Differences between revisions 17 and 90 (spanning 73 versions)
Revision 17 as of 2016-07-28 15:46:52
Size: 6035
Editor: EriSakamoto
Comment:
Revision 90 as of 2016-08-19 15:03:50
Size: 9001
Editor: YousukeIto
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 . from 13:00 at Hokubu-kaikan(data analysis building of KAGRA) Meet at 13:00 at the Hokubu-kaikan (the data analysis building of KAGRA)

== IBR meeting (August 25) ==
Room B203 (at the same floor and in the same building as the f2f meeting room)

Line 5: Line 10:
||||||||▄▄▄▄▄▄▄▄▄▄▄▄▄ August 25th (Thu) ▄▄▄▄▄▄▄▄▄▄▄▄▄ || ||<rowstyle="background-color: #E0FFFF;">||||||▄▄▄▄▄▄▄▄▄▄▄▄▄ August 25th (Thu) ▄▄▄▄▄▄▄▄▄▄▄▄▄ ||
Line 7: Line 12:
||Time||Subject and Title||Speaker||File|| ||<rowstyle="background-color: #E0FFFF;"> Time||Subject and Title||Speaker||File||
Line 9: Line 14:
||10:30-11:00||||registration|| || ||<rowstyle="background-color: #F0FFF0;">10:30-11:00||||Registration|| ||
Line 11: Line 16:
||11:00-12:45||Greeting message (2min)|| ||[[http://bbbbbbbb|o]]||
|| ||KAGRA overview (15min+3min)|| ||[[http://bbbbbbbb|o]]||
|| ||SEO report (20min+5min)|| ||[[http://bbbbbbbb|o]]||
|| ||Introduction of new collaborators & guest (5min)|| ||[[http://bbbbbbbb|o]]||
|| ||Summary of the external review and PAB (20+5min)|| ||[[http://bbbbbbbb|o]]||
|| ||What we have learned from the iKAGRA run (20+10min)|| ||[[http://bbbbbbbb|o]]||
|| ||Summary of the iKAGRA run (summary from the extended chief meeting.)|| ||
||<rowstyle="background-color: #FFFFE0;text-align: left;">11:00-12:40||||<style="text-align: left;">AM: Status (Chair: ) || ||
|| ||Greeting message (2min)|| ||[[http://|×]]||
|| ||KAGRA overview (15min+3min)|| ||[[http://|×]]||
|| ||SEO report I : Budget (10min)|| K. Somiya or M. Ohashi ||[[http://|×]]||
|| ||SEO report II : Schedule tracking (10min)|| Y. Aso ||[[http://|×]]||
|| ||Introduction of new collaborators & guest (5min)|| ||[[http://|×]]||
|| ||Summary of the Program Advisory Board (20+5min)|| M. Ohashi ||[[http://|×]]||
|| ||Summary of the iKAGRA run (20+10min)|| Y. Michimura ||[[http://|×]]||
Line 19: Line 25:
||12:45-13:45||||Lunch|| || ||<rowstyle="background-color: #F0FFF0;">12:40-13:40||||Lunch|| ||
Line 21: Line 27:
||13:45-14:55||bKAGRA phase I roadmap(25min + 10min)||M. Ando||[[http://bbbbbbbb|o]]||
|| ||Review on science of bKAGRA era(25min+10min)|| ||[[http://bbbbbbbb|o]]||
||<rowstyle="background-color: #FFFFE0;">13:40-14:45||||<style="text-align: left;">PM 1: bKAGRA I/II (Chair: ) || ||
|| ||bKAGRA phase I roadmap(25min + 10min)||M. Ando||[[http://|×]]||
|| ||bKAGRA phase I&II commissioning (20min+10min)|| S. Kawamura ||[[http://|×]]||
Line 24: Line 31:
||14:55-15:55||bKAGRA phase II planning(60min)|| ||[[http://bbbbbbbb|o]]||
|| ||Installation|| ||[[http://bbbbbbbb|o]]||
|| ||Commissioning|| ||[[http://bbbbbbbb|o]]||
|| ||Observation policy|| ||[[http://bbbbbbbb|o]]||
|| ||Discussion|| || ||
||<rowstyle="background-color: #F0FFF0;">14:45-14:55||||Break|| ||
Line 30: Line 33:
||15:55-16:10||||Break|| || ||<rowstyle="background-color: #FFFFE0;">14:55-16:25||||<style="text-align: left;">PM 2: bKAGRA prospects (Chair: ) || ||
|| ||Review on science of bKAGRA era I (25min) ||S. Miyoki ||[[http://|×]]||
|| ||Review on science of bKAGRA era II (25min) || H. Tagoshi||[[http://|×]]||
