Differences between revisions 455 and 536 (spanning 81 versions)
Revision 455 as of 2015-06-17 20:37:18
Size: 27821
Editor: ANDO Masaki
Comment:
Revision 536 as of 2015-06-22 15:22:09
Size: 31902
Editor: ANDO Masaki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
 * Location and access: Toyama University (Multipurpose Auditorium)[[***|Access]], KAGRA Kamioka site

 * The trum between the JR TOYAMA station and Toyama University is operated every 5 ~ 10 minutes.
 * [[http://www.apahotel.com.e.ju.hp.transer.com/language/hokuriku/16v_toyama-ekimae.html|APA Ville Hotel Information]]

 * Venue Location and Access in Toyama city: [[http://www.u-toyama.ac.jp/en/access/gofuku/index.html|Toyama University]],[[http://www.icrr.u-tokyo.ac.jp/~miyoki/Access_to_Venue.pdf|Multipurpose Auditorium in the Toyama University]]

 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/Meeting/f2f/2014Aug/Access|Access to Toyama city]]
Line 12: Line 14:
 * Wi''''''Fi in the Venue, ESSID : ******, WEP or ? : Plese see the information in the room.

 * The temperature in the mine is about 15 degrees all year around. For prevention against the cold and accident, please wear casual long-sleeved shirt(or bring jacket), long pants and shoes.
 * WiFi in the Venue, ESSID : ******, WEP or ? : Plese see the information in the room.

