Size: 5500
Comment:
|
Size: 6687
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
----- |
|
Line 5: | Line 7: |
~+1. [[#allocation|Allocation of items to each subsystem]]+~ | ~+1. [[#scope|Scope of each subsystem]]+~ |
Line 7: | Line 10: |
Line 8: | Line 12: |
Line 9: | Line 14: |
~+5. [[#dutyfactor|Duty factor]]+~ | ~+5. [[#tolerance|Requirements and tolerance]]+~ ~+6. [[#dutyfactor|Duty factor]]+~ ~+7. [[#reference|Reference]]+~ |
Line 14: | Line 24: |
<<Anchor(scope)>> == 1. Scope of each subsystem == * Tunnel (TUN/TU): ''hogehoge''<<BR>> * Facility (FCL/FA): ''hogehoge''<<BR>> * Vacuum (VAC/VA): ''hogehoge''<<BR>> * Cryogenic (CRY/CR): ''hogehoge''<<BR>> * Vibration Isolation (VIS/VI): ''hogehoge''<<BR>> * Mirror (MIR/MI): ''hogehoge''<<BR>> * Laser (LAS/LA): ''hogehoge''<<BR>> * Main Interferometer (MIF/IF): ''hogehoge''<<BR>> * Input/Output Optics (IOO/IO): ''hogehoge''<<BR>> * Auxiliary Optics (AOS/AO): ''hogehoge''<<BR>> * Analog Electronics (AEL/EL): ''hogehoge''<<BR>> * Digital (DGS/DG): ''hogehoge''<<BR>> * Data Analysis (DAS/DA): ''hogehoge''<<BR>> * Geophysics Interferometer (GIF/GI): ''hogehoge''<<BR>> ||<style="border: none; color: #80FF80; font-weight: bold;"> Allocation of items to each subsystem is [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=***|here|width=300]].|| |
|
Line 15: | Line 45: |
<<Anchor(allocation)>> <<Anchor(workinggroups)>> <<Anchor(parameterlist)>> <<Anchor(dutyfactor)>> == Table of the interface items between subsystems == |
== 2. Table of the interface items between subsystems == |
Line 37: | Line 63: |
Line 46: | Line 68: |
<<Anchor(workinggroups)>> == 3. Working groups for important interface issues == <<Anchor(parameterlist)>> == 4. Parameter list == <<Anchor(tolerance)>> == 5. Requirements and tolerance == <<Anchor(dutyfactor)>> == 6. Duty factor == <<Anchor(reference)>> == 7. Reference == |
KAGRA Interface Control
Contents
2. Table of the interface items between subsystems
3. Working groups for important interface issues
6. Duty factor
7. Reference
1. Scope of each subsystem
Tunnel (TUN/TU): hogehoge
Facility (FCL/FA): hogehoge
Vacuum (VAC/VA): hogehoge
Cryogenic (CRY/CR): hogehoge
Vibration Isolation (VIS/VI): hogehoge
Mirror (MIR/MI): hogehoge
Laser (LAS/LA): hogehoge
Main Interferometer (MIF/IF): hogehoge
Input/Output Optics (IOO/IO): hogehoge
Auxiliary Optics (AOS/AO): hogehoge
Analog Electronics (AEL/EL): hogehoge
Digital (DGS/DG): hogehoge
Data Analysis (DAS/DA): hogehoge
Geophysics Interferometer (GIF/GI): hogehoge
Allocation of items to each subsystem is here. |
2. Table of the interface items between subsystems
|
TU |
FA |
VA |
CR |
VI |
MI |
LA |
IF |
IO |
AO |
EL |
DG |
DA |
GI |
TU |
-- |
|||||||||||||
FA |
-- |
|||||||||||||
VA |
-- |
|||||||||||||
CR |
-- |
|||||||||||||
VI |
-- |
|||||||||||||
MI |
-- |
|||||||||||||
LA |
-- |
|||||||||||||
IF |
-- |
|||||||||||||
IO |
-- |
|||||||||||||
AO |
-- |
|||||||||||||
EL |
-- |
|||||||||||||
DG |
-- |
|||||||||||||
DA |
-- |
|||||||||||||
GI |
-- |
3. Working groups for important interface issues
4. Parameter list
5. Requirements and tolerance
6. Duty factor