|| ||Review on science of bKAGRA: Discussion (10min)||Discussion leaders: S. Miyoki/H. Tagoshi ||[[http://|×]]||
|| ||Observation plan (30min) ||Discussion leaders: M. Ando/N.Kanda ||[[http://|×]]||
Line 32: Line 39:
||16:10-17:40||Status report from subgroups I (45min)|| ||[[http://bbbbbbbb|o]]||
|| ||AOS 15min x 2|| ||[[http://bbbbbbbb|o]]||
|| ||MIF 15min x 3|| ||[[http://bbbbbbbb|o]]||
|| ||-MIF status overview(15min)||Michimura||[[http://bbbbbbbb|o]]||
|| ||-bKAGRA Phase 1 ASC(15min)||Enomoto||[[http://bbbbbbbb|o]]||
|| ||-OFI/OMC(15min)||Somiya||[[http://bbbbbbbb|o]]||
|| ||CAL15min x 1|| ||[[http://bbbbbbbb|o]]||
||<rowstyle="background-color: #F0FFF0;">16:25-16:35||||Break|| ||
Line 40: Line 41:
||17:40-18:30||New people presentation(40min)|| ||[[http://bbbbbbbb|o]]||
|| ||Vote for new people (10min)|| || ||
||<rowstyle="background-color: #FFFFE0;">16:35-18:35||||<style="text-align: left;">PM 3: Subsystem I (Chair: ) || ||
|| ||LAS (15min)||N. Mio||[[http://|×]]||
|| ||AOS 1 (15min)||TBA||[[http://|×]]||
|| ||AOS 2 (15min)||TBA||[[http://|×]]||
|| ||VIS Overall (15min)||R. Takahashi||[[http://|×]]||
|| ||VIS Type-A (15min)||K. Okutomi||[[http://|×]]||
|| ||VIS Type-B (15min)||M. Barton||[[http://|×]]||
|| ||VIS Type-Bp (15min)||A. Shoda||[[http://|×]]||
|| ||CAL (15min)||S. Haino||[[http://|×]]||
Line 43: Line 51:
||18:30-||||IBR meeting|| || ||<rowstyle="background-color: #F0FFF0;">18:40-||||IBR meeting at the room B203|| ||
Line 45: Line 53:
||||||||▄▄▄▄▄▄▄▄▄▄▄▄▄ August 26th (Fri) ▄▄▄▄▄▄▄▄▄▄▄▄▄ || ||<rowstyle="background-color: #E0FFFF;">||||||▄▄▄▄▄▄▄▄▄▄▄▄▄ August 26th (Fri) ▄▄▄▄▄▄▄▄▄▄▄▄▄ ||
Line 47: Line 55:
||9:00-10:45||Status report from subgroups II|| ||[[http://bbbbbbbb|o]]||
|| ||-FCL 15min x 1|| ||[[http://bbbbbbbb|o]]||
|| ||-IOO 15min x 2|| ||[[http://bbbbbbbb|o]]||
||<rowstyle="background-color: #FFFFE0;">9:00-10:30||||<style="text-align: left;">AM 1: Subsystem II (Chair: ) || ||
|| ||FCL (15min)||Miyoki||[[http://|×]]||
|| ||VAC (15min)|| N. Ohishi ||[[http://|×]]||
|| ||CRY 1 (5min)||Takayuki Tomaru||[[http://|×]]||
|| ||CRY 2 (20min)||Rahul Kumar||[[http://|×]]||
|| ||CRY 3 (20min)||Kieran Craig||[[http://|×]]||
|| ||CRY 4 (15min)||Nobuhiro Kimura||[[http://|×]]||
Line 51: Line 63:
||9:45-10:45||4 Talks from collaboration members || ||[[http://bbbbbbbb|o]]||
|| ||-TBD (15min x 4)|| ||[[http://bbbbbbbb|o]]||
||<rowstyle="background-color: #F0FFF0;">10:30-10:40||||Break|| ||
Line 54: Line 65:
||10:45-11:00||||Break|| || ||<rowstyle="background-color: #FFFFE0;">10:40-12:10||||<style="text-align: left;">AM 2: Subsystem III (Chair: )|| ||
|| ||MIR (15min)||TBA||[[http://|×]]||
|| ||MIF 1 : MIF status overview (15min)||Y. Michimura ||[[http://|×]]||
|| ||MIF 2 : bKAGRA phase 1 ASC (15min)||Y. Enomoto ||[[http://|×]]||
|| ||MIF 3 : OFI/OMC (15min)||K. Somiya ||[[http://|×]]||
|| ||IOO 1 : IOO overview (15min)||S. Kawamura||[[http://|×]]||
|| ||IOO 2 : Intensity stabilization and green lock (15min)||Y. Sugimoto, S. Kambara||[[http://|×]]||
Line 56: Line 73:
||11:00-13:00||Status report from subgroups III|| ||[[http://bbbbbbbb|o]]||
|| ||VIS 15min x 4|| ||[[http://bbbbbbbb|o]]||
|| ||CRY 15min x 4|| ||[[http://bbbbbbbb|o]]||
||<rowstyle="background-color: #F0FFF0;">12:10-12:15||||Break|| ||