 * Note : The temperature in the Kamioka mine is about 15 degrees all year around. For prevention against the cold and accident, please wear casual long-sleeved shirt(or bring jacket), long pants and shoes.
Line 20: Line 22:
||||||||||<style="text-align:center"> ▄▄▄▄▄▄▄▄▄▄▄▄ 29th June (Mon) ▄▄▄▄▄▄▄▄▄▄▄▄▄ ||
||Time ||Title ||Speaker ||Presentation ||Document ||
||||||Project Overview||||<style="text-align:center"> ||
||9:00 ~ 10:00 ||Welcome Address and Introduction || ||[[***|X]] ||- ||
||10:00 ~ 10:40 ||Introduction on Tunnel and Facility || ||[[***|X]] ||- ||
||10:40 ~ 11:00 ||Discussion || ||[[***|X]] ||- ||
|||||| Kamioka Tour || || ||
||11:00 ~ 12:20 || Move to Kamioka site (Lunch in bus)||||||||
||12:20 ~ 16:40 || On-Site Discussion || ||||<style="text-align:center"> ||
||16:40 ~ 18:00 ||Move back to Toyama||||||||
||||||||||<style="text-align:center"> ▄▄▄▄▄▄▄▄▄▄▄▄ 30th June (Tue) ▄▄▄▄▄▄▄▄▄▄▄▄▄▄ ||
||Time ||Title ||Speaker ||Presentation ||Document ||
||||||Item (1) : bKAGRA configuration and Plan ||||<style="text-align:center"> ||
||9:00 ~ 12:00 ||TBD||TBA||[[***|X]] ||- ||
||||||Lunch||||||
||||||Item (2) : Vibration Isolation ||||<style="text-align:center"> ||
||13:20 ~ 17:00 ||TBD||TBA||[[***|X]] ||- ||
||17:00 ~ 18:00 ||||Discussion (answers to questions on the 1st day)||||<style="text-align:center"> ||
||18:00 ~ |||| Banquet||||<style="text-align:center"> ||
||||||||||<style="text-align:center"> ▄▄▄▄▄▄▄▄▄▄▄▄▄ 1st July (Wed) ▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ ||
||Time ||Title ||Speaker ||Presentation ||Document ||
||||||Item (3) : Cryogenics and Test mass||||<style="text-align:center"> ||
||10:00 ~ 10:30 ||TBD||TBA||[[***|X]] ||- ||
||||||Lunch||||||
||||||Item (4) : High Power Operation ||||<style="text-align:center"> ||
||13:20 ~ 15:40 ||TBD||TBA||[[***|X]] ||- ||
||||||Discussion (answers to questions on the 2nd day)||||<style="text-align:center"> ||
|||||| Closed Session by Reviewer||||<style="text-align:center"> ||
|||||| Short summary and Closing remarks||||<style="text-align:center"> ||||
||16:40 |||| Adjourn||||<style="text-align:center"> ||||||
||||||||||<style="text-align:center">▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ 29th June (Mon) ▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ ||
||Time ||Title ||Speaker ||Presentation ||Document ||
||9:00 ~ 9:10 |||| Closed Session by Reviewers ||||<style="text-align:center"> ||
||9:10 ~ 10:00 |||| Project Overview ||||<style="text-align:center"> ||
|| ||Welcome Talk (10min) ||M. Ohashi ||[[***|X]] ||- ||
|| ||Project Overview (20min) ||Y. Saito ||[[***|X]] ||- ||
|| ||Overview of this Review (20min) ||M. Ando ||[[***|X]] ||- ||
||10:00 ~ 10:40 ||||Introduction (Tunnel and Facility) ||||<style="text-align:center"> ||
|| ||Tunnel/ Vacuum System (20min) ||T. Uchiyama ||[[***|X]] ||- ||
|| ||Facility (20min) ||S. Miyoki ||[[***|X]] ||- ||
||10:40 ~ 11:00 ||||Discussion ||||<style="text-align:center"> ||
||||||<style="text-align:center">Kamioka Tour ||||<style="text-align:center"> ||
||11:00 ~ 12:20 ||||<style="text-align:center">Move to Kamioka site (Lunch in bus) ||||<style="text-align:center"> ||
||12:20 ~ 16:40 ||||<style="text-align:center">On-Site Discussion ||||<style="text-align:center"> ||
||16:40 ~ 18:00 ||||<style="text-align:center">Move back to Toyama ||||<style="text-align:center"> ||
||||||||||<style="text-align:center">▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ 30th June (Tue) ▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ ||
||Time ||Title ||Speaker ||Presentation ||Document ||
||9:00 ~ 12:00 ||||<style="text-align:center">Item (1) : bKAGRA Configuration and Plan ||||<style="text-align:center"> ||
|| ||TBD (30min) ||K. Somiya ||[[***|X]] ||- ||
|| ||TBD (30min) ||Y. Aso ||[[***|X]] ||- ||
|| ||TBD (20min) ||Y. Saito ||[[***|X]] ||- ||
|| ||TBD (20min) ||T. Uchiyama ||[[***|X]] ||- ||
||12:00 ~ 13:20 ||||<style="text-align:center">Lunch ||||<style="text-align:center"> ||
||13:20 ~ 17:00 ||||<style="text-align:center">Item (2) : Vibration Isolation ||||<style="text-align:center"> ||
|| ||Overview of KAGRA VIS ||R. Takahashi ||[[***|X]] ||- ||
|| ||Mechanical Installation Procedure ||R. Takahashi ||[[***|X]] ||-||
|| ||Clean Installation Procedure ||E. Hirose ||[[***|X]] ||-||
|| ||Measurement of the mirror positions ||Y. Saito ||[[***|X]] ||-||
|| ||Control and Tuning of the suspensions ||T. Sekiguchi ||[[***|X]] ||-||
||17:00 ~ 18:00 ||||<style="text-align:center">Discussion (answers to questions on the 1st day) ||||<style="text-align:center"> ||
||18:00 ~ ||||<style="text-align:center">Banquet ||||<style="text-align:center"> ||
||||||||||<style="text-align:center">▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ 1st July (Wed) ▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ ||
||Time ||Title ||Speaker ||Presentation ||Document ||
||9:00 ~ 12:00 ||||<style="text-align:center">Item (3) : Cryogenics and Test mass ||||<style="text-align:center"> ||
|| ||Cryogenic Payload / Cryogenics (60min) || K. Yamamoto ||[[***|X]] ||- ||
|| ||Sapphire Mirrors / bKAGRA Mirrors (60min) ||E. Hirose ||[[***|X]] ||- ||
||12:00 ~ 13:20 ||||<style="text-align:center">Lunch ||||<style="text-align:center"> ||
||13:20 ~ 15:40 ||||<style="text-align:center">Item (4) : High Power Operation ||||<style="text-align:center"> ||
|| ||Overview (15min) ||S. Kawamura ||[[***|X]] ||- ||
|| ||High-power laser (15min) ||R. Nishiuchi ||[[***|X]] ||- ||
|| ||Pre-stabilization system (15min) ||M. Nakano ||[[***|X]] ||- ||
|| ||Baffle (15min) ||T. Akutsu ||[[***|X]] ||- ||
||15:40 ~ ||||<style="text-align:center">Discussion (answers to questions on the 2nd day) ||||<style="text-align:center"> ||
|| ~ 16:30 ||||<style="text-align:center">Closed Session by Reviewer ||||<style="text-align:center"> ||
||16:30 ~ 16:40 ||||<style="text-align:center">Short summary and Closing remarks ||||<style="text-align:center"> ||
||16:40 ||||<style="text-align:center">Adjourn ||||<style="text-align:center"> ||
Line 55: Line 74:
 * Influence of the cost saving [aso, saito]
 * OMC design and schedule [somiya]
 * bKAGRA1 commissioning [aso]
 * bKAGRA configuration [Somiya, ~30min + Discussion]
 * Constraints and plan on budget and milestones [Aso, ~30min + Discussion]
 * Influence of the cost saving (VAC + FCL) [Saito, ~20min + Discussion]
 * Commissioning plan based on current situation [Uchiyama, ~20min + Discussion]
Line 60: Line 80:
 * Stack installation [takahashi]
 * BS type-B design and installation plan [takahashi]
 * Interface to cryo-payload for Type-A [takahashi, suzuki]
 * Manufacture of IP [flaminio]
 * Overview of the KAGRA Vibration Isolation System [R. Takahashi]
 * Installation Procedure
  * Mechanical Installation [R. Takahashi]
  * Clean installation of the mirrors [E. Hirose]
  * Measurement and verification of the mirror position/orientation. [Y. Saito]
 * Control and tuning of the suspension systems. [T. Sekiguchi]
Line 66: Line 88:
 * Overview of cryo-payload [yamamoto]
 * Surface error estimate of side-cut [hirose]
 * Thermal noise of HCB [yamamoto]
 * Design of intermediate mass and recoil mass [yamamoto]
 * Refraction index inhomogeneity and IBF [hirose]

