Differences between revisions 3 and 4
Revision 3 as of 2012-07-25 23:03:41
Size: 562
Comment:
Revision 4 as of 2012-07-25 23:11:48
Size: 936
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
|| ||8/14||8/15||8/16||8/17||8/20||8/21||8/22-24|| ||<style="width: 13%; text-align: center;">||<style="width: 10%; text-align: center;">8/14||<style="width: 10%; text-align: center;">8/15||<style="width: 10%; text-align: center;">8/16||<style="width: 10%; text-align: center;">8/17||<style="width: 10%; text-align: center;">8/20||<style="width: 10%; text-align: center;">8/21||<style="width: 10%; text-align: center;">8/22-24||
Line 7: Line 7:
||10:45-12:15||Coating loss (2)||Thermal lensing||Bulk loss (1)||
||12:15-14:00||arrival & lunch||<-4>lunch||
||14:00-15:30||<|2>lab tours at Jena & informal meeting||Coating loss (1)||Thermal lensing||Bulk loss (1)||future topic (1)||
||15:45-17:15||Coating loss (1)||Thermal lensing||Bulk loss (1)||future topic (2)||
||10:45-12:15||Coating loss (2)||Absorption, dn/dT, etc.||Bulk loss (1)||
||12:15-14:00||arrival & lunch||<style="text-align: center;"-4>lunch||
||14:00-15:30||<|2>lab tours at Jena & informal meeting||Thermal noise lecture||Thermal properties||Suspension||future topic (1)||
||15:45-17:15||Parametric instability||Cooling time reduction||Bonding||future topic (2)||

ET-KAGRA thermal noise workshop

Timetable

8/14

8/15

8/16

8/17

8/20

8/21

8/22-24

9:00-10:30

lab tours at Hannover

Coating loss (1)

Thermal lensing

Bulk loss (1)

lab work

lab work

10:45-12:15

Coating loss (2)

Absorption, dn/dT, etc.

Bulk loss (1)

12:15-14:00

arrival & lunch

lunch

14:00-15:30

lab tours at Jena & informal meeting

Thermal noise lecture

Thermal properties

Suspension

future topic (1)

15:45-17:15

Parametric instability

Cooling time reduction

Bonding

future topic (2)

LCGT/ELiTES/workshop2012 (last edited 2012-08-31 02:10:06 by KentaroSomiya)