Line 2: Line 2:
 . from 13:00 at Hokubu-kaikan(data analysis building of KAGRA) Meet at 13:00 at the Hokubu-kaikan (the data analysis building of KAGRA).

See [[attachment:KAGRA_site_tour_v2.pdf]] for details.

== IBR meeting (August 25) ==
Room B203 (on the same floor and in the same building as the f2f meeting room)

Line 5: Line 12:
||||||||▄▄▄▄▄▄▄▄▄▄▄▄▄ August 25th (Thu) ▄▄▄▄▄▄▄▄▄▄▄▄▄ || ||<rowstyle="background-color: #E0FFFF;">||||||▄▄▄▄▄▄▄▄▄▄▄▄▄ August 25th (Thu) ▄▄▄▄▄▄▄▄▄▄▄▄▄ ||
Line 7: Line 14:
||Time||Subject and Title||Speaker||File|| ||<rowstyle="background-color: #E0FFFF;"> Time||Subject and Title||Speaker||File||
Line 9: Line 16:
||10:30-11:00||||Registration|| || ||<rowstyle="background-color: #F0FFF0;">10:30-11:00||||Registration|| ||
Line 11: Line 18:
||<rowstyle="background-color: #FFFFE0;text-align: left;">11:00-12:40||||<style="text-align: left;">AM: Status (Chair: ) || ||
|| ||Greeting message (2min)|| ||[[http://|×]]||
|| ||KAGRA overview (15min+3min)|| ||[[http://|×]]||
|| ||SEO report I : Budget (10min)|| K. Somiya or M. Ohashi ||[[http://]]||
|| ||SEO report II : Schedule tracking (10min)|| Y. Aso ||[[http://|×]]||
||<rowstyle="background-color: #FFFFE0;text-align: left;">11:00-12:40||||<style="text-align: left;">AM: Status (Chair: F. Matsushima ) || ||
|| ||Greeting message (2min)|| F. Matsushima ||[[http://|×]]||
|| ||KAGRA overview (15min+3min)||T. Kajita ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5548|O]]||
|| ||SEO report I : Budget (10min)|| K. Somiya and M. Ohashi ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5547|O]]||
|| ||SEO report II : Schedule tracking (10min)|| Y. Aso ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5542|O]]||
Line 17: Line 24:
|| ||Summary of the Program Advisory Board (20+5min)|| M. Ohashi ||[[http://]]||
|| ||Summary of the iKAGRA run (20+10min)|| Y. Michimura ||[[http://]]||
|| ||Summary of the Program Advisory Board (20+5min)|| M. Ohashi ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5551|O]]||
|| ||Summary of the iKAGRA run (20+10min)|| Y. Michimura ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5545|O]]||
Line 20: Line 27:
||12:40-13:40||||Lunch|| || ||<rowstyle="background-color: #F0FFF0;">12:40-13:40||||Lunch|| ||
Line 22: Line 29:
||<rowstyle="background-color: #FFFFE0;">13:40-14:45||||<style="text-align: left;">PM 1: bKAGRA I/II (Chair: ) || ||
|| ||bKAGRA phase I roadmap(25min + 10min)||M. Ando||[[http://]]||
|| ||bKAGRA phase II commissioning (20min+10min)|| S. Kawamura ||[[http://]]||
||<rowstyle="background-color: #FFFFE0;">13:40-14:45||||<style="text-align: left;">PM 1: bKAGRA I/II (Chair: Y. Aso) || ||
|| ||bKAGRA phase I roadmap(25min + 10min)||M. Ando||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5540|○]]||
|| ||bKAGRA phase I&II commissioning (20min+10min)|| S. Kawamura ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5550|O]]||
Line 26: Line 33:
||14:45-14:55||||Break|| || ||<rowstyle="background-color: #F0FFF0;">14:45-14:55||||Break|| ||
Line 28: Line 35:
||<rowstyle="background-color: #FFFFE0;">14:55-16:25||||<style="text-align: left;">PM 2: bKAGRA prospects (Chair: ) || ||
|| ||Review on science of bKAGRA era I (25min) ||S. Miyoki ||[[http://]]||
|| ||Review on science of bKAGRA era II (25min) || H. Tagoshi||[[http://]]||
||<rowstyle="background-color: #FFFFE0;">14:55-16:25||||<style="text-align: left;">PM 2: bKAGRA prospects (Chair: Y. Itoh) || ||
|| ||Review on science of bKAGRA (Experimental Aspect Discussed in Dawn Meeting II)(25min) ||S. Miyoki ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5543|○]]||
|| ||Review on science of bKAGRA era II (25min) || H. Tagoshi||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5557|○]]||
Line 32: Line 39:
|| ||Observation plan (30min) ||Discussion leaders: M. Ando/N.Kanda ||[[http://|×]]|| || ||Observation plan (30min) ||Discussion leaders: M. Ando/N.Kanda ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5537|○]] [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5549|○]]||
Line 34: Line 41:
||16:25-16:35||||Break|| || ||<rowstyle="background-color: #F0FFF0;">16:25-16:35||||Break|| ||
Line 36: Line 43:
||<rowstyle="background-color: #FFFFE0;">16:35-18:20||||<style="text-align: left;">PM 3: Subsystem I (Chair: ) || ||
|| ||AOS 1 (15min)||TBA||[[http://|×]]||
|| ||AOS 2 (15min)||TBA||[[http://|×]]||
|| ||VIS 1 (15min)||TBA||[[http://|×]]||
|| ||VIS 2 (15min)||TBA||[[http://|×]]||
|| ||VIS 3 (15min)||TBA||[[http://|×]]||
|| ||VIS 4 (15min)||TBA||[[http://|×]]||
|| ||CAL (15min)||TBA||[[http://|×]]||
||<rowstyle="background-color: #FFFFE0;">16:35-18:35||||<style="text-align: left;">PM 3: Subsystem I (Chair: O. Miyakawa ) || ||
|| ||LAS (15min)||N