Differences between revisions 137 and 183 (spanning 46 versions)
Revision 137 as of 2016-08-25 13:34:05
Size: 10730
Comment:
Revision 183 as of 2016-08-27 03:23:18
Size: 12843
Comment:
Deletions are marked like this. Additions are marked like this.
Line 20: Line 20:
|| ||KAGRA overview (15min+3min)||T. Kajita ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5548|O]]||
|| ||SEO report I : Budget (10min)|| K. Somiya and M. Ohashi ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5547|O]]||
|| ||SEO report II : Schedule tracking (10min)|| Y. Aso ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5542|O]]||
|| ||KAGRA overview (15min+3min)||T. Kajita ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5548|]]||
|| ||SEO report I : Budget (10min)|| K. Somiya and M. Ohashi ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5547|]]||
|| ||SEO report II : Schedule tracking (10min)|| Y. Aso ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5542|○]]||
Line 24: Line 24:
|| ||Summary of the Program Advisory Board (20+5min)|| M. Ohashi ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5551|O]]||
|| ||Summary of the iKAGRA run (20+10min)|| Y. Michimura ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5545|O]]||
|| ||Summary of the Program Advisory Board (20+5min)|| M. Ohashi ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5551|]]||
|| ||Summary of the iKAGRA run (20+10min)|| Y. Michimura ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5545|]]||
Line 31: Line 31:
|| ||bKAGRA phase I&II commissioning (20min+10min)|| S. Kawamura ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5550|O]]|| || ||bKAGRA phase I&II commissioning (20min+10min)|| S. Kawamura ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5550|]]||
Line 37: Line 37:
|| ||Review on science of bKAGRA era II (25min) || H. Tagoshi||[[http://|×]]|| || ||Review on science of bKAGRA era II (25min) || H. Tagoshi||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5557|]]||
Line 45: Line 45:
|| ||AOS Overall (15min)||T. Akutsu||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5536|O]]||
|| ||AOS/VIS Wide Angle Baffles and Length-Sensing OpLevs for KAGRA (15min)||S. Zeidler||[[http://]]||
|| ||VIS Overall (15min)||R. Takahashi||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5553|O]]||
|| ||VIS Type-A (15min)||K. Okutomi||[[http://]]||
|| ||VIS Type-B (15min)||M. Barton||[[http://|×]]||
|| ||AOS Overall (15min)||T. Akutsu||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5536|]]||
|| ||AOS/VIS Wide Angle Baffles and Length-Sensing Op''''''Levs for KAGRA (15min)||S. Zeidler||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5559|○]]||
|| ||VIS Overall (15min)||R. Takahashi||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5553|]]||
|| ||VIS Type-A (15min)||K. Okutomi||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5560|○]]||
|| ||VIS Type-B (15min)||M. Barton||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5546|○]]||
Line 59: Line 59:
|| ||VAC (15min)|| N. Ohishi ||[[http://]]||
|| ||CRY 1 (5min)||Takayuki Tomaru||[[http://|×]]||
|| ||VAC (15min)|| N. Ohishi ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5570|○]]||
|| ||CRY 1 (5min)||Takayuki Tomaru/Tosikazu Suzuki||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5569|○]]||
Line 63: Line 63:
|| ||CRY 4 (15min)||Nobuhiro Kimura||[[http://|×]]|| || ||CRY 4 (15min)||Tosikazu Suzuki||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5571|]]||
Line 67: Line 67:
||<rowstyle="background-color: #FFFFE0;">10:40-12:10||||<style="text-align: left;">AM 2: Subsystem III (Chair: )|| ||
|| ||MIR (15min)||TBA||[[http://|×]]||
|| ||MIF 1 : MIF status overview (15min)||Y. Michimura ||[[http://]]||
|| ||MIF 2 : bKAGRA phase 1 ASC (15min)||Y. Enomoto ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5541|O]]||
|| ||MIF 3 : OFI/OMC (15min)||K. Somiya ||[[http://]]||
|| ||IOO 1 : IOO overview (15min)||S. Kawamura||[[http://]]||
|| ||IOO 2 : Intensity stabilization and green lock (15min)||Y. Sugimoto, S. Kambara||[[http://|×]]||
||<rowstyle="background-color: #FFFFE0;">10:40-12:10||||<style="text-align: left;">AM 2: Subsystem III (Chair: K. Hayama)|| ||
|| ||MIR (15min)||E.Hirose||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5567|○]]||
|| ||MIF 1 : MIF status overview (15min)||Y. Michimura ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5563|○]]||
|| ||MIF 2 : bKAGRA phase 1 ASC (15min)||Y. Enomoto ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5541|]]||
|| ||MIF 3 : OFI/OMC (15min)||K. Somiya ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5564|○]]||
|| ||IOO 1 : IOO overview (15min)||S. Kawamura||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5573|○]]||
|| ||IOO 2 : Intensity stabilization and green lock (15min)||Y. Sugimoto, S. Kambara||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5575|○]][[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5572|○]]||
