5815
Comment:
|
5981
|
Deletions are marked like this. | Additions are marked like this. |
Line 23: | Line 23: |
TUN (Tunnel): hogehoge | Tunnel (TUN/TU): hogehoge<<BR>> Tunnel (TUN/TU): hogehoge<<BR>> Tunnel (TUN/TU): hogehoge<<BR>> |
Line 25: | Line 27: |
Allocation of items to each subsystem is here. | Allocation of items to each subsystem is [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=***|here|width=300]]. |
KAGRA Interface Control
Contents
2. Table of the interface items between subsystems
3. Working groups for important interface issues
6. Duty factor
1. Scope of each subsystem
Tunnel (TUN/TU): hogehoge
Tunnel (TUN/TU): hogehoge
Tunnel (TUN/TU): hogehoge
Allocation of items to each subsystem is here.
2. Table of the interface items between subsystems
|
TU |
FA |
VA |
CR |
VI |
MI |
LA |
IF |
IO |
AO |
EL |
DG |
DA |
GI |
TU |
-- |
|||||||||||||
FA |
-- |
|||||||||||||
VA |
-- |
|||||||||||||
CR |
-- |
|||||||||||||
VI |
-- |
|||||||||||||
MI |
-- |
|||||||||||||
LA |
-- |
|||||||||||||
IF |
-- |
|||||||||||||
IO |
-- |
|||||||||||||
AO |
-- |
|||||||||||||
EL |
-- |
|||||||||||||
DG |
-- |
|||||||||||||
DA |
-- |
|||||||||||||
GI |
-- |
3. Working groups for important interface issues
4. Parameter list
5. Requirements and tolerance