test (2015 3Q-4Q)
  • Suspension assembly (2015 1Q-4Q)
  • Control test (2015 3Q - 2016 2Q)
  • Vibration test at JAXA (2016 1-2Q)
  • Installation and commissioning at the KAGRA site : available when CRY members work at site

(Task-2) Cool-down test of the cryostat + duct shield [host: Tomaru and Yamamoto]

  • Preparation of a cryo-cooler system and DAQ system (2015 2Q)
  • Cooling test and vibration test (2015 3Q)

(Task-3) Installation of the cryogenic payload prototype [host: Tomaru and Yamamoto]

  • Installation (2016, 1-2Q)
  • Cooling test and control test (2016, 3-4Q) : actual cooling of the real system is planned in 2017

(Task-4) Output mode-cleaner development [host: Somiya]

  • Development of control scheme with a table-top experiment at Tokyo Tech

(Task-5) Development of horizontal accelerometer for the inverted pendulum [host: Takahashi]

  • Experiment at National Astronomical Observatory at Mitaka

(Task-6) Miscellaneous installation work at the Kamioka site [host: Kokeyama]

  • On-demand tasks (degital system, analogue circuits, input optics, etc.)


Overseas Participants List

2015

  • Janis Woehler (AEI): Task-4
  • Joris van Heijningen (NIKHEF): Task-5

Allocation Plan

2015

2016

2017

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Janis

T-4

Joris

TBA

TBA

LCGT/ELiTES/2015 (last edited 2015-11-05 22:21:38 by KentaroSomiya)