Differences between revisions 1 and 68 (spanning 67 versions)
Revision 1 as of 2010-11-08 16:17:19
Size: 211
Comment:
Revision 68 as of 2011-02-22 18:12:10
Size: 4664
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= Reviews = = Subsystem Reviews =
 * Guideline of the review process is [[attachment:LCGT/Meeting/Leader/20101025/101025 レビューのガイドライン-2.doc|here]].
Line 3: Line 4:
 * Guideline of the review process is [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=236|here|width=300]]. ----
Line 5: Line 6:
=== A Reviews === === Review A (Internal Review, mainly in Japanese) ===
==== 2010.11.8 Digital System Review (by O.Miyakawa) ====
 * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=208|technical report]]
 * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=235|presentation]]
 * [[digital_review101108.txt|Minutes]]
Line 7: Line 12:
=== B Reviews === ==== 2010.11.22 Mirror (by N.Mio) ====
 * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=252|presentation]]
 * [[digital_review101129_1|Minutes]]
Line 9: Line 16:
=== C Reviews === ==== 2010.11.29 Seismic attenuation (by R.Takahashi) ====
 . [[LCGT/Meeting/Reviews/20101129/EVO|EVO connection]]

 * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=257|presentation]] (Takahashi)
 * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=255|presentation]] (De''''''Salvo)
 * [[digital_review101122|Minutes]]

==== 2010.12.7 Interferometer (by Somiya, Aso) ====
 * Optical Configuration [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=267|presentation]] (Somiya)
 * Interferometer Sensing and Control [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=268|presentation]] (Aso)
 * [[ifo_review101207|Minutes (IFO)]]
 * [[ifo_review101207_2|Minutes (ISC)]]

==== 2010.12.20 Seismic attenuation 2 (by R.Takahashi) ====
 * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=283|presentation]] (Takahashi)
 * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=282|presentation]] (Uchiyama)

 * [[ifo_review101220_1|Minutes]]


==== 2010.12.20 Input-Output Optics (by Telada) ====
 * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=284|presentation]] (Ohmae)
 * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=285|presentation]] (Telada)

 * [[ifo_review101220_2|Minutes]]


==== 2011.1.25 Interferometer 2 (by K.Somiya) ====
 * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=300|presentation]] (Somiya)
 * [[ifo_review110125|Minutes]]

==== 2011.1.31 Seismic attenuation 3 (by R.Takahashi) ====
 * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=305|presentation]] (Takahashi)
 * [[http://tamago.mtk.nao.ac.jp/~arai/20110103/TAMA_SAS_Review.pdf|presentation]] (Arai)

 * [[review110131_1|Minutes]]

==== 2011.1.31 Cryogenics 2 (by T.Suzuki) ====
 [[attachment:cryo20110131rev.ppt]]

 * [[review110131_2|Minutes]]

==== 2011.2.7 Analog Electronics (by S.Moriwaki) ====
 * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=339|presentation]]

 * [[review110207_1|Minutes]]

==== 2011.2.7 Mirror (by N.Mio) ====
 * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=337|presentation]]

 * [[review110207_2|Minutes]]

==== 2011.2.7 Laser (by N.Mio) ====
 * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=338|presentation]]

 * [[review110207_3|Minutes]]

----
=== Review A' (in Japanese) ===
==== 2010.11.29 Cryogenics (by T.Suzuki) ====
       [[LCGT/Meeting/Reviews/20101129/EVO|EVO connection]]

 * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=256|presentation]]
 * [[digital_review101129_2|Minutes]]

----
=== B Reviews (in English) ===

Review documents
||Subgroup name||JGWdoc number||
||Digital system||[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=359|T1100359]]||



Program

||||||2/28||
||9:50-10:00||||Opening||
||10:00-12:00||Detector Configuration & Roadmap 1||Presentation File||
||13:30-15:30||Detector Configuration & Roadmap 1||Presentation File||
||16:00-18:00||Data Analysis||Presentation File||
||||||||
||||||3/1||
||10:00-12:00||Vibration Isolation 1||Presentation File||
||13:30-15:00||Vibration Isolation 2||Presentation File||
||15:30-16:30||Cryogenics||Presentation File||
||16:30-17:00||Vacuum||Presentation File||
||17:00-17:30||Tunnel||Presentation File||
||17:30-18:00||Geophysics Interferometer||Presentation File||
||||||||
||||||3/2||
||10:00-12:00||Laser||Presentation File||
||13:30-15:30||Mirror||Presentation File||
||16:00-17:00||Facility||Presentation File||
||||||||
||||||3/4||
||10:00-11:00||Analog Electronics||Presentation File||
||11:00-12:00||Digital System||Presentation File||
||13:30-15:30||||Discussion among reviewers||


----
=== C Reviews (in English) ===
----
<<BR>>

[[LCGT|LCGT wiki top]]

Subsystem Reviews

  • Guideline of the review process is here.


Review A (Internal Review, mainly in Japanese)

2010.11.8 Digital System Review (by O.Miyakawa)

2010.11.22 Mirror (by N.Mio)

2010.11.29 Seismic attenuation (by R.Takahashi)

2010.12.7 Interferometer (by Somiya, Aso)

2010.12.20 Seismic attenuation 2 (by R.Takahashi)

2010.12.20 Input-Output Optics (by Telada)

2011.1.25 Interferometer 2 (by K.Somiya)

2011.1.31 Seismic attenuation 3 (by R.Takahashi)

2011.1.31 Cryogenics 2 (by T.Suzuki)

2011.2.7 Analog Electronics (by S.Moriwaki)

2011.2.7 Mirror (by N.Mio)

2011.2.7 Laser (by N.Mio)


Review A' (in Japanese)

2010.11.29 Cryogenics (by T.Suzuki)


B Reviews (in English)

Review documents

Subgroup name

JGWdoc number

Digital system

T1100359

Program

2/28

9:50-10:00

Opening

10:00-12:00

Detector Configuration & Roadmap 1

Presentation File

13:30-15:30

Detector Configuration & Roadmap 1

Presentation File

16:00-18:00

Data Analysis

Presentation File

3/1

10:00-12:00

Vibration Isolation 1

Presentation File

13:30-15:00

Vibration Isolation 2

Presentation File

15:30-16:30

Cryogenics

Presentation File

16:30-17:00

Vacuum

Presentation File

17:00-17:30

Tunnel

Presentation File

17:30-18:00

Geophysics Interferometer

Presentation File

3/2

10:00-12:00

Laser

Presentation File

13:30-15:30

Mirror

Presentation File

16:00-17:00

Facility

Presentation File

3/4

10:00-11:00

Analog Electronics

Presentation File

11:00-12:00

Digital System

Presentation File

13:30-15:30

Discussion among reviewers


C Reviews (in English)



LCGT wiki top

LCGT/Meeting/Reviews (last edited 2012-06-06 12:35:10 by OsamuMiyakawa)