Line 60: Line 75:
||13:00-14:00||||Lunch|| || ||<rowstyle="background-color: #FFFFE0;">12:15-13:00||||<style="text-align: left;">AM 3: Collaboration I (Chair: ) || ||
|| ||New people presentation (20min)||Tjonnie Li (The Chinese University of Hong Kong)||[[http://|×]]||
|| ||Vote for new people (5min)|| ||[[http://|×]]||
|| ||Safety rules & lecture (20min)|| ||[[http://|×]]||
Line 62: Line 80:
||14:00-14:50||Invited talk from the Virgo collaboration(40min+10min)||F. Ricci||[[http://bbbbbbbb|o]]|| ||<rowstyle="background-color: #F0FFF0;">13:00-14:00||||Lunch|| ||
Line 64: Line 82:
||14:50-15:50||Status report from subgroups IV (90min)|| ||[[http://bbbbbbbb|o]]||
|| ||GIF 15min x 1|| ||[[http://bbbbbbbb|o]]||
|| ||DetChar 15min x 3|| ||[[http://bbbbbbbb|o]]||
|| ||DET status(15min)||Hayama||[[http://bbbbbbbb|o]]||
|| ||Measurement of Schumann Resonance(15min)||Atsuta, Kataoka||[[http://bbbbbbbb|o]]||
|| ||Water study(15min)||Measurement: Shikano, Theory: Somiya||[[http://bbbbbbbb|o]]||
||<rowstyle="background-color: #FFFFE0;">14:00-14:50||||<style="text-align: left;">PM 1: Invited talk (Chair: ) || ||
|| ||TBA (40min+10min)||F. Ricci||[[http://|×]]||
Line 71: Line 85:
||15:50-16:05||||Break|| || ||<rowstyle="background-color: #F0FFF0;">14:50-15:00||||Break|| ||
Line 73: Line 87:
||16:05-18:05||Status report from subgroups V (75min)|| ||[[http://bbbbbbbb|o]]||
|| ||VAC 15min x 1||N. Ohishi||[[http://bbbbbbbb|o]]||
|| ||MIR 15min x 1 ? (no reply)|| ||[[http://bbbbbbbb|o]]||
|| ||LAS 15min x 1 ? (no reply)|| ||[[http://bbbbbbbb|o]]||
|| ||AEL 15min x 1|| ||[[http://bbbbbbbb|o]]||
|| ||DGS 15min x 4|| ||[[http://bbbbbbbb|o]]||
|| ||-TBD (TBA, 15min)|| ||[[http://bbbbbbbb|o]]||
|| ||-TBD (TBA, 15min)|| ||[[http://bbbbbbbb|o]]||
|| ||-TBD (TBA, 15min)|| ||[[http://bbbbbbbb|o]]||
|| ||-Hardware Injection(15min)||T. Yokozawa||[[http://bbbbbbbb|o]]||
||<rowstyle="background-color: #FFFFE0;">15:00-16:25||||<style="text-align: left;">PM 2: Subsystem IV (Chair: ) || ||
|| ||GIF 1 (15min)||TBA||[[http://|×]]||
|| ||GIF 2 (15min)||TBA||[[http://|×]]||
|| ||DET 1 : Status (15min)||K. Hayama ||[[http://|×]]||
|| ||DET 2 : Measurement of Schumann Resonance (20min)||S.Atsuta, Y.Kataoka||[[http://|×]]||
|| ||DET 3 : Water study Measurement/Theory (20min) || Shikano, Somiya||[[http://|×]]||
Line 84: Line 94:
|| ||||Banquet|| || ||<rowstyle="background-color: #F0FFF0;">16:25-16:35||||Break|| ||
Line 86: Line 96:
||||||||▄▄▄▄▄▄▄▄▄▄▄▄▄ August 27th (Sat) ▄▄▄▄▄▄▄▄▄▄▄▄▄ || ||<rowstyle="background-color: #FFFFE0;">16:35-17:50||||<style="text-align: left;">PM 3: Subsystem V (Chair: ) || ||
|| ||AEL : Manufacturing electric circuits for KAGRA (15min) ||O.Miyakawa||[[http://|×]]||
|| ||DGS 1 : DGS schedule for bKAGRA (15min) ||K.Kokeyama||[[http://|×]]||
|| ||DGS 2 : Setting up a test bench system (15min) ||Y.Sasaki||[[http://|×]]||
|| ||DGS 3 : Update and maintenance for controls system (15min) ||T.Yamamoto||[[http://|×]]||
|| ||DGS 4 : Hardware Injection (15min)||T. Yokozawa||[[http://|×]]||
Line 88: Line 103:
||9:00-9:40||KSC items (for KSC members, 40min, Prof. Hyung-Mok Lee leads)|| ||[[http://bbbbbbbb|o]]|| ||<rowstyle="background-color: #FFFFE0;">17:50-18:20||||<style="text-align: left;">PM 4: GW science (Chair: ) || ||