===== (4) Input and output optics =====
 * High-power in-vacuum faraday [somiya]
 * High-power eom design [somiya]
 * AEOM design [michimura]
 * Otical layout on PSL table [kawamura]
 * BRT design [akutsu]
 * Baffles [akutsu]
 * Cryogenic Payload / Cryogenics [Yamamoto]
 * Sapphire Mirrors / bKAGRA Mirrors [Hirose]

===== (4) High Power Operation =====
 * Overview [Kawamura, 15min + Discussion]
 * High-power laser [R. Nishiuchi, 15min + Discussion]
 * Pre-stabilization system [M. Nakano, 15min + Discussion]
 * Baffle [Akutsu, 15min + Discussion]

==== References ====
 * KAGRA Design : [[http://iopscience.iop.org/0264-9381/29/12/124007/|KAGRA Review Paper]], [[http://journals.aps.org/prd/abstract/10.1103/PhysRevD.88.043007|bKAGRA Interferometer Design]] (more details:[[http://iopscience.iop.org/0264-9381/31/9/095003/|DRSE control]], [[http://iopscience.iop.org/0264-9381/31/22/224003|cooling]] [[http://iopscience.iop.org/0264-9381/31/10/105004|cryopayload]],[[http://journals.aps.org/prd/abstract/10.1103/PhysRevD.89.062003|sapphire]] )

 * Vibration Isolation : [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2936 |Summary at PAB 2014 Nov]],[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2285 | Installation plan (External Review 2014 Apr)]], [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=929 | External Review 2012 Apr]],[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2265 | Design Report 2014 Mar]]

 * Previous External Review :[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3721|Report in the External Review 2014]]
Line 82: Line 107:
||Mike Zucker|| LIGO-Lab/ Massachusetts Institute of Technology ||Chair ||
||Rana Adhikari||LIGO-Lab/ California Institute of Technology  || ||
||Katsunobu Oide||KEK|| ||
||Norna Robertson||California Institute of Technology|| ||
||Valery Frolov||LIGO-Lab/ California Institute of Technology || ||
||Ho Jung Paik ||University of Maryland|| ||
||Keith Thorne
||California Institute of Technology|| ||
||Mike Zucker ||LIGO-Lab/ Massachusetts Institute of Technology ||Chair ||
||Rana Adhikari ||LIGO-Lab/ California Institute of Technology || ||
||Katsunobu Oide ||KEK || ||
||Norna Robertson ||California Institute of Technology || ||
||Valery Frolov ||LIGO-Lab/ California Institute of Technology || ||
||Ho Jung Paik ||University of Maryland || ||
||Keith Thorne
||California Institute of Technology || ||


