Differences between revisions 69 and 70
Revision 69 as of 2011-02-22 18:17:01
Size: 5096
Comment:
Revision 70 as of 2011-02-22 18:26:33
Size: 5294
Comment:
Deletions are marked like this. Additions are marked like this.
Line 104: Line 104:
||10:00-12:00||Main Interferometer 1||Presentation File||
||13:30-14:30||Main Interferometer 2||Presentation File||
||15:00-17:00||Input/Output Optics||Presentation File||
||||||||
||||||3/2||
Line 111: Line 116:
||||||3/2|| ||||||3/3||

Subsystem Reviews

  • Guideline of the review process is here.


Review A (Internal Review, mainly in Japanese)

2010.11.8 Digital System Review (by O.Miyakawa)

2010.11.22 Mirror (by N.Mio)

2010.11.29 Seismic attenuation (by R.Takahashi)

2010.12.7 Interferometer (by Somiya, Aso)

2010.12.20 Seismic attenuation 2 (by R.Takahashi)

2010.12.20 Input-Output Optics (by Telada)

2011.1.25 Interferometer 2 (by K.Somiya)

2011.1.31 Seismic attenuation 3 (by R.Takahashi)

2011.1.31 Cryogenics 2 (by T.Suzuki)

2011.2.7 Analog Electronics (by S.Moriwaki)

2011.2.7 Mirror (by N.Mio)

2011.2.7 Laser (by N.Mio)


Review A' (in Japanese)

2010.11.29 Cryogenics (by T.Suzuki)


B Reviews (in English)

Review documents

Subgroup name

Document number

Analog Electronics

T1100364

Main Interferometer

T1100363

Digital system

T1100359

Tunnel

T1100362

Vibration Isolation

T1100365

Program

2/28

9:50-10:00

Opening

10:00-12:00

Detector Configuration & Roadmap 1

Presentation File

13:30-15:30

Detector Configuration & Roadmap 1

Presentation File

16:00-18:00

Data Analysis

Presentation File

3/1

10:00-12:00

Main Interferometer 1

Presentation File

13:30-14:30

Main Interferometer 2

Presentation File

15:00-17:00

Input/Output Optics

Presentation File

3/2

10:00-12:00

Vibration Isolation 1

Presentation File

13:30-15:00

Vibration Isolation 2

Presentation File

15:30-16:30

Cryogenics

Presentation File

16:30-17:00

Vacuum

Presentation File

17:00-17:30

Tunnel

Presentation File

17:30-18:00

Geophysics Interferometer

Presentation File

3/3

10:00-12:00

Laser

Presentation File

13:30-15:30

Mirror

Presentation File

16:00-17:00

Facility

Presentation File

3/4

10:00-11:00

Analog Electronics

Presentation File

11:00-12:00

Digital System

Presentation File

13:30-15:30

Discussion among reviewers


C Reviews (in English)



LCGT wiki top

LCGT/Meeting/Reviews (last edited 2012-06-06 12:35:10 by OsamuMiyakawa)