Size: 1899
Comment:
|
Size: 2177
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
Line 13: | Line 12: |
==== 2010.11.22 Mirror Review (by N.Mio) ==== | ==== 2010.11.22 Mirror (by N.Mio) ==== |
Line 17: | Line 16: |
==== 2010.11.29 Seismic attenuation Review (by R.Takahashi) ==== [[LCGT/Meeting/Reviews/20101129/EVO|EVO connection]] |
==== 2010.11.29 Seismic attenuation (by R.Takahashi) ==== . [[LCGT/Meeting/Reviews/20101129/EVO|EVO connection]] |
Line 23: | Line 23: |
==== 2010.12.7 Interferometer Review ==== | ==== 2010.12.7 Interferometer (by Somiya, Aso) ==== |
Line 29: | Line 29: |
==== 2010.12.20 Input-Output Optics Review ==== | ==== 2010.12.20 Seismic attenuation 2 (by R.Takahashi) ==== * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=283|presentation]] (Takahashi) * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=282|presentation]] (Uchiyama) ==== 2010.12.20 Input-Output Optics (by Telada) ==== |
Line 32: | Line 37: |
=== Review A' (in Japanese) === ==== 2010.11.29 Cryostat Review by T.Suzuki ==== [[LCGT/Meeting/Reviews/20101129/EVO|EVO connection]] |
=== Review A' (in Japanese) === ==== 2010.11.29 Cryostat Review (by T.Suzuki) ==== [[LCGT/Meeting/Reviews/20101129/EVO|EVO connection]] |
Line 41: | Line 46: |
Line 44: | Line 48: |
Subsystem Reviews
Guideline of the review process is here.
Review A (Internal Review, mainly in Japanese)
2010.11.8 Digital System Review (by O.Miyakawa)
2010.11.22 Mirror (by N.Mio)
2010.11.29 Seismic attenuation (by R.Takahashi)
presentation (Takahashi)
presentation (DeSalvo)
2010.12.7 Interferometer (by Somiya, Aso)
Optical Configuration presentation (Somiya)
Interferometer Sensing and Control presentation (Aso)
2010.12.20 Seismic attenuation 2 (by R.Takahashi)
presentation (Takahashi)
presentation (Uchiyama)
2010.12.20 Input-Output Optics (by Telada)
Review A' (in Japanese)
2010.11.29 Cryostat Review (by T.Suzuki)
B Reviews (in English)
C Reviews (in English)