==== KAGRA Participants ====
Tomotada AKUTSU, Shinji MIYOKI, Ryutaro TAKAHASHI, Yuta MICHIMURA, Osamu MIYAKAWA, Kazuhiro YAMAMOTO, Kentaro SOMIYA, Seiji KAWAMURA, Masayuki NAKANO, Naoko OHISHI, Yoshio SAITO, Takashi UCHIYAMA, Kazuhiro HAYAMA, Ryota NISHIUCHI, Masaki ANDO, Takaaki KAJITA, Raffaele FLAMINIO, Masatake OHASHI, Eiichi HIROSE
Line 98: Line 127:
 * Wi''''''Fi in ICRR 6F large conference room ESSID : 00icrr-11g/b (invisible), WEP : Plese see the information in the room.  * WiFi in ICRR 6F large conference room ESSID : 00icrr-11g/b (invisible), WEP : Plese see the information in the room.
Line 102: Line 131:
||||||||||<style="text-align:center"> ▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ 2nd April (Wed) ▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ ||
||Time ||Title ||Speaker ||Presentation ||Document ||
||||||Project Overview||||<style="text-align:center"> ||
||10:00 ~ 10:10 (10) ||Welcome Address and Introduction  ||T.Kajita ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2310|O]] ||- ||
||10:10 ~ 10:30 (20) ||Scope of External Review  ||M.Ando ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2274|O]] ||- ||
||||||||||<style="text-align:center">▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ 2nd April (Wed) ▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ ||
||Time ||Title ||Speaker ||Presentation ||Document ||
||||||<style="text-align:center">Project Overview ||||<style="text-align:center"> ||
||10:00 ~ 10:10 (10) ||Welcome Address and Introduction ||T.Kajita ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2310|O]] ||- ||
||10:10 ~ 10:30 (20) ||Scope of External Review ||M.Ando ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2274|O]] ||- ||
Line 110: Line 139:
||11:30 ~ 12:00 (30) ||TUN/FCL/GIF(env) ||T.Uchiyama/S.Miyoki/A.Araya|| [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2277|O]],[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2281|O]] ,[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2305|O]]  || [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2307|FCL-VAC]] ||
||12:00 ~ 13:00 (60) ||||<style="text-align:center">Lunch||||<style="text-align:center"> ||
||||||iKAGRA Plan 1||||<style="text-align:center"> ||
||13:00 ~ 13:30 (30) ||VAC/CRY(cryostat)/GIF(vac) ||Y.Saito/T.Suzuki/A.Araya || [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2284|P]],[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2304|O]] ||- ||
||13:30 ~ 14:30 (60) ||IOO/LAS ||K.Kawamura, N.Mio || [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2290|O]], [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=xxx|x]]  ||- ||
||14:30 ~ 15:10 (40) ||||<style="text-align:center">Closed Meeting and Break||||<style="text-align:center"> ||
||15:10 ~ 15:30 (20) ||MIR (Silica Optics)||E.Hirose ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2308|O]] ||- ||
||15:30 ~ 16:30 (60) ||VIS||R.Takahashi ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2285|P]] ||- ||
||11:30 ~ 12:00 (30) ||TUN/FCL/GIF(env) ||T.Uchiyama/S.Miyoki/A.Araya ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2277|O]],[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2281|O]] ,[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2305|O]] ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2307|FCL-VAC]] ||
||12:00 ~ 13:00 (60) ||||<style="text-align:center">Lunch ||||<style="text-align:center"> ||
||||||<style="text-align:center">iKAGRA Plan 1 ||||<style="text-align:center"> ||
||13:00 ~ 13:30 (30) ||VAC/CRY(cryostat)/GIF(vac) ||Y.Saito/T.Suzuki/A.Araya ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2284|P]],[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2304|O]] ||- ||
||13:30 ~ 14:30 (60) ||IOO/LAS ||K.Kawamura, N.Mio ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2290|O]], [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=xxx|x]] ||- ||
||14:30 ~ 15:10 (40) ||||<style="text-align:center">Closed Meeting and Break ||||<style="text-align:center"> ||
||15:10 ~ 15:30 (20) ||MIR (Silica Optics) ||E.Hirose ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2308|O]] ||- ||
||15:30 ~ 16:30 (60) ||VIS ||R.Takahashi ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2285|P]] ||- ||
Line 121: Line 150:
||||||||||<style="text-align:center">▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ 3rd April (Thu) ▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄||
||Time ||Title ||Speaker ||Presentation ||Document ||
||||||iKAGRA Plan 2||||<style="text-align:center"> ||
||10:00 ~ 11:00 (60) ||MIF (iKAGRA)  ||Y.Aso||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2276|P]] ||- ||
||11:00 ~ 11:30 (30) ||AOS(oplev, viewport)||T.Akutsu ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2272|O]] ||Another file.[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2272|O]] ||
||11:30 ~ 13:00 (90)||||<style="text-align:center">Lunch ||||<style="text-align:center"> ||
||13:00 ~ 13:30 (30) ||DGS  ||O.Miyakawa||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2278|O]] ||[[attachment:Microsoft Project - 12_DGS_large.pdf|O]] [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=1105|O]] [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1437|O]]||
||13:30 ~ 14:00 (30) ||AEL  ||O.Miyakawa||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2279|O]] ||[[attachment:20140310_AI.pdf|O]]||
||14:00 ~ 15:00 (60) ||DMG/DAS/DetChar||N.Kanda, H.Tagoshi, K.Hayama || [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2297|o]],[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2303|O]], [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2312|O]]  ||- ||
||15:00 ~ 15:30 (30) ||||<style="text-align:center">Closed Meeting and Break||||<style="text-align:center"> ||
||||||||||<style="text-align:center">▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ 3rd April (Thu) ▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ ||
||Time ||Title ||Speaker ||Presentation ||Document ||
||||||<style="text-align:center">iKAGRA Plan 2 ||||<style="text-align:center"> ||
||10:00 ~ 11:00 (60) ||MIF (iKAGRA) ||Y.Aso ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2276|P]] ||- ||
||11:00 ~ 11:30 (30) ||AOS(oplev, viewport) ||T.Akutsu ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2272|O]] ||Another file.[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2272|O]] ||
||11:30 ~ 13:00 (90) ||||<style="text-align:center">Lunch ||||<style="text-align:center"> ||
||13:00 ~ 13:30 (30) ||DGS ||O.Miyakawa ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2278|O]] ||[[attachment:Microsoft Project - 12_DGS_large.pdf|O]] [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=1105|O]] [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1437|O]] ||
||13:30 ~ 14:00 (30) ||AEL ||O.Miyakawa ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2279|O]] ||[[attachment:20140310_AI.pdf|O]] ||
||14:00 ~ 15:00 (60) ||DMG/DAS/DetChar ||N.Kanda, H.Tagoshi, K.Hayama ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2297|o]],[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2303|O]], [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2312|O]] ||- ||
||15:00 ~ 15:30 (30) ||||<style="text-align:center">Closed Meeting and Break ||||<style="text-align:center"> ||
Line 133: Line 162:
||18:00 ~ 20:00||||<style="text-align:center">Banquet at Hassai||||<style="text-align:center"> ||
||||||||||<style="text-align:center"> ||
||||||||||<style="text-align:center">▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ 4th April (Fri) ▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄||
||Time ||Title ||Speaker ||Presentation ||Document ||
||||||bKAGRA Plan||||<style="text-align:center"> ||
||10:00 ~ 11:00 (60) ||CRY (Suspension)  ||H.Kimura/K.Yamamoto || [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2280|x]], [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2280|P]] ||- ||
||10:00 ~ 10:20 (20) ||MIF/IOO (bKAGRA)--> ''Canceled''  ||Y.Aso/K.Somiya|| [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=xxx|x]], [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=xxx|x]] ||- ||
||11:00 ~ 10:20 (20) ||AOS (Baffle, BRT)  ||T.Akutsu||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2273|P]] ||Additional one [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2223|O]] ||
||11:20 ~ 11:40 (20) ||MIR (Sapphire)  ||E.Hirose||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2314|P]] ||- ||
||12:00 ~ 13:00 (60) ||||<style="text-align:center">Lunch||||<style="text-align:center"> ||
||13:00 ~ 15:00 (120) ||||<style="text-align:center">Closed Meeting||||<style="text-align:center"> ||
||18:00 ~ 20:00 ||||<style="text-align:center">Banquet at Hassai ||||<style="text-align:center"> ||
||||||||||<style="text-align:center"> ||
||||||||||<style="text-align:center">▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ 4th April (Fri) ▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ ||
||Time ||Title ||Speaker ||Presentation ||Document ||
||||||<style="text-align:center">bKAGRA Plan ||||<style="text-align:center"> ||
||10:00 ~ 11:00 (60) ||CRY (Suspension) ||H.Kimura/K.Yamamoto ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2280|x]], [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2280|P]] ||- ||
||10:00 ~ 10:20 (20) ||MIF/IOO (bKAGRA)--> ''Canceled'' ||Y.Aso/K.Somiya ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=xxx|x]], [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=xxx|x]] ||- ||
||11:00 ~ 10:20 (20) ||AOS (Baffle, BRT) ||T.Akutsu ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2273|P]] ||Additional one [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2223|O]] ||
||11:20 ~ 11:40 (20) ||MIR (Sapphire) ||E.Hirose ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2314|P]] ||- ||
||12:00 ~ 13:00 (60) ||||<style="text-align:center">Lunch ||||<style="text-align:center"> ||
||13:00 ~ 15:00 (120) ||||<style="text-align:center">Closed Meeting ||||<style="text-align:center"> ||
Line 148: Line 177:
[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2307|FCL-VAC Schedule]]
[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2313|Other Schedule]]



