Size: 5662
Comment:
|
Size: 6909
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
----- |
|
Line 5: | Line 7: |
~+1. [[#allocation|Allocation of items to each subsystem]]+~ | ~+1. [[#scope|Scope of each subsystem]]+~ |
Line 13: | Line 15: |
~+5. [[#dutyfactor|Duty factor]]+~ | ~+5. [[#tolerance|Requirements and tolerance]]+~ ~+6. [[#dutyfactor|Duty factor]]+~ ~+7. [[#reference|Reference]]+~ |
Line 18: | Line 24: |
<<Anchor(scope)>> == 1. Scope of each subsystem == * Tunnel (TUN/TU): ''hogehoge''<<BR>> * Facility (FCL/FA): ''hogehoge''<<BR>> * Vacuum (VAC/VA): ''hogehoge''<<BR>> * Cryogenic (CRY/CR): ''hogehoge''<<BR>> * Vibration Isolation (VIS/VI): ''hogehoge''<<BR>> * Mirror (MIR/MI): ''hogehoge''<<BR>> * Laser (LAS/LA): ''hogehoge''<<BR>> * Main Interferometer (MIF/IF): ''hogehoge''<<BR>> * Input/Output Optics (IOO/IO): ''hogehoge''<<BR>> * Auxiliary Optics (AOS/AO): ''hogehoge''<<BR>> * Analog Electronics (AEL/EL): ''hogehoge''<<BR>> * Digital (DGS/DG): ''hogehoge''<<BR>> * Data Analysis (DAS/DA): ''hogehoge''<<BR>> * Geophysics Interferometer (GIF/GI): ''hogehoge''<<BR>> ||<style="border: none; color: #80FF80; font-weight: bold;"> Allocation of items to each subsystem is [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=***|here|width=300]].|| |
|
Line 19: | Line 45: |
== 1. Allocation of items to each subsystem == <<Anchor(allocation)>> |
|
Line 41: | Line 64: |
<<BR>> <<BR>> <<BR>> <<BR>> |
|
Line 49: | Line 68: |
* [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=685|Layout]] (VAC,MIF,AOS,IOO, etc.) * [[???|Cabling]] (VIS,CRY, etc.) * [[???|Interlock]] (MIF,IOO,LAS, etc.) * [[???|Detector diagnostics tool]] (MIF,DetChar, etc.) |
|
Line 52: | Line 76: |
<<Anchor(tolerance)>> == 5. Requirements and tolerance == |
|
Line 53: | Line 80: |
== 5. Duty factor == | == 6. Duty factor == <<Anchor(reference)>> == 7. Reference == |
KAGRA Interface Control
Contents
2. Table of the interface items between subsystems
3. Working groups for important interface issues
6. Duty factor
7. Reference
1. Scope of each subsystem
Tunnel (TUN/TU): hogehoge
Facility (FCL/FA): hogehoge
Vacuum (VAC/VA): hogehoge
Cryogenic (CRY/CR): hogehoge
Vibration Isolation (VIS/VI): hogehoge
Mirror (MIR/MI): hogehoge
Laser (LAS/LA): hogehoge
Main Interferometer (MIF/IF): hogehoge
Input/Output Optics (IOO/IO): hogehoge
Auxiliary Optics (AOS/AO): hogehoge
Analog Electronics (AEL/EL): hogehoge
Digital (DGS/DG): hogehoge
Data Analysis (DAS/DA): hogehoge
Geophysics Interferometer (GIF/GI): hogehoge
Allocation of items to each subsystem is here. |
2. Table of the interface items between subsystems
|
TU |
FA |
VA |
CR |
VI |
MI |
LA |
IF |
IO |
AO |
EL |
DG |
DA |
GI |
TU |
-- |
|||||||||||||
FA |
-- |
|||||||||||||
VA |
-- |
|||||||||||||
CR |
-- |
|||||||||||||
VI |
-- |
|||||||||||||
MI |
-- |
|||||||||||||
LA |
-- |
|||||||||||||
IF |
-- |
|||||||||||||
IO |
-- |
|||||||||||||
AO |
-- |
|||||||||||||
EL |
-- |
|||||||||||||
DG |
-- |
|||||||||||||
DA |
-- |
|||||||||||||
GI |
-- |
3. Working groups for important interface issues
Layout (VAC,MIF,AOS,IOO, etc.)
Cabling (VIS,CRY, etc.)
Interlock (MIF,IOO,LAS, etc.)
Detector diagnostics tool (MIF,DetChar, etc.)
4. Parameter list
5. Requirements and tolerance
6. Duty factor