Size: 3262
Comment:
|
Size: 4536
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 51: | Line 51: |
* [[review110131_1|Minutes]] |
|
Line 53: | Line 55: |
* [[review110131_2|Minutes]] ==== 2011.2.7 Analog Electronics (by S.Moriwaki) ==== * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=339|presentation]] * [[review110207_1|Minutes]] |
|
Line 57: | Line 66: |
* [[review110207_2|Minutes]] |
|
Line 59: | Line 70: |
* [[review110207_3|Minutes]] |
|
Line 70: | Line 83: |
Review documents |||| Program ||||||2/28|| ||9:50-10:00||||Opening|| ||10:00-12:00||Detector Configuration & Roadmap 1||Presentation File|| ||13:30-15:30||Detector Configuration & Roadmap 1||Presentation File|| ||16:00-18:00||Data Analysis||Presentation File|| |||||||| ||||||3/1|| ||10:00-12:00||Vibration Isolation 1||Presentation File|| ||13:30-15:00||Vibration Isolation 2||Presentation File|| ||15:30-16:30||Cryogenics||Presentation File|| ||16:30-17:00||Vacuum||Presentation File|| ||17:00-17:30||Tunnel||Presentation File|| ||17:30-18:00||Geophysics Interferometer||Presentation File|| |||||||| ||||||3/2|| ||10:00-12:00||Laser||Presentation File|| ||13:30-15:30||Mirror||Presentation File|| ||16:00-17:00||Facility||Presentation File|| |||||||| ||||||3/4|| ||10:00-11:00||Analog Electronics||Presentation File|| ||11:00-12:00||Digital System||Presentation File|| ||13:30-15:30||||Discussion among reviewers|| |
Subsystem Reviews
Guideline of the review process is here.
Review A (Internal Review, mainly in Japanese)
2010.11.8 Digital System Review (by O.Miyakawa)
2010.11.22 Mirror (by N.Mio)
2010.11.29 Seismic attenuation (by R.Takahashi)
presentation (Takahashi)
presentation (DeSalvo)
2010.12.7 Interferometer (by Somiya, Aso)
Optical Configuration presentation (Somiya)
Interferometer Sensing and Control presentation (Aso)
2010.12.20 Seismic attenuation 2 (by R.Takahashi)
presentation (Takahashi)
presentation (Uchiyama)
2010.12.20 Input-Output Optics (by Telada)
presentation (Ohmae)
presentation (Telada)
2011.1.25 Interferometer 2 (by K.Somiya)
presentation (Somiya)
2011.1.31 Seismic attenuation 3 (by R.Takahashi)
presentation (Takahashi)
presentation (Arai)
2011.1.31 Cryogenics 2 (by T.Suzuki)
2011.2.7 Analog Electronics (by S.Moriwaki)
2011.2.7 Mirror (by N.Mio)
2011.2.7 Laser (by N.Mio)
Review A' (in Japanese)
2010.11.29 Cryogenics (by T.Suzuki)
B Reviews (in English)
Review documents
Program
2/28 |
||
9:50-10:00 |
Opening |
|
10:00-12:00 |
Detector Configuration & Roadmap 1 |
Presentation File |
13:30-15:30 |
Detector Configuration & Roadmap 1 |
Presentation File |
16:00-18:00 |
Data Analysis |
Presentation File |
3/1 |
||
10:00-12:00 |
Vibration Isolation 1 |
Presentation File |
13:30-15:00 |
Vibration Isolation 2 |
Presentation File |
15:30-16:30 |
Cryogenics |
Presentation File |
16:30-17:00 |
Vacuum |
Presentation File |
17:00-17:30 |
Tunnel |
Presentation File |
17:30-18:00 |
Geophysics Interferometer |
Presentation File |
3/2 |
||
10:00-12:00 |
Laser |
Presentation File |
13:30-15:30 |
Mirror |
Presentation File |
16:00-17:00 |
Facility |
Presentation File |
3/4 |
||
10:00-11:00 |
Analog Electronics |
Presentation File |
11:00-12:00 |
Digital System |
Presentation File |
13:30-15:30 |
Discussion among reviewers |
C Reviews (in English)