[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2307|FCL-VAC Schedule]] [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2313|Other Schedule]]
Line 154: Line 184:
||Giovanni Losurdo|| Advanced Virgo Project Leader, INFN Firenze - European Gravitational Observatory|| ||
||Harald Lueck||GEO/ Institut für Gravitationsphysik der Leibniz Universität Hannover und Max-Planck Institut für Gravitationsphysik|| ||
||Mike Landry||LIGO-Lab/ California Institute of Technology  || ||
||Rana Adhikari||LIGO-Lab/ California Institute of Technology  || ||
||Giovanni Losurdo ||Advanced Virgo Project Leader, INFN Firenze - European Gravitational Observatory || ||
||Harald Lueck ||GEO/ Institut für Gravitationsphysik der Leibniz Universität Hannover und Max-Planck Institut für Gravitationsphysik || ||
||Mike Landry ||LIGO-Lab/ California Institute of Technology || ||
||Rana Adhikari ||LIGO-Lab/ California Institute of Technology || ||
Line 167: Line 197:
Line 178: Line 209:
||20:15-20:45 ||Important issues ||Kawamura ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1290 |iKAGRA scope, Human resources, X-end access and Installation/commissioning]] || ||20:15-20:45 ||Important issues ||Kawamura ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1290|iKAGRA scope, Human resources, X-end access and Installation/commissioning]] ||


External Review (in English)


4th External Review (Date: June 29(Mon) - July 1(Wed), 2015)

Scope

Technical review of bKAGRA design and installation plan Current status of iKAGRA construction will be provided as well.

Program

▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ 29th June (Mon) ▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄

Time

Title

Speaker

Presentation

Document

9:00 ~ 9:10

Closed Session by Reviewers

9:10 ~ 10:00

Project Overview

Welcome Talk (10min)

M. Ohashi

X

-

Project Overview (20min)

Y. Saito

X

-

Overview of this Review (20min)

M. Ando

X

-

10:00 ~ 10:40

Introduction (Tunnel and Facility)

Tunnel/ Vacuum System (20min)

T. Uchiyama

X

-

Facility (20min)

S. Miyoki

X

-

10:40 ~ 11:00

Discussion

Kamioka Tour

11:00 ~ 12:20

Move to Kamioka site (Lunch in bus)

12:20 ~ 16:40

On-Site Discussion

16:40 ~ 18:00

Move back to Toyama

▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ 30th June (Tue) ▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄

Time

Title

Speaker

Presentation

Document

9:00 ~ 12:00

Item (1) : bKAGRA Configuration and Plan

TBD (30min)

K. Somiya

X

-

TBD (30min)

Y. Aso

X

-

TBD (20min)

Y. Saito

X

-

TBD (20min)

T. Uchiyama

X

-

12:00 ~ 13:20

Lunch

13:20 ~ 17:00

Item (2) : Vibration Isolation

Overview of KAGRA VIS

R. Takahashi

X

-

Mechanical Installation Procedure

R. Takahashi

X

-

Clean Installation Procedure

E. Hirose

X

-

Measurement of the mirror positions

Y. Saito

X

-

Control and Tuning of the suspensions

T. Sekiguchi

X

-

17:00 ~ 18:00

Discussion (answers to questions on the 1st day)

18:00 ~

Banquet

▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ 1st July (Wed) ▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄

Time

Title

Speaker

Presentation

Document

9:00 ~ 12:00

Item (3) : Cryogenics and Test mass

Cryogenic Payload / Cryogenics (60min)

K. Yamamoto

X

-

Sapphire Mirrors / bKAGRA Mirrors (60min)

E. Hirose

X

-

12:00 ~ 13:20

Lunch

13:20 ~ 15:40

Item (4) : High Power Operation

Overview (15min)

