Subsystem Reviews
Guideline of the review process is here.
Review A (Internal Review, mainly in Japanese)
2010.11.8 Digital System Review (by O.Miyakawa)
2010.11.22 Mirror (by N.Mio)
2010.11.29 Seismic attenuation (by R.Takahashi)
presentation (Takahashi)
presentation (DeSalvo)
2010.12.7 Interferometer (by Somiya, Aso)
Optical Configuration presentation (Somiya)
Interferometer Sensing and Control presentation (Aso)
2010.12.20 Seismic attenuation 2 (by R.Takahashi)
presentation (Takahashi)
presentation (Uchiyama)
2010.12.20 Input-Output Optics (by Telada)
presentation (Ohmae)
presentation (Telada)
2011.1.25 Interferometer 2 (by K.Somiya)
presentation (Somiya)
2011.1.31 Seismic attenuation 3 (by R.Takahashi)
presentation (Takahashi)
presentation (Arai)
2011.1.31 Cryogenics 2 (by T.Suzuki)
2011.2.7 Analog Electronics (by S.Moriwaki)
2011.2.7 Mirror (by N.Mio)
2011.2.7 Laser (by N.Mio)
Review A' (in Japanese)
2010.11.29 Cryogenics (by T.Suzuki)
B Reviews (in English)
Review documents
Subgroup name |
Document number |
Analog Electronics |
|
Cryogenics |
|
Data Analysis |
|
Detector Configuration |
|
Digital system |
|
Input Output Optics |
|
Laser |
|
Main Interferometer |
|
Mirror |
|
Tunnel |
|
Vacuum |
|
Vibration Isolation |
Program
2/28 |
||
9:50-10:00 |
Opening |
|
10:00-12:00 |
Detector Configuration & Roadmap 1 |
Presentation File |
13:30-15:30 |
Detector Configuration & Roadmap 1 |
Presentation File |
16:00-18:00 |
Data Analysis |
Presentation File |
3/1 |
||
10:00-12:00 |
Main Interferometer 1 |
Presentation File |
13:30-14:30 |
Main Interferometer 2 |
Presentation File |
15:00-17:00 |
Input/Output Optics |
Presentation File |
3/2 |
||
10:00-12:00 |
Vibration Isolation 1 |
Presentation File |
13:30-15:00 |
Vibration Isolation 2 |
Presentation File |
15:30-16:30 |
Cryogenics |
Presentation File |
16:30-17:00 |
Vacuum |
Presentation File |
17:00-17:30 |
Tunnel |
Presentation File |
17:30-18:00 |
Geophysics Interferometer |
Presentation File |
3/3 |
||
10:00-12:00 |
Laser |
Presentation File |
13:30-15:30 |
Mirror |
Presentation File |
16:00-17:00 |
Facility |
Presentation File |
3/4 |
||
10:00-11:00 |
Analog Electronics |
Presentation File |
11:00-12:00 |
Digital System |
Presentation File |
13:30-15:30 |
Discussion among reviewers |
C Reviews (in English)