1902
Comment:
|
1904
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
Line 18: | Line 17: |
[[LCGT/Meeting/Reviews/20101129/EVO|EVO connection]] | [[LCGT/Meeting/Reviews/20101129/EVO|EVO connection]] |
Line 30: | Line 30: |
Line 32: | Line 31: |
=== Review A' (in Japanese) === | === Review A' (in Japanese) === |
Line 41: | Line 40: |
Line 44: | Line 42: |
Subsystem Reviews
Guideline of the review process is here.
Review A (Internal Review, mainly in Japanese)
2010.11.8 Digital System Review (by O.Miyakawa)
2010.11.22 Mirror (by N.Mio)
2010.11.29 Seismic attenuation (by R.Takahashi)
presentation (Takahashi)
presentation (DeSalvo)
2010.12.7 Interferometer (by Somiya, Aso)
Optical Configuration presentation (Somiya)
Interferometer Sensing and Control presentation (Aso)
2010.12.20 Input-Output Optics (by Telada)
Review A' (in Japanese)
2010.11.29 Cryostat Review (by T.Suzuki)
B Reviews (in English)
C Reviews (in English)