Download 1 Minutes of WP3 telecon, Jun 1st 2012
2
3 - Participants
4 (sorry, I forgot to take the attendance.)
5
6 - Scope of WP3
7 * Infrastructure shall be an important scope of ELiTES.
8 * French group is not a part of ELiTES but we shall ask them
9 to join the activity by the next telecon.
10
11 - Contamination control
12 * There are lessons learned at 1G detectors.
13 * LIGO has a real-time monitor of contamination control.
14 * Suspension adjustment is to be done with HEPA turned off
15 and contamination of optics can be an issue.
16 * On ET side, LMA is in charge of the cleanliness of optics.
17
18 - Vibration isolation of cryo-coolers
19 * N.Kimura has been working on this for long on the KAGRA side.
20 * The cryo-cooler vibration has been measured in Rome and
21 Pisa, but results from KAGRA (CLIO) are important as the
22 measurement is done with an interferometer
23 * There are multiple solutions for the isolation.
24 * Study of residual noise of active systems (ex compressors)
25 is important.
26
27 - Cooling/Heating time reduction
28 * Fulvio and Paola are experts on the ET side.
29 * Helium gas cooling idea etc.
30 * Discussion at GWADW 2011 with Warren Johnson
31 * Fulvio will explain the problem with the actual KAGRA setup
32
33 - Scattering light control
34 * This also belongs to WP2.
35 * There are lessons learned from 1G detectors about baffles.
36 * Cooling of baffles is a new issue for ET/KAGRA.
37
38 - Exchange lectures