Line 80: Line 80:
|| ||Safety rules & lecture (20min)|| ||[[http://|×]]|| || ||Safety rules & lecture (20min)|| ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5574|]]||
Line 90: Line 90:
|| ||GIF 1 : Status of GIF and Environmental Monitor (15min)||A. Araya||[[http://]]||
|| ||GIF 2 : First Operation of GIF (15min)||K. Miyo||[[http://]]||
|| ||DET 1 : Status (15min)||K. Hayama ||[[http://]]||
|| ||DET 2 : Measurement of Schumann Resonance (20min)||S.Atsuta, Y.Kataoka||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5544|o]]||
|| ||DET 3 : Water study Measurement/Theory (20min) || Y. Shikano, K. Somiya||[[http://|×]]||
|| ||GIF 1 : Status of GIF and Environmental Monitor (15min)||A. Araya||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5568|○]]||
|| ||GIF 2 : First Operation of GIF (15min)||K. Miyo||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5581|○]]||
|| ||DET 1 : Status (15min)||K. Hayama ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5580|○]]||
|| ||DET 2 : Measurement of Schumann Resonance (20min)||S.Atsuta, Y.Kataoka||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5544|]]||
|| ||DET 3 : Water study Measurement/Theory (20min) || Y. Shikano, K. Somiya||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5565|○]][[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5576|○]]||
Line 98: Line 98:
||<rowstyle="background-color: #FFFFE0;">16:35-17:50||||<style="text-align: left;">PM 3: Subsystem V (Chair: ) || ||
|| ||AEL : Manufacturing electric circuits for KAGRA (15min) ||O.Miyakawa||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5556|O]]||
|| ||DGS 1 : DGS schedule for bKAGRA (15min) ||O.Miyakawa||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5554|O]]||
|| ||DGS 2 : Setting up a test bench system (15min) ||Y.Sasaki||[[http://]]||
|| ||DGS 3 : Update and maintenance for controls system (15min) ||T.Yamamoto||[[http://]]||
|| ||DGS 4 : Hardware Injection (15min)||T. Yokozawa||[[http://]]||
||<rowstyle="background-color: #FFFFE0;">16:35-17:50||||<style="text-align: left;">PM 3: Subsystem V (Chair: T. Akutsu) || ||
|| ||AEL : Manufacturing electric circuits for KAGRA (15min) ||O.Miyakawa||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5556|]]||
|| ||DGS 1 : DGS schedule for bKAGRA (15min) ||O.Miyakawa||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5554|]]||
|| ||DGS 2 : Setting up a test bench system (15min) ||Y.Sasaki||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5558|○]]||
|| ||DGS 3 : Update and maintenance for control system (15min) ||T.Yamamoto||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5578|○]]||
|| ||DGS 4 : Status of iKAGRA hardware injection (15min)||T. Yokozawa||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5533|○]]||
Line 105: Line 105:
||<rowstyle="background-color: #FFFFE0;">17:50-18:20||||<style="text-align: left;">PM 4: GW science (Chair: ) || || ||<rowstyle="background-color: #FFFFE0;">17:50-18:20||||<style="text-align: left;">PM 4: GW science (Chair: H. Shinkai) || ||
Line 117: Line 117:
||<rowstyle="background-color: #FFFFE0;">9:50-11:50||||<style="text-align: left;">AM 2: Subsystem VI (Chair: ) || || ||<rowstyle="background-color: #FFFFE0;">9:50-11:50||||<style="text-align: left;">AM 2: Subsystem VI (Chair: K. Kokeyama) || ||
Line 120: Line 120:
|| ||DMG 3 : TBA (15min)||K. Oohara||[[http://|×]]|| || ||DMG 3 : Technical Problems and Solutions (15min)||K. Oohara||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5583|]]||
Line 122: Line 122:
|| ||DAS 2 : TBA (15min)||T. Yuzirihara||[[http://|×]]|| || ||DAS 2 : Progress of CBC search using iKAGRA data (15min)||H. Yuzurihara||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5566|]]||
Line 124: Line 124:
|| ||DAS 4 : Continuous wave search using the iKAGRA data(15min)||K. Eda||[[http://]]||
|| ||DAS 5 : TBA (15min)||T. Yamamoto||[[http://]]||
|| ||DAS 4 : Continuous wave search using the iKAGRA data(15min)||K. Eda||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5526|○]]||
|| ||DAS 5 : Noise characterization and GW search under non-Gaussian noise environment (15min)||T. Yamamoto||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5579|○]]||
Line 127: Line 127:
||<rowstyle="background-color: #FFFFE0;">11:50-12:05||||<style="text-align: left;">AM 3: TOPIC (Chair: ) || || ||<rowstyle="background-color: #FFFFE0;">11:50-12:05||||<style="text-align: left;">AM 3: TOPIC (Chair: K. Somiya) || ||
Line 134: Line 134:
|| ||CPC and rules to use KAGRA data in theses(20min)||R. Flaminio||[[http://|×]]||
|| ||iKAGRA publication plan (20+20min)||K. Somiya/N. Kanda ||[[http://|×]]||
|| ||CPC and rules to use KAGRA data in theses(20min)||N. Kanda||[[http://|×]]||
|| ||iKAGRA publication plan (20+20min)||K. Somiya ||[[http://|×]]||

