1409
Comment:
|
1974
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= Reviews = |
= Subsystem Reviews = |
Line 7: | Line 6: |
=== A Reviews (in Japanese) === ==== 2010.11.8 Digital System Review by O.Miyakawa ==== |
=== Review A (Internal Review, mainly in Japanese) === ==== 2010.11.8 Digital System Review (by O.Miyakawa) ==== |
Line 13: | Line 12: |
==== 2010.11.22 Mirror Review by N.Mio ==== | ==== 2010.11.22 Mirror (by N.Mio) ==== |
Line 15: | Line 14: |
* [[digital_review101129_1|Minutes]] | |
Line 16: | Line 16: |
==== 2010.11.29 Seismic attenuation Review by R.Takahashi ==== [[LCGT/Meeting/Reviews/20101129/EVO|EVO connection]] * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=257|presentation]](Takahashi) * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=255|presentation]](De''''''Salvo) |
==== 2010.11.29 Seismic attenuation (by R.Takahashi) ==== . [[LCGT/Meeting/Reviews/20101129/EVO|EVO connection]] |
Line 21: | Line 19: |
==== 2010.12.7 Interferometer Review ==== | * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=257|presentation]] (Takahashi) * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=255|presentation]] (De''''''Salvo) * [[digital_review101122|Minutes]] |
Line 23: | Line 23: |
==== 2010.12.20 Input-Output Optics Review ==== | ==== 2010.12.7 Interferometer (by Somiya, Aso) ==== * Optical Configuration [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=267|presentation]] (Somiya) * Interferometer Sensing and Control [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=268|presentation]] (Aso) * [[ifo_review101207|Minutes (IFO)]] * [[ifo_review101207_2|Minutes (ISC)]] ==== 2010.12.20 Seismic attenuation 2 (by R.Takahashi) ==== ==== 2010.12.20 Input-Output Optics (by Telada) ==== |
Line 26: | Line 36: |
=== A' Reviews (in Japanese) === ==== 2010.11.29 Cryostat Review by T.Suzuki ==== [[LCGT/Meeting/Reviews/20101129/EVO|EVO connection]] |
=== Review A' (in Japanese) === ==== 2010.11.29 Cryostat Review (by T.Suzuki) ==== [[LCGT/Meeting/Reviews/20101129/EVO|EVO connection]] |
Line 31: | Line 41: |
* [[digital_review101129_2|Minutes]] | |
Line 34: | Line 45: |
Line 37: | Line 47: |
Subsystem Reviews
Guideline of the review process is here.
Review A (Internal Review, mainly in Japanese)
2010.11.8 Digital System Review (by O.Miyakawa)
2010.11.22 Mirror (by N.Mio)
2010.11.29 Seismic attenuation (by R.Takahashi)
presentation (Takahashi)
presentation (DeSalvo)
2010.12.7 Interferometer (by Somiya, Aso)
Optical Configuration presentation (Somiya)
Interferometer Sensing and Control presentation (Aso)
2010.12.20 Seismic attenuation 2 (by R.Takahashi)
2010.12.20 Input-Output Optics (by Telada)
Review A' (in Japanese)
2010.11.29 Cryostat Review (by T.Suzuki)
B Reviews (in English)
C Reviews (in English)