Size: 837
Comment:
|
Size: 780
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
1st: September 21, 2010(Tue) 14pm-15pm(JST) | = LCGT subgroup leader meeting = [[LCGT/Meeting/Leader/About|About this meeting]] == Meeting schedule == .Every 2nd, 4th and 5th(if exists) Monday, 2pm(JST) ---- <<TableOfContents(3)>> ---- == 1st: September 21, 2010(Tue) 14:00-15:00(JST) == |
Line 6: | Line 18: |
1. | |
Line 7: | Line 20: |
General report of the project (progress since the last meeting on 2nd, August) Construction Schedule in detail (based on the summary by PM support group) Revised organization diagram (renewed sub-WGs, newly created LCGT Steering Committee) Guideline to accept new members of LCGT Diameter of vacuum tube (re-confirmation) Progress report of MOU with LIGO for the cooperative research agreement (discussion point: Policy of data-exchange in future) Others |
|
Line 15: | Line 21: |
*[[attachment:LCGT/Meeting/Leader/20100921/IOP_Laser_Room_100813.pdf|Input Optics (IOP) by Telada]] *[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=175|IFO Design by Aso]] *[[attachment:LCGT/Meeting/Leader/20100921/20100802_Lmeetign_digital.pdf|Digital system by Miyakawa]] *[[attachment:LCGT/Meeting/Leader/20100921/lcgt_geo_100921.pdf|Base line IFO by Araya]] |
|
Line 16: | Line 26: |
2.Time schedule for LCGT project (password protected) 3.LCGT Construction organization (password protected) 4.Guideline of the membership of LCGT Collaboration (password protected) 5.Determination of the diameter of vacuum tube (password protected) |
[[LCGT/Meeting/Leader/20100419/minute|Minute]] |
LCGT subgroup leader meeting
Meeting schedule
- Every 2nd, 4th and 5th(if exists) Monday, 2pm(JST)
Contents
1st: September 21, 2010(Tue) 14:00-15:00(JST)
Agenda
Files