Subsystem Reviews
Guideline of the review process is here.
Review A (Internal Review, mainly in Japanese)
2010.11.8 Digital System Review (by O.Miyakawa)
2010.11.22 Mirror (by N.Mio)
2010.11.29 Seismic attenuation (by R.Takahashi)
presentation (Takahashi)
presentation (DeSalvo)
2010.12.7 Interferometer (by Somiya, Aso)
Optical Configuration presentation (Somiya)
Interferometer Sensing and Control presentation (Aso)
2010.12.20 Seismic attenuation 2 (by R.Takahashi)
presentation (Takahashi)
presentation (Uchiyama)
2010.12.20 Input-Output Optics (by Telada)
presentation (Ohmae)
presentation (Telada)
2011.1.17 Interferometer 2 (by K.Somiya)
Detector Configuration presentation (Somiya)
2011.1.31 Seismic attenuation 3 (by R.Takahashi)
2011.1.31 Cryogenics 2 (by T.Suzuki)
Review A' (in Japanese)
2010.11.29 Cryogenics (by T.Suzuki)
B Reviews (in English)
C Reviews (in English)