|| ||What will we observe in O2 and Future GW detectors ? (tentative title, 30min)||T. Nakamura ||[[http://|×]]||
Line 90: Line 106:
||9:40-9:50||||Break|| || ||<rowstyle="background-color: #F0FFF0;"> ||||Banquet|| ||
Line 92: Line 108:
||9:50-11:50||Status report from subgroups VI|| ||[[http://bbbbbbbb|o]]||
|| ||DMG 15min x 3|| ||[[http://bbbbbbbb|o]]||
|| ||-Main data storage & DMG roadmap(15min)||Kanda||[[http://bbbbbbbb|o]]||
|| ||-Data transfer system(15min)||Sakai||[[http://bbbbbbbb|o]]||
|| ||-TBD(15min)||Oohara||[[http://bbbbbbbb|o]]||
|| ||DAS 15min x 5|| ||[[http://bbbbbbbb|o]]||
|| ||-Status(15min)||H. Tagoshi||[[http://bbbbbbbb|o]]||
|| ||-TBD(15min)||T. Yuzirihara||[[http://bbbbbbbb|o]]||
|| ||-TBD(15min)||Joengcho Kim||[[http://bbbbbbbb|o]]||
|| ||-Continuous wave search using the iKAGRA data(15min)||Eda||[[http://bbbbbbbb|o]]||
|| ||-TBD(15min)||T. Yamamoto||[[http://bbbbbbbb|o]]||
||<rowstyle="background-color: #E0FFFF;">||||||▄▄▄▄▄▄▄▄▄▄▄▄▄ August 27th (Sat) ▄▄▄▄▄▄▄▄▄▄▄▄▄ ||
Line 104: Line 110:
||11:50-13:00|||| Lunch || || ||<rowstyle="background-color: #FFFFE0;">9:00-9:40||||<style="text-align: left;">AM 1: KSC (Chair: ) || ||
|| ||KSC items/authorship policy (40min)||KSC members||[[http://|×]]||
Line 106: Line 113:
||13:00-15:00||iKAGRA publication plan (20+20min)|| ||[[http://bbbbbbbb|o]]||
|| ||Safety rules & lecture (20min)|| ||[[http://bbbbbbbb|o]]||
|| ||Organization (10min each, 30min)|| ||[[http://bbbbbbbb|o]]||
|| ||-Document and drawings|| ||[[http://bbbbbbbb|o]]||
|| ||-CPC||R. Flaminio||[[http://bbbbbbbb|o]]||
|| ||-Authorship|| ||[[http://bbbbbbbb|o]]||
|| ||Report from IBR members (15min+5min)|| ||[[http://bbbbbbbb|o]]||
|| ||Summary (10min)|| || ||
||<rowstyle="background-color: #F0FFF0;">9:40-9:50||||Break|| ||
|||||||| ||
||<rowstyle="background-color: #FFFFE0;">9:50-11:50||||<style="text-align: left;">AM 2: Subsystem VI (Chair: ) || ||
|| ||DMG 1 : Main data storage & DMG roadmap(15min)||N. Kanda||[[http://|×]]||
|| ||DMG 2 : Data transfer system(15min)||K. Sakai||[[http://|×]]||
|| ||DMG 3 : TBA (15min)||K. Oohara||[[http://|×]]||
|| ||DAS 1 : Status (15min)||H. Tagoshi ||[[http://|×]]||
|| ||DAS 2 : TBA (15min)||T. Yuzirihara||[[http://|×]]||
|| ||DAS 3 : TBA (15min)||J. Kim||[[http://|×]]||
|| ||DAS 4 : Continuous wave search using the iKAGRA data(15min)||K. Eda||[[http://|×]]||
|| ||DAS 5 : TBA (15min)||T. Yamamoto||[[http://|×]]||
|||||||| ||
||<rowstyle="background-color: #FFFFE0;">11:50-12:05||||<style="text-align: left;">AM 3: TOPIC (Chair: ) || ||
|| ||TOPIC : Deep searches for long duration transient sources (15min)||M. H. P. Van Putten||[[http://|×]]||
|||||||| ||
||<rowstyle="background-color: #F0FFF0;">12:05-13:05|||| Lunch || ||
|||||||| ||
||<rowstyle="background-color: #FFFFE0;">13:05-14:55||||<style="text-align: left;">PM: Collaboration II (Chair: ) || ||
|| ||Report from KSC including authorship policy (10min)||N. Kanda ||[[http://|×]]||
|| ||CPC and rules to use KAGRA data in theses(20min)||R. Flaminio||[[http://|×]]||
|| ||iKAGRA publication plan (20+20min)||K. Somiya/N. Kanda ||[[http://|×]]||
|| ||Document and drawings (10min)||N. Kanda ||[[http://|×]]||
|| ||Report from IBR members (15min+5min)||TBA||[[http://|×]]||
|| ||Summary (10min)||TBA||[[http://|×]]||

