3969
Comment:
|
3687
|
Deletions are marked like this. | Additions are marked like this. |
Line 13: | Line 13: |
- Greeting message (2min) | * Greeting message (2min) |
Line 15: | Line 15: |
- KAGRA overview (15min+3min) - SEO report (20min+5min) - Introduction of new collaborators & guest (5min) - Summary of the external review and PAB (20+5min) - What we have learned from the iKAGRA run (20+10min) - Summary of the iKAGRA run (summary from the extended chief meeting.) |
* KAGRA overview (15min+3min) * SEO report (20min+5min) * Introduction of new collaborators & guest (5min) * Summary of the external review and PAB (20+5min) * What we have learned from the iKAGRA run (20+10min) * Summary of the iKAGRA run (summary from the extended chief meeting.) |
Line 33: | Line 33: |
- bKAGRA phase I roadmap (M. Ando, 25min + 10min) - Review on science of bKAGRA era (25min+10min) |
* bKAGRA phase I roadmap (M. Ando, 25min + 10min) * Review on science of bKAGRA era (25min+10min) |
Line 41: | Line 41: |
- bKAGRA phase II planning (60min) - Installation - Commissioning - Observation policy - Discussion |
* bKAGRA phase II planning (60min) * Installation * Commissioning * Observation policy * Discussion |
Line 53: | Line 57: |
- Status report from subgroups I (45min) - AOS 15min x 2 - MIF 15min x 3 - MIF status overview (Michimura, 15 min) - bKAGRA Phase 1 ASC (Enomoto, 15 min) - OFI/OMC (Somiya, 15 min) |
* Status report from subgroups I (45min) * AOS 15min x 2 * MIF 15min x 3 * MIF status overview (Michimura, 15 min) * bKAGRA Phase 1 ASC (Enomoto, 15 min) * OFI/OMC (Somiya, 15 min) |
Line 63: | Line 69: |
- CAL 15min x 1 | * CAL 15min x 1 |
Line 69: | Line 75: |
- New people presentation (40min) - Vote for new people (10min) |
* New people presentation (40min) * Vote for new people (10min) |
Line 82: | Line 88: |
- Status report from subgroups II - FCL 15min x 1 - IOO 15min x 2 |
* Status report from subgroups II * FCL 15min x 1 * IOO 15min x 2 |
Line 92: | Line 99: |
- 4 Talks from collaboration members - TBD (15min x 4) |
* 4 Talks from collaboration members * TBD (15min x 4) |
Line 102: | Line 109: |
- Status report from subgroups III - VIS 15min x 4 - CRY 15min x 4 |
* Status report from subgroups III * VIS 15min x 4 * CRY 15min x 4 |
Line 114: | Line 121: |
- Invited talk from the Virgo collaboration (F. Ricci, 40min+10min) | * Invited talk from the Virgo collaboration (F. Ricci, 40min+10min) |
Line 120: | Line 127: |
- Status report from subgroups IV (90min) - GIF 15min x 1 - DetChar 15min x 3 - DET status (Hayama, 15min) - Measurement of Schumann Resonance(Atsuta, Kataoka,15min) - Water study (Measurement: Shikano, Theory: Somiya,15min) '''15:50-16:05'''Break |
* Status report from subgroups IV (90min) * GIF 15min x 1 * DetChar 15min x 3 *DET status (Hayama, 15min) *Measurement of Schumann Resonance(Atsuta, Kataoka,15min) *Water study (Measurement: Shikano, Theory: Somiya,15min) '''(15:50-16:05)'''Break |
Line 138: | Line 145: |
- Status report from subgroups V (75min) - VAC 15min x 1 (N. Ohishi) - MIR 15min x 1 ? (no reply) - LAS 15min x 1 ? (no reply) - AEL 15min x 1 - DGS 15min x 4 - TBD (TBA, 15min) - TBD (TBA, 15min) - TBD (TBA, 15min) - Hardware Injection (T. Yokozawa, 15min) |
* Status report from subgroups V (75min) * VAC 15min x 1 (N. Ohishi) * MIR 15min x 1 ? (no reply) * LAS 15min x 1 ? (no reply) * AEL 15min x 1 * DGS 15min x 4 * TBD (TBA, 15min) * TBD (TBA, 15min) * TBD (TBA, 15min) * Hardware Injection (T. Yokozawa, 15min) |
Line 166: | Line 173: |
- KSC items (for KSC members, 40min, Prof. Hyung-Mok Lee leads) | * KSC items (for KSC members, 40min, Prof. Hyung-Mok Lee leads) |
Line 174: | Line 181: |
- Status report from subgroups VI - DMG 15min x 3 - Main data storage & DMG roadmap (Kanda,15min) - Data transfer system (Sakai,15min) - TBD (Oohara,15min) |
