1813
Comment:
|
2750
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= Reviews = |
= Subsystem Reviews = |
Line 7: | Line 6: |
=== A Reviews (in Japanese) === ==== 2010.11.8 Digital System Review by O.Miyakawa ==== |
=== Review A (Internal Review, mainly in Japanese) === ==== 2010.11.8 Digital System Review (by O.Miyakawa) ==== |
Line 13: | Line 12: |
==== 2010.11.22 Mirror Review by N.Mio ==== | ==== 2010.11.22 Mirror (by N.Mio) ==== |
Line 17: | Line 16: |
==== 2010.11.29 Seismic attenuation Review by R.Takahashi ==== [[LCGT/Meeting/Reviews/20101129/EVO|EVO connection]] |
==== 2010.11.29 Seismic attenuation (by R.Takahashi) ==== . [[LCGT/Meeting/Reviews/20101129/EVO|EVO connection]] |
Line 23: | Line 23: |
==== 2010.12.7 Interferometer Review ==== | ==== 2010.12.7 Interferometer (by Somiya, Aso) ==== |
Line 26: | Line 26: |
* [[ifo_review101207|Minutes]] | * [[ifo_review101207|Minutes (IFO)]] * [[ifo_review101207_2|Minutes (ISC)]] |
Line 28: | Line 29: |
==== 2010.12.20 Input-Output Optics Review ==== | ==== 2010.12.20 Seismic attenuation 2 (by R.Takahashi) ==== * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=283|presentation]] (Takahashi) * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=282|presentation]] (Uchiyama) * [[ifo_review101220_1|Minutes]] ==== 2010.12.20 Input-Output Optics (by Telada) ==== * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=284|presentation]] (Ohmae) * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=285|presentation]] (Telada) * [[ifo_review101220_2|Minutes]] ==== 2011.1.17 Interferometer 2 (by K.Somiya) ==== * Detector Configuration [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=300|presentation]] (Somiya) ==== 2011.1.31 Seismic attenuation 3 (by R.Takahashi) ==== ==== 2011.1.31 Cryogenics 2 (by T.Suzuki) ==== |
Line 31: | Line 52: |
=== A' Reviews (in Japanese) === ==== 2010.11.29 Cryostat Review by T.Suzuki ==== [[LCGT/Meeting/Reviews/20101129/EVO|EVO connection]] |
=== Review A' (in Japanese) === ==== 2010.11.29 Cryogenics (by T.Suzuki) ==== [[LCGT/Meeting/Reviews/20101129/EVO|EVO connection]] |
Line 40: | Line 61: |
Line 43: | Line 63: |
Subsystem Reviews
Guideline of the review process is here.
Review A (Internal Review, mainly in Japanese)
2010.11.8 Digital System Review (by O.Miyakawa)
2010.11.22 Mirror (by N.Mio)
2010.11.29 Seismic attenuation (by R.Takahashi)
presentation (Takahashi)
presentation (DeSalvo)
2010.12.7 Interferometer (by Somiya, Aso)
Optical Configuration presentation (Somiya)
Interferometer Sensing and Control presentation (Aso)
2010.12.20 Seismic attenuation 2 (by R.Takahashi)
presentation (Takahashi)
presentation (Uchiyama)
2010.12.20 Input-Output Optics (by Telada)
presentation (Ohmae)
presentation (Telada)
2011.1.17 Interferometer 2 (by K.Somiya)
Detector Configuration presentation (Somiya)
2011.1.31 Seismic attenuation 3 (by R.Takahashi)
2011.1.31 Cryogenics 2 (by T.Suzuki)
Review A' (in Japanese)
2010.11.29 Cryogenics (by T.Suzuki)
B Reviews (in English)
C Reviews (in English)