KAGRA Site Tour (subscribers only, August 24)

Meet at 13:00 at the Hokubu-kaikan (the data analysis building of KAGRA)

IBR meeting (August 25)

Room B203 (at the same floor and in the same building as the f2f meeting room)

Program (August 25 - 27)

▄▄▄▄▄▄▄▄▄▄▄▄▄ August 25th (Thu) ▄▄▄▄▄▄▄▄▄▄▄▄▄

Time

Subject and Title

Speaker

File

10:30-11:00

Registration

11:00-12:40

AM: Status (Chair: )

Greeting message (2min)

×

KAGRA overview (15min+3min)

×

SEO report I : Budget (10min)

K. Somiya or M. Ohashi

×

SEO report II : Schedule tracking (10min)

Y. Aso

×

Introduction of new collaborators & guest (5min)

×

Summary of the Program Advisory Board (20+5min)

M. Ohashi

×

Summary of the iKAGRA run (20+10min)

Y. Michimura

×

12:40-13:40

Lunch

13:40-14:45

PM 1: bKAGRA I/II (Chair: )

 

bKAGRA phase I roadmap(25min + 10min)

M. Ando

×

bKAGRA phase I&II commissioning (20min+10min)

S. Kawamura

×

14:45-14:55

Break

14:55-16:25

PM 2: bKAGRA prospects (Chair: )

 

Review on science of bKAGRA era I (25min)

S. Miyoki

×

Review on science of bKAGRA era II (25min)

H. Tagoshi

×

Review on science of bKAGRA: Discussion (10min)

Discussion leaders: S. Miyoki/H. Tagoshi

×

Observation plan (30min)

Discussion leaders: M. Ando/N.Kanda

×

16:25-16:35

Break

16:35-18:35

PM 3: Subsystem I (Chair: )

 

LAS (15min)

N. Mio

×

AOS 1 (15min)

TBA

×

AOS 2 (15min)

TBA

×

VIS Overall (15min)

R. Takahashi

×

VIS Type-A (15min)

K. Okutomi

×

VIS Type-B (15min)

M. Barton

×

VIS Type-Bp (15min)

A. Shoda

×

CAL (15min)

