Differences between revisions 65 and 66
Revision 65 as of 2011-02-07 10:24:55
Size: 3579
Editor: ANDO Masaki
Comment:
Revision 66 as of 2011-02-22 18:09:04
Size: 4536
Comment:
Deletions are marked like this. Additions are marked like this.
Line 83: Line 83:

Review documents
||||



Program

||||||2/28||
||9:50-10:00||||Opening||
||10:00-12:00||Detector Configuration & Roadmap 1||Presentation File||
||13:30-15:30||Detector Configuration & Roadmap 1||Presentation File||
||16:00-18:00||Data Analysis||Presentation File||
||||||||
||||||3/1||
||10:00-12:00||Vibration Isolation 1||Presentation File||
||13:30-15:00||Vibration Isolation 2||Presentation File||
||15:30-16:30||Cryogenics||Presentation File||
||16:30-17:00||Vacuum||Presentation File||
||17:00-17:30||Tunnel||Presentation File||
||17:30-18:00||Geophysics Interferometer||Presentation File||
||||||||
||||||3/2||
||10:00-12:00||Laser||Presentation File||
||13:30-15:30||Mirror||Presentation File||
||16:00-17:00||Facility||Presentation File||
||||||||
||||||3/4||
||10:00-11:00||Analog Electronics||Presentation File||
||11:00-12:00||Digital System||Presentation File||
||13:30-15:30||||Discussion among reviewers||

Subsystem Reviews

  • Guideline of the review process is here.


Review A (Internal Review, mainly in Japanese)

2010.11.8 Digital System Review (by O.Miyakawa)

2010.11.22 Mirror (by N.Mio)

2010.11.29 Seismic attenuation (by R.Takahashi)

2010.12.7 Interferometer (by Somiya, Aso)

2010.12.20 Seismic attenuation 2 (by R.Takahashi)

2010.12.20 Input-Output Optics (by Telada)

2011.1.25 Interferometer 2 (by K.Somiya)

2011.1.31 Seismic attenuation 3 (by R.Takahashi)

2011.1.31 Cryogenics 2 (by T.Suzuki)

2011.2.7 Analog Electronics (by S.Moriwaki)

2011.2.7 Mirror (by N.Mio)

2011.2.7 Laser (by N.Mio)


Review A' (in Japanese)

2010.11.29 Cryogenics (by T.Suzuki)


B Reviews (in English)

Review documents

Program

2/28

9:50-10:00

Opening

10:00-12:00

Detector Configuration & Roadmap 1

Presentation File

13:30-15:30

Detector Configuration & Roadmap 1

Presentation File

16:00-18:00

Data Analysis

Presentation File

3/1

10:00-12:00

Vibration Isolation 1

Presentation File

13:30-15:00

Vibration Isolation 2

Presentation File

15:30-16:30

Cryogenics

Presentation File

16:30-17:00

Vacuum

Presentation File

17:00-17:30

Tunnel

Presentation File

17:30-18:00

Geophysics Interferometer

Presentation File

3/2

10:00-12:00

Laser

Presentation File

13:30-15:30

Mirror

Presentation File

16:00-17:00

Facility

Presentation File

3/4

10:00-11:00

Analog Electronics

Presentation File

11:00-12:00

Digital System

Presentation File

13:30-15:30

Discussion among reviewers


C Reviews (in English)



LCGT wiki top

LCGT/Meeting/Reviews (last edited 2012-06-06 12:35:10 by OsamuMiyakawa)