Differences between revisions 17 and 46 (spanning 29 versions)
Revision 17 as of 2012-05-12 11:55:20
Size: 6687
Comment:
Revision 46 as of 2012-06-06 11:48:17
Size: 8896
Comment:
Deletions are marked like this. Additions are marked like this.
Line 27: Line 27:
 * Tunnel (TUN/TU): ''hogehoge''<<BR>>
 * Facility (FCL/FA): ''hogehoge''<<BR>>
 * Vacuum (VAC/VA): ''hogehoge''<<BR>>
 * Cryogenic (CRY/CR): ''hogehoge''<<BR>>
 * Vibration Isolation (VIS/VI): ''hogehoge''<<BR>>
 * Mirror (MIR/MI): ''hogehoge''<<BR>>
 * Laser (LAS/LA): ''hogehoge''<<BR>>
 * Main Interferometer (MIF/IF): ''hogehoge''<<BR>>
 * Input/Output Optics (IOO/IO): ''hogehoge''<<BR>>
 * Auxiliary Optics (AOS/AO): ''hogehoge''<<BR>>
 * Analog Electronics (AEL/EL): ''hogehoge''<<BR>>
 * Digital (DGS/DG): ''hogehoge''<<BR>>
 * Data Analysis (DAS/DA): ''hogehoge''<<BR>>
 * Geophysics Interferometer (GIF/GI): ''hogehoge''<<BR>>
 * Tunnel (TUN/TU): ~-''Tunnel design, Underground lab area, Access tunnel, and Safety''-~<<BR>>
 * Facility (FCL/FA): ~-''TBD''-~<<BR>>
 * Vacuum (VAC/VA): ~-''Two beam tubes, Chambers, Baffles, Beam targets, Layout, and Pumps''-~<<BR>>
 * Cryogenic (CRY/CR): ~-''Cryostat, Shield, Cryo duct, Cryo-cooler; Cryo-suspension, and Heat link''-~<<BR>>
 * Vibration Isolation (VIS/VI): ~-''Four Type-A systems, Seven Type-B systems, and Several Type-C systems''-~<<BR>>
 * Mirror (MIR/MI): ~-''23kg Sapphire mirrors, Silica BS, Small Silica mirrors for PRC, SRC, MC, OMC''-~<<BR>>
 * Laser (LAS/LA): ~-''180W laser, 10-50W laser for iKAGRA, Laser control system, and Optics for lasers''-~<<BR>>
 * Main Interferometer (MIF/IF): ~-''MIF design (length, RoC, layout), LSC, ASC, Lock acquisition, and Commissioning''-~<<BR>>
 * Input/Output Optics (IOO/IO): ~-''Input optics between laser and PRM, and Output optics including OMMT and OMC''-~<<BR>>
 * Auxiliary Optics (AOS/AO): ~-''All the optical systems that are not included in MIF or IOO''-~<<BR>>
 * Analog Electronics (AEL/EL): ~-''TBD''-~<<BR>>
 * Digital System (DGS/DG): ~-''Real-time control, Data acquisition, IFO tuning, Automatic operation, and Information collection''-~<<BR>>
 * Data Analysis (DAS/DA): ~-''Management of observation data''-~<<BR>>
 * Geophysics Interferometer (GIF/GI): ~-''Baseline interferometer and Arrangement of sensors and benchmarks''-~<<BR>>
Line 42: Line 42:
||<style="border: none; color: #80FF80; font-weight: bold;"> Allocation of items to each subsystem is [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=***|here|width=300]].|| ||<style="border: none; color: gray; font-weight: bold;"> A list of allocated items to each subsystem is [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=1084|here|width=300]].||
Line 63: Line 63:
<<BR>>
<<BR>>
<<BR>>
<<BR>>
<<BR>>
||<style="border: none; color: gray; font-weight: bold;"> An interface item table at a glance is [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=987|here|width=300]].||
Line 72: Line 68:
 * [[Interface/Layout|Layout]] (VAC,MIF,AOS,IOO, etc.)
 * [[???|Cabling]] (VIS,CRY, etc.)
 * [[LCGT/Meeting/Instrument|Interlock]] (MIF,IOO,LAS, etc.)
 * [[Interface/DetectorDiagnostics|Detector diagnostics]] (MIF,DAS, etc.)
 * [[???|Connectors]] (VAC,CRY,DGS etc.)
Line 74: Line 76:

 * Parameter list is [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=1082|here]].
 * Glossary is [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=1083|here]].
Line 78: Line 84:
 * Requirements are given in the parameter list. Each parameter must be not so far from the required value as to '''deteriorate the sensitivity by less than 1%'''.
 * Tolerance is given for some of the parameters by calculating the robustness of the sensitivity. See [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=1081|here]].
Line 81: Line 90:
 * The target duty factor of KAGRA is '''80%'''. Breakdown of the time loss is shown [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=932|here]].
Line 83: Line 94:

 * ~-[[LCGT/Meeting/Reviews/External|External Review documents]]-~
 * ~-[[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/mif/doc/DesignDocument/|MIF design document]]-~
 * ~-[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=570|Cryo-payload parameters]].-~

KAGRA Interface Control


Contents

1. Scope of each subsystem

2. Table of the interface items between subsystems

3. Working groups for important interface issues

4. Parameter list

5. Requirements and tolerance

6. Duty factor

7. Reference


1. Scope of each subsystem

  • Tunnel (TUN/TU): Tunnel design, Underground lab area, Access tunnel, and Safety

  • Facility (FCL/FA): TBD

  • Vacuum (VAC/VA): Two beam tubes, Chambers, Baffles, Beam targets, Layout, and Pumps

  • Cryogenic (CRY/CR): Cryostat, Shield, Cryo duct, Cryo-cooler; Cryo-suspension, and Heat link

  • Vibration Isolation (VIS/VI): Four Type-A systems, Seven Type-B systems, and Several Type-C systems

  • Mirror (MIR/MI): 23kg Sapphire mirrors, Silica BS, Small Silica mirrors for PRC, SRC, MC, OMC

  • Laser (LAS/LA): 180W laser, 10-50W laser for iKAGRA, Laser control system, and Optics for lasers

  • Main Interferometer (MIF/IF): MIF design (length, RoC, layout), LSC, ASC, Lock acquisition, and Commissioning

  • Input/Output Optics (IOO/IO): Input optics between laser and PRM, and Output optics including OMMT and OMC

  • Auxiliary Optics (AOS/AO): All the optical systems that are not included in MIF or IOO

  • Analog Electronics (AEL/EL): TBD

  • Digital System (DGS/DG): Real-time control, Data acquisition, IFO tuning, Automatic operation, and Information collection

  • Data Analysis (DAS/DA): Management of observation data

  • Geophysics Interferometer (GIF/GI): Baseline interferometer and Arrangement of sensors and benchmarks

A list of allocated items to each subsystem is here.

2. Table of the interface items between subsystems

TU

FA

VA

CR

VI

MI

LA

IF

IO

AO

EL

DG

DA

GI

TU

--

o

o

o

o

o

o

o

o

o

o

o

o

o

FA

o

--

o

o

o

o

o

o

o

o

o

o

o

o

VA

o

o

--

o

o

o

o

o

o

o

o

o

o

o

CR

o

o

o

--

o

o

o

o

o

o

o

o

o

o

VI

o

o

o

o

--

o

o

o

o

o

o

o

o

o

MI

o

o

o

o

o

--

o

o

o

o

o

o

o

o

LA

o

o

o

o

o

o

--

o

o

o

o

o

o

o

IF

o

o

o

o

o

o

o

--

o

o

o

o

o

o

IO

o

o

o

o

o

o

o

o

--

o

o

o

o

o

AO

o

o

o

o

o

o

o

o

o

--

o

o

o

o

EL

o

o

o

o

o

o

o

o

o

o

--

o

o

o

DG

o

o

o

o

o

o

o

o

o

o

o

--

o

o

DA

o

o

o

o

o

o

o

o

o

o

o

o

--

o

GI

o

o

o

o

o

o

o

o

o

o

o

o

o

--

An interface item table at a glance is here.

3. Working groups for important interface issues

4. Parameter list

  • Parameter list is here.

  • Glossary is here.

5. Requirements and tolerance

  • Requirements are given in the parameter list. Each parameter must be not so far from the required value as to deteriorate the sensitivity by less than 1%.

  • Tolerance is given for some of the parameters by calculating the robustness of the sensitivity. See here.

6. Duty factor

  • The target duty factor of KAGRA is 80%. Breakdown of the time loss is shown here.

7. Reference

LCGT/Interface (last edited 2012-06-06 22:29:59 by KentaroSomiya)