S. Haino

×

18:40-

IBR meeting at the room B203

▄▄▄▄▄▄▄▄▄▄▄▄▄ August 26th (Fri) ▄▄▄▄▄▄▄▄▄▄▄▄▄

9:00-10:30

AM 1: Subsystem II (Chair: )

 

FCL (15min)

Miyoki

×

VAC (15min)

N. Ohishi

×

CRY 1 (5min)

Takayuki Tomaru

×

CRY 2 (20min)

Rahul Kumar

×

CRY 3 (20min)

Kieran Craig

×

CRY 4 (15min)

Nobuhiro Kimura

×

10:30-10:40

Break

10:40-12:10

AM 2: Subsystem III (Chair: )

 

MIR (15min)

TBA

×

MIF 1 : MIF status overview (15min)

Y. Michimura

×

MIF 2 : bKAGRA phase 1 ASC (15min)

Y. Enomoto

×

MIF 3 : OFI/OMC (15min)

K. Somiya

×

IOO 1 : IOO overview (15min)

S. Kawamura

×

IOO 2 : Intensity stabilization and green lock (15min)

Y. Sugimoto, S. Kambara

×

12:10-12:15

Break

12:15-13:00

AM 3: Collaboration I (Chair: )

 

New people presentation (20min)

Tjonnie Li (The Chinese University of Hong Kong)

×

Vote for new people (5min)

×

Safety rules & lecture (20min)

×

13:00-14:00

Lunch

14:00-14:50

PM 1: Invited talk (Chair: )

 

TBA (40min+10min)

F. Ricci

×

14:50-15:00

Break

15:00-16:25

PM 2: Subsystem IV (Chair: )

 

GIF 1 (15min)

TBA

×

GIF 2 (15min)

TBA

×

DET 1 : Status (15min)

K. Hayama

×

DET 2 : Measurement of Schumann Resonance (20min)

S.Atsuta, Y.Kataoka

×

DET 3 : Water study Measurement/Theory (20min)

Shikano, Somiya

×

16:25-16:35

Break

16:35-17:50

PM 3: Subsystem V (Chair: )

 

AEL : Manufacturing electric circuits for KAGRA (15min)

O.Miyakawa

×

DGS 1 : DGS schedule for bKAGRA (15min)

K.Kokeyama

×

DGS 2 : Setting up a test bench system (15min)

Y.Sasaki

×

DGS 3 : Update and maintenance for controls system (15min)

T.Yamamoto

×

DGS 4 : Hardware Injection (15min)

T. Yokozawa

×

17:50-18:20

PM 4: GW science (Chair: )

 

What will we observe in O2 and Future GW detectors ? (tentative title, 30min)

T. Nakamura

×

Banquet

▄▄▄▄▄▄▄▄▄▄▄▄▄ August 27th (Sat) ▄▄▄▄▄▄▄▄▄▄▄▄▄

9:00-9:40

AM 1: KSC (Chair: )

 

KSC items/authorship policy (40min)

KSC members

×

9:40-9:50

Break

9:50-11:50

AM 2: Subsystem VI (Chair: )

 

DMG 1 : Main data storage & DMG roadmap(15min)

N. Kanda

×

DMG 2 : Data transfer system(15min)

K. Sakai

×

DMG 3 : TBA (15min)

K. Oohara

×

DAS 1 : Status (15min)

H. Tagoshi

×

DAS 2 : TBA (15min)

T. Yuzirihara

×

DAS 3 : TBA (15min)

J. Kim

×

DAS 4 : Continuous wave search using the iKAGRA data(15min)

K. Eda

×

DAS 5 : TBA (15min)

T. Yamamoto

×

11:50-12:05

AM 3: TOPIC (Chair: )

 

TOPIC : Deep searches for long duration transient sources (15min)

M. H. P. Van Putten

×

12:05-13:05

Lunch

13:05-14:55

PM: Collaboration II (Chair: )

 

Report from KSC including authorship policy (10min)

N. Kanda

×

CPC and rules to use KAGRA data in theses(20min)

R. Flaminio

×

iKAGRA publication plan (20+20min)

K. Somiya/N. Kanda

×

Document and drawings (10min)

N. Kanda

×

Report from IBR members (15min+5min)

TBA

×

Summary (10min)

TBA

×

LCGT/Meeting/f2f/2016Aug (last edited 2017-02-09 12:21:10 by YousukeIto)