S. Kawamura

X

-

High-power laser (15min)

R. Nishiuchi

X

-

Pre-stabilization system (15min)

M. Nakano

X

-

Baffle (15min)

T. Akutsu

X

-

15:40 ~

Discussion (answers to questions on the 2nd day)

~ 16:30

Closed Session by Reviewer

16:30 ~ 16:40

Short summary and Closing remarks

16:40

Adjourn

Program

Items to be discussed (Preliminary)

(1) bKAGRA configuration and Plan
  • bKAGRA configuration [Somiya, ~30min + Discussion]
  • Constraints and plan on budget and milestones [Aso, ~30min + Discussion]
  • Influence of the cost saving (VAC + FCL) [Saito, ~20min + Discussion]
  • Commissioning plan based on current situation [Uchiyama, ~20min + Discussion]

(2) Vibration isolation
  • Overview of the KAGRA Vibration Isolation System [R. Takahashi]
  • Installation Procedure
    • Mechanical Installation [R. Takahashi]
    • Clean installation of the mirrors [E. Hirose]
    • Measurement and verification of the mirror position/orientation. [Y. Saito]
  • Control and tuning of the suspension systems. [T. Sekiguchi]

(3) Cryo-payload and sapphire test masses
  • Cryogenic Payload / Cryogenics [Yamamoto]
  • Sapphire Mirrors / bKAGRA Mirrors [Hirose]

(4) High Power Operation
  • Overview [Kawamura, 15min + Discussion]
  • High-power laser [R. Nishiuchi, 15min + Discussion]
  • Pre-stabilization system [M. Nakano, 15min + Discussion]
  • Baffle [Akutsu, 15min + Discussion]

References

Reviewers

Name

Affiliation

Remarks

Mike Zucker

LIGO-Lab/ Massachusetts Institute of Technology

Chair

Rana Adhikari

LIGO-Lab/ California Institute of Technology

Katsunobu Oide

KEK

Norna Robertson

California Institute of Technology

Valery Frolov

LIGO-Lab/ California Institute of Technology

Ho Jung Paik

University of Maryland

Keith Thorne

California Institute of Technology

KAGRA Participants

Tomotada AKUTSU, Shinji MIYOKI, Ryutaro TAKAHASHI, Yuta MICHIMURA, Osamu MIYAKAWA, Kazuhiro YAMAMOTO, Kentaro SOMIYA, Seiji KAWAMURA, Masayuki NAKANO, Naoko OHISHI, Yoshio SAITO, Takashi UCHIYAMA, Kazuhiro HAYAMA, Ryota NISHIUCHI, Masaki ANDO, Takaaki KAJITA, Raffaele FLAMINIO, Masatake OHASHI, Eiichi HIROSE


3rd External Review (Date: April 2(Tue) - April 4(Fri), 2014)

  • Location and access: ICRR U-tokyo, Kashiwa campus, 6F large conference roomAccess

  • Bus time schadule from the west entrance of JR KASHIWA station is here

  • The Seevogh access is prepared for AM and PM for each day, independently. The remote participants using EVO are allowed only to listen.
  • WiFi in ICRR 6F large conference room ESSID : 00icrr-11g/b (invisible), WEP : Plese see the information in the room.

Program and Presentations/Documents

[P] : Preliminary. [O] : file is available. [X] : file is not yet available. [-] : file is not required.

▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ 2nd April (Wed) ▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄

Time

Title

Speaker

Presentation

Document

Project Overview

10:00 ~ 10:10 (10)

Welcome Address and Introduction

T.Kajita

O

-

10:10 ~ 10:30 (20)

Scope of External Review

M.Ando

O

-

10:30 ~ 10:40 (10)

Budget Status

M.Ohashi

O

-

10:40 ~ 11:00 (20)

Scope/Overall Schedule

K.Somiya/Y.Saito

OP

-

11:00 ~ 11:30 (30)

Installation and Commissioning Plan

M.Ohashi/S.Kawamura

O

-

11:30 ~ 12:00 (30)

TUN/FCL/GIF(env)

T.Uchiyama/S.Miyoki/A.Araya

O,O ,O

FCL-VAC

12:00 ~ 13:00 (60)

Lunch

iKAGRA Plan 1

13:00 ~ 13:30 (30)

VAC/CRY(cryostat)/GIF(vac)

Y.Saito/T.Suzuki/A.Araya

P,O

-

13:30 ~ 14:30 (60)

IOO/LAS

K.Kawamura, N.Mio

O, x

-

14:30 ~ 15:10 (40)

Closed Meeting and Break

15:10 ~ 15:30 (20)

MIR (Silica Optics)

E.Hirose

O

-

15:30 ~ 16:30 (60)

VIS

R.Takahashi

P

-

16:30 ~ 17:30 (60)

Closed Meeting

Dinner

▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ 3rd April (Thu) ▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄

Time

Title

Speaker

Presentation

Document

iKAGRA Plan 2

10:00 ~ 11:00 (60)

MIF (iKAGRA)

Y.Aso

P

-

11:00 ~ 11:30 (30)

AOS(oplev, viewport)

T.Akutsu

O

Another file.O

11:30 ~ 13:00 (90)

Lunch

13:00 ~ 13:30 (30)