KAGRA Site Tour (subscribers only, August 24)

Meet at 13:00 at the Hokubu-kaikan (the data analysis building of KAGRA).

See KAGRA_site_tour_v2.pdf for details.

IBR meeting (August 25)

Room B203 (on the same floor and in the same building as the f2f meeting room)

Program (August 25 - 27)

▄▄▄▄▄▄▄▄▄▄▄▄▄ August 25th (Thu) ▄▄▄▄▄▄▄▄▄▄▄▄▄

Time

Subject and Title

Speaker

File

10:30-11:00

Registration

11:00-12:40

AM: Status (Chair: F. Matsushima )

Greeting message (2min)

F. Matsushima

×

KAGRA overview (15min+3min)

T. Kajita

SEO report I : Budget (10min)

K. Somiya and M. Ohashi

SEO report II : Schedule tracking (10min)

Y. Aso

Introduction of new collaborators & guest (5min)

×

Summary of the Program Advisory Board (20+5min)

M. Ohashi

Summary of the iKAGRA run (20+10min)

Y. Michimura

12:40-13:40

Lunch

13:40-14:45

PM 1: bKAGRA I/II (Chair: Y. Aso)

 

bKAGRA phase I roadmap(25min + 10min)

M. Ando

bKAGRA phase I&II commissioning (20min+10min)

S. Kawamura

14:45-14:55

Break

14:55-16:25

PM 2: bKAGRA prospects (Chair: Y. Itoh)

 

Review on science of bKAGRA (Experimental Aspect Discussed in Dawn Meeting II)(25min)

S. Miyoki

Review on science of bKAGRA era II (25min)

H. Tagoshi

Review on science of bKAGRA: Discussion (10min)

Discussion leaders: S. Miyoki/H. Tagoshi

×

Observation plan (30min)

Discussion leaders: M. Ando/N.Kanda

16:25-16:35

Break

16:35-18:35

PM 3: Subsystem I (Chair: O. Miyakawa )

 

LAS (15min)

N. Mio

×

AOS Overall (15min)

T. Akutsu

AOS/VIS Wide Angle Baffles and Length-Sensing OpLevs for KAGRA (15min)

S. Zeidler

VIS Overall (15min)

R. Takahashi

VIS Type-A (15min)

K. Okutomi

VIS Type-B (15min)

M. Barton

VIS Type-Bp (15min)

A. Shoda

CAL (15min)

S. Haino

18:40-

IBR meeting at the room B203

▄▄▄▄▄▄▄▄▄▄▄▄▄ August 26th (Fri) ▄▄▄▄▄▄▄▄▄▄▄▄▄

9:00-10:30

AM 1: Subsystem II (Chair: R. Takahashi)

 

FCL (15min)