* Status report from subgroups VI * DMG 15min x 3 * Main data storage & DMG roadmap (Kanda,15min) * Data transfer system (Sakai,15min) * TBD (Oohara,15min) |
Line 184: | Line 191: |
- DAS 15min x 5 - Status (H. Tagoshi, 15min) - TBD (T. Yuzirihara, 15min) - TBD (Joengcho Kim, 15min) - Continuous wave search using the iKAGRA data (Eda, 15min) - TBD (T. Yamamoto, 15min) |
* DAS 15min x 5 * Status (H. Tagoshi, 15min) * TBD (T. Yuzirihara, 15min) * TBD (Joengcho Kim, 15min) * Continuous wave search using the iKAGRA data (Eda, 15min) * TBD (T. Yamamoto, 15min) |
Line 203: | Line 210: |
- iKAGRA publication plan (20+20min) - Safety rules & lecture (20min) - Organization (10min each, 30min) - Document and drawings - CPC (R. Flaminio) - Authorship |
* iKAGRA publication plan (20+20min) * Safety rules & lecture (20min) * Organization (10min each, 30min) * Document and drawings * CPC (R. Flaminio) * Authorship |
Line 215: | Line 222: |
- Report from IBR members (15min+5min) - Summary (10min) |
* Report from IBR members (15min+5min) * Summary (10min) |
KAGRA Site Tour (subscribers only, August 24)
- from 13:00 at Hokubu-kaikan(data analysis building of KAGRA)
Program (August 25 - 27)
August 25th (Thu)
(10:30-11:00)REGISTRATION
AM
(11:00-12:45) Chair:
- Greeting message (2min)
- KAGRA overview (15min+3min)
- SEO report (20min+5min)
Introduction of new collaborators & guest (5min)
- Summary of the external review and PAB (20+5min)
- What we have learned from the iKAGRA run (20+10min)
- Summary of the iKAGRA run (summary from the extended chief meeting.)
(12:45-13:45)Lunch
PM1
(13:45-14:55) Chair
- bKAGRA phase I roadmap (M. Ando, 25min + 10min)
- Review on science of bKAGRA era (25min+10min)
PM2
(14:55-15:55) Chair
- bKAGRA phase II planning (60min)
- Installation
- Commissioning
- Observation policy
- Discussion
(15:55-16:10) Break
PM3
(16:10-17:40) Chair
- Status report from subgroups I (45min)
- AOS 15min x 2
- MIF 15min x 3
- MIF status overview (Michimura, 15 min)
- bKAGRA Phase 1 ASC (Enomoto, 15 min)
- OFI/OMC (Somiya, 15 min)
- CAL 15min x 1
PM4
(17:40-18:30) Chair
- New people presentation (40min)
- Vote for new people (10min)
(18:30-) IBR meeting
August 26th (Fri)
AM1
(9:00-10:45) Chair
- Status report from subgroups II
- FCL 15min x 1
- IOO 15min x 2
AM2
(9:45-10:45) Chair:
- 4 Talks from collaboration members
- TBD (15min x 4)
(10:45-11:00) Break
AM3
(11:00-13:00) Chair:
- Status report from subgroups III
- VIS 15min x 4
- CRY 15min x 4
(13:00-14:00) Lunch
PM1
(14:00-14:50) Chair:
- Invited talk from the Virgo collaboration (F. Ricci, 40min+10min)
PM2
(14:50-15:50) Chair:
- Status report from subgroups IV (90min)
- GIF 15min x 1
DetChar 15min x 3
- DET status (Hayama, 15min)
- Measurement of Schumann Resonance(Atsuta, Kataoka,15min)
- Water study (Measurement: Shikano, Theory: Somiya,15min)
(15:50-16:05)Break
PM3
(16:05-18:05) Chair:
- Status report from subgroups V (75min)
- VAC 15min x 1 (N. Ohishi)
- MIR 15min x 1 ? (no reply)
- LAS 15min x 1 ? (no reply)
- AEL 15min x 1
- DGS 15min x 4
- TBD (TBA, 15min)
- TBD (TBA, 15min)
- TBD (TBA, 15min)
- Hardware Injection (T. Yokozawa, 15min)
Banquet
August 27th (Sat)
AM1
(9:00-9:40) Chair:
- KSC items (for KSC members, 40min, Prof. Hyung-Mok Lee leads)
(9:40-9:50) Break
AM2
(9:50-11:50) Chair:
- Status report from subgroups VI
- DMG 15min x 3
Main data storage & DMG roadmap (Kanda,15min)
- Data transfer system (Sakai,15min)
- TBD (Oohara,15min)
- DAS 15min x 5
- Status (H. Tagoshi, 15min)
- TBD (T. Yuzirihara, 15min)
- TBD (Joengcho Kim, 15min)
- Continuous wave search using the iKAGRA data (Eda, 15min)
- TBD (T. Yamamoto, 15min)
- DMG 15min x 3
(11:50-13:00) Lunch
PM
(13:00-15:00) Chair:
- iKAGRA publication plan (20+20min)
Safety rules & lecture (20min)
- Organization (10min each, 30min)
- Document and drawings
- CPC (R. Flaminio)
- Authorship
- Report from IBR members (15min+5min)
- Summary (10min)