DGS

O.Miyakawa

O

O O O

13:30 ~ 14:00 (30)

AEL

O.Miyakawa

O

O

14:00 ~ 15:00 (60)

DMG/DAS/DetChar

N.Kanda, H.Tagoshi, K.Hayama

o,O, O

-

15:00 ~ 15:30 (30)

Closed Meeting and Break

15:30 ~ 16:30 (60)

Reserved

16:30 ~ 17:30 (60)

Closed Meeting

18:00 ~ 20:00

Banquet at Hassai

▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ 4th April (Fri) ▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄

Time

Title

Speaker

Presentation

Document

bKAGRA Plan

10:00 ~ 11:00 (60)

CRY (Suspension)

H.Kimura/K.Yamamoto

x, P

-

10:00 ~ 10:20 (20)

MIF/IOO (bKAGRA)--> Canceled

Y.Aso/K.Somiya

x, x

-

11:00 ~ 10:20 (20)

AOS (Baffle, BRT)

T.Akutsu

P

Additional one O

11:20 ~ 11:40 (20)

MIR (Sapphire)

E.Hirose

P

-

12:00 ~ 13:00 (60)

Lunch

13:00 ~ 15:00 (120)

Closed Meeting

15:00 ~ 15:30 (30)

Concluding Session

15:30 ~ 17:00 (90)

Closed Meeting

FCL-VAC Schedule Other Schedule

Reviewers

Name

Affiliation

Remarks

Giovanni Losurdo

Advanced Virgo Project Leader, INFN Firenze - European Gravitational Observatory

Harald Lueck

GEO/ Institut für Gravitationsphysik der Leibniz Universität Hannover und Max-Planck Institut für Gravitationsphysik

Mike Landry

LIGO-Lab/ California Institute of Technology

Rana Adhikari

LIGO-Lab/ California Institute of Technology

Michael E. Zucker

LIGO-Lab/ Massachusetts Institute of Technology

Chair

Secretariat

Seiji Kawamura

KAGRA/ICRR

Masaki Ando

KAGRA/Tokyo Univ.

Chief

Kentaro Somiya

KAGRA/Tokyo Institute of Technology

Deputy chief

Shinji Miyoki

KAGRA/ICRR


Answers for 2nd External Reviewers (Date: 20:00 (Japan Time), September 25(Tue), 2012)

20:00-20:15

Opening Address

Kajita

What happened since the last external review

20:15-20:45

Important issues

Kawamura

iKAGRA scope, Human resources, X-end access and Installation/commissioning

20:45-21:45

Technical issues

Miyoki

VIS, AOS, FCL, FCL about Laser, and IOO

Yamamoto

CRY

Somiya

MIF, IOO and LAS

Ando

DGS and DAS/DMG

21:45-22:00

Discussion and Opinions from Reviewers

22:00

Closing Remark

Kajita


2nd External Review (Date: April 17(Tue) - April 20(Fri), 2012)

  • Location and access: ICRR U-tokyo, Kashiwa campus, 6F large conference roomAccess

  • Note!!: In only 19th PM, the venue is not the 6F large conference room in ICRR building, but the large conference room at the 6F floor (room:633) in 1st Research Complex building that is just next to the ICRR building.Access

  • Banquet is held in 18th evening at the "Hassai" in the La La port.Access in Japanese

  • Bus time schadule from the west entrance of JR KASHIWA station is here

  • The EVO access is prepared for AM and PM for each day, independently. The remote participants using EVO are allowed only to listen.
  • WiFi in ICRR 6F large conference room ESSID : 00icrr-11g/b (invisible), WEP : Plese see the information in the room.

  • WiFi in RC 6F conference room ESSID: gwextreview, WEP : Plese see the information in the room.

References

[O] : file is available. [X] : file is not yet available. [-] : file is not required.

Program and Presentations/Documents

[O] : file is available. [X] : file is not yet available. [-] : file is not required.

4/17 (Tue)

Time

Title

Speaker

Presentation

Document

EVO(17:AM)

10:00-10:20 (20)

(SEO):Objectives and Scope of this External Review

S.Kawamura

O

-

10:20-10:40 (20)

(EC ):KAGRA Project Status

T.Kajita

O

-

10:40-10:55 (15)

(EC ):Budget Status

M.Ohashi

O

-

10:55-11:15 (20)

(EC ):Program Advisory Board Report and our Response

T.Kajita

O

-

11:15-11:35 (20)

(EC ):International Collaboration Status

K.Kuroda

O

-

Lunch (11:35 ~ 13:00)

EVO(17:PM)

13:00-13:25 (25)

(SEO):System Engineering Management Plan (SEMP)

I.Nakatani

O

-

13:25-13:50 (25)

(SEO):KAGRA Sensitivity with Practical Parameters

K.Somiya

O

-

13:50-14:35(45)

(SEO):Interface Control

K.Somiya

O

Interface list, ICD

Coffee Break (14:35 ~ 14:45)

14:45-15:55(50)

(SEO):Roadmap and Bottom-up Schedule

M.Ando

O

Bottom Up Schedule

15:55-16:25 (30)

(SEO):Risk Management

M.Ando

O

Risk factors

4/18 (Wed)

Time

Title

Speaker

Presentation

Document

EVO(18:AM)

09:30-09:45 (15)

(SEO):Layout

S.Miyoki

O

-

09:45-09:55 (10)

