1895
Comment:
|
1902
|
Deletions are marked like this. | Additions are marked like this. |
Line 29: | Line 29: |
==== 2010.12.20 Input-Output Optics Review ==== | ==== 2010.12.20 Input-Output Optics (by Telada) ==== |
Line 33: | Line 33: |
==== 2010.11.29 Cryostat Review by T.Suzuki ==== | ==== 2010.11.29 Cryostat Review (by T.Suzuki) ==== |
Subsystem Reviews
Guideline of the review process is here.
Review A (Internal Review, mainly in Japanese)
2010.11.8 Digital System Review (by O.Miyakawa)
2010.11.22 Mirror (by N.Mio)
2010.11.29 Seismic attenuation (by R.Takahashi)
presentation (Takahashi)
presentation (DeSalvo)
2010.12.7 Interferometer (by Somiya, Aso)
Optical Configuration presentation (Somiya)
Interferometer Sensing and Control presentation (Aso)
2010.12.20 Input-Output Optics (by Telada)
Review A' (in Japanese)
2010.11.29 Cryostat Review (by T.Suzuki)
B Reviews (in English)
C Reviews (in English)