S. Miyoki

VAC (15min)

N. Ohishi

CRY 1 (5min)

Takayuki Tomaru/Tosikazu Suzuki

CRY 2 (20min)

Rahul Kumar

×

CRY 3 (20min)

Kieran Craig

×

CRY 4 (15min)

Tosikazu Suzuki

10:30-10:40

Break

10:40-12:10

AM 2: Subsystem III (Chair: K. Hayama)

 

MIR (15min)

E.Hirose

MIF 1 : MIF status overview (15min)

Y. Michimura

MIF 2 : bKAGRA phase 1 ASC (15min)

Y. Enomoto

MIF 3 : OFI/OMC (15min)

K. Somiya

IOO 1 : IOO overview (15min)

S. Kawamura

IOO 2 : Intensity stabilization and green lock (15min)

Y. Sugimoto, S. Kambara

12:10-12:15

Break

12:15-13:00

AM 3: Collaboration I (Chair: H. Tagoshi )

 

New people presentation (20min)

Tjonnie Li (The Chinese University of Hong Kong)

×

Vote for new people (5min)

×

Safety rules & lecture (20min)

13:00-14:00

Lunch

14:00-14:50

PM 1: Invited talk (Chair: N. Kanda)

 

TBA (40min+10min)

F. Ricci

×

14:50-15:00

Break

15:00-16:25

PM 2: Subsystem IV (Chair: A. Shoda)

 

GIF 1 : Status of GIF and Environmental Monitor (15min)

A. Araya

GIF 2 : First Operation of GIF (15min)

K. Miyo

DET 1 : Status (15min)

K. Hayama

DET 2 : Measurement of Schumann Resonance (20min)

S.Atsuta, Y.Kataoka

DET 3 : Water study Measurement/Theory (20min)

Y. Shikano, K. Somiya

16:25-16:35

Break

16:35-17:50

PM 3: Subsystem V (Chair: T. Akutsu)

 

AEL : Manufacturing electric circuits for KAGRA (15min)

O.Miyakawa

DGS 1 : DGS schedule for bKAGRA (15min)

O.Miyakawa

DGS 2 : Setting up a test bench system (15min)

Y.Sasaki

DGS 3 : Update and maintenance for control system (15min)

T.Yamamoto

DGS 4 : Status of iKAGRA hardware injection (15min)

T. Yokozawa

17:50-18:20

PM 4: GW science (Chair: H. Shinkai)

 

What will we observe in O2 and Future GW detectors ? (tentative title, 30min)

T. Nakamura

×

Banquet

▄▄▄▄▄▄▄▄▄▄▄▄▄ August 27th (Sat) ▄▄▄▄▄▄▄▄▄▄▄▄▄

9:00-9:40

AM 1: KSC (Chair: Y. Michimura)

 

KSC items/authorship policy (40min)

KSC members

×

9:40-9:50

Break

9:50-11:50

AM 2: Subsystem VI (Chair: K. Kokeyama)

 

DMG 1 : Main data storage & DMG roadmap(15min)

N. Kanda

×

DMG 2 : Data transfer system(15min)

K. Sakai

×

DMG 3 : Technical Problems and Solutions (15min)

K. Oohara

DAS 1 : Status (15min)

H. Tagoshi

×

DAS 2 : Progress of CBC search using iKAGRA data (15min)

H. Yuzurihara

DAS 3 : TBA (15min)

J. Kim

×

DAS 4 : Continuous wave search using the iKAGRA data(15min)

K. Eda

DAS 5 : Noise characterization and GW search under non-Gaussian noise environment (15min)

T. Yamamoto

11:50-12:05

AM 3: TOPIC (Chair: K. Somiya)

 

TOPIC : Deep searches for long duration transient sources (15min)

M. H. P. Van Putten

×

12:05-13:05

Lunch

13:05-14:55

PM: Collaboration II (Chair: )

 

Report from KSC including authorship policy (10min)

N. Kanda

×

CPC and rules to use KAGRA data in theses(20min)

N. Kanda

×

iKAGRA publication plan (20+20min)

K. Somiya

×

Document and drawings (10min)

N. Kanda

×

Report from IBR members (15min+5min)

T. Kajita

×

Summary (10min)

T. Kajita

×

LCGT/Meeting/f2f/2016Aug (last edited 2017-02-09 12:21:10 by YousukeIto)