(SEO):Performance Measurement System

S.Miyoki

O

-

09:55-10:05 (10)

(SEO):Inventory Management

S.Miyoki

O

-

10:05-11:00 (55)

(VAC):Vacuum

Y.Saito

O

O

11:00-12:00 (60)

(VIS):Vibration Isolation

R.Takahashi

O

O

Lunch (12:00~ 13:15)

EVO(18:PM)

13:15-14:05 (50)

(VIS2):Vibration Isolation

R.DeSalvo

O

-

14:05-15:10 (40)

(CRY1):Cryogenic System

T.Suzuki, N.Kimura

O

O

Coffee Break (15:10 ~ 15:20)

15:20-15:55(35)

(CRY2):Cryo-payload

K.Yamamoto

O

O same with CRY1

15:55-16:25 (25)

(TUN):Tunnel

T.Uchiyama

O

O

16:25-16:35 (10)

(GIF):Geophysical Strainmeter

A.Araya

O

O

18:00-20:00

Banquet (Hassai in Lala port)

4/19 (Thu)

Time

Title

Speaker

Presentation

Document

EVO(19:AM)

10:00-10:50 (50)

(MIF1):Length Control

Y.Aso

O

O1
O2

10:50-11:40 (50)

(MIF2):Alignment Control

Y.Aso et.al.

-

-

11:40-12:00 (20)

Interlock

Y.Aso et. al.

-

-

Lunch (12:00 ~ 13:00)

EVO(19:PM)

13:00-13:30 (30)

(IOO):Input Output Optics

S.Telada

O

O

13:30-14:00 (30)

(AOS):Auxiliary Optics

T.Akutsu

O

O

14:00-14:20 (20)

(DGS):Digital System

O.Miyakawa

O

O

Coffee Break (14:20 ~ 14:40)

14:40-15:00 (20)

(DAS):Data Analysis

N.Kanda

O

O

15:00-15:20 (20)

(MIF4):Detector Characterization

K.Hayama

O

O

15:20-16:00 (40)

(LAS):Laser

N. Mio

O

O

16:00-16:20 (20)

(MIR):Mirror

N. Mio

O

O

4/20 (Fri)

Time

Title

Speaker

Presentation

Document

EVO(20:AM)

10:00-12:00

Closed Session

Reviewers

Lunch (12:00 ~ 13:30)

13:30-

Closed Session

Reviewers

Reviewers

Name

Affiliation

Remarks

Stefan Ballmer

LSC/ Syracuse University

Raffaele Flaminio

Laboratoire des Matériaux Avancés - CNRS/IN2P3

Andreas Freise

GEO/ University of Birmingham

Roberto Passaquieti

Virgo/ University of Pisa

David Ottaway

ACIGA&LSC/ University of Adelaide

Benno Willke

GEO/ Leibniz Universität Hannover

Michael E. Zucker

LIGO-Lab/ Massachusetts Institute of Technology

Chair

Secretariat

Seiji Kawamura

KAGRA/ICRR

Chief

Masaki Ando

KAGRA/Kyoto Univ.

Deputy chief

Ichiro nakatani

KAGRA/ICRR

Shinji Miyoki

KAGRA/ICRR

Kentaro Somiya

KAGRA/Tokyo Institute of Technology

Note for presenters (in Japanese)

  • 1. Overview
    • 1-1. Definition and scope of the subsystem
      • (該当サブシステムの一般的な定義、特にどのサブシステムに属するか明白でない項目についても明記)
    • 1-2. Important interface
      • (該当サブシステムと他のサブシステムとの間のインターフェースについての一般的な記述、特に重要なものについては詳述)
    • 1-3. Design phase
      • (iKAGRAの最終設計、bKAGRAの予備設計という範疇に入らないものを明記)
  • 2. iKAGRA
    • 2-1. Target specifications(目標仕様、重要なスペックだけでよい)
    • 2-2. Final design
      • デザインの記述、最終設計により目標仕様を満たすことができることの説明を加えてください。
    • 2-3. Schedule
    • 2-4. Quality assurance
      • 製造過程において性能を保障するための方策
      • 購入・製作物品の性能確認方法
    • 2-5. Installation scenario
    • 2-6. Risk management(各リスクを可能性と重大さに応じて評価、対策を講じる(SEMP参照))
  • 3. bKAGRA
    • 3-1. Requirements
    • 3-2. Preliminary design
      • 予備設計により要求値を満たすことができることの説明を含めてください
    • 3-3. Schedule
    • 3-4. Prototype test (if any)(予備設計の妥当性を確かめるためのプロトタイプテストの計画)
    • 3-5. Quality assurance
      • 製造過程において性能を保障するための方策
      • 購入・製作物品の性能確認方法
    • 3-6. Installation scenario
    • 3-7. Risk management
  • Appendix
    • A. Design changes that have been made with the suggestions in the 1st external review (if any)
      • (前回の外部レビューで推奨された案件に従って設計の変更を行ったものを列挙)
    • B. Items that have been reduced in cost (if any)
      • (以前の設計でオーバースペックだったが、予算削減のためにスペックダウンした項目
    • C.Human resources
      • 今後必要とされるマンパワー(人数)を2018年まで1年ごとに表示してください。



LCGT/Meeting/Reviews/External (last edited 2021-09-26 19:08:47 by miyoki)