Size: 1858
Comment:
|
Size: 1904
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= Reviews = |
= Subsystem Reviews = |
Line 7: | Line 6: |
=== A Reviews (in Japanese) === ==== 2010.11.8 Digital System Review by O.Miyakawa ==== |
=== Review A (Internal Review, mainly in Japanese) === ==== 2010.11.8 Digital System Review (by O.Miyakawa) ==== |
Line 13: | Line 12: |
==== 2010.11.22 Mirror Review by N.Mio ==== | ==== 2010.11.22 Mirror (by N.Mio) ==== |
Line 17: | Line 16: |
==== 2010.11.29 Seismic attenuation Review by R.Takahashi ==== [[LCGT/Meeting/Reviews/20101129/EVO|EVO connection]] |
==== 2010.11.29 Seismic attenuation (by R.Takahashi) ==== [[LCGT/Meeting/Reviews/20101129/EVO|EVO connection]] |
Line 23: | Line 23: |
==== 2010.12.7 Interferometer Review ==== | ==== 2010.12.7 Interferometer (by Somiya, Aso) ==== |
Line 27: | Line 27: |
* [[ifo_review101207|Minutes (ISC)]] | * [[ifo_review101207_2|Minutes (ISC)]] |
Line 29: | Line 29: |
==== 2010.12.20 Input-Output Optics Review ==== |
==== 2010.12.20 Input-Output Optics (by Telada) ==== |
Line 32: | Line 31: |
=== A' Reviews (in Japanese) === ==== 2010.11.29 Cryostat Review by T.Suzuki ==== |
=== Review A' (in Japanese) === ==== 2010.11.29 Cryostat Review (by T.Suzuki) ==== |
Line 41: | Line 40: |
Line 44: | Line 42: |
Subsystem Reviews
Guideline of the review process is here.
Review A (Internal Review, mainly in Japanese)
2010.11.8 Digital System Review (by O.Miyakawa)
2010.11.22 Mirror (by N.Mio)
2010.11.29 Seismic attenuation (by R.Takahashi)
presentation (Takahashi)
presentation (DeSalvo)
2010.12.7 Interferometer (by Somiya, Aso)
Optical Configuration presentation (Somiya)
Interferometer Sensing and Control presentation (Aso)
2010.12.20 Input-Output Optics (by Telada)
Review A' (in Japanese)
2010.11.29 Cryostat Review (by T.Suzuki)
B Reviews (in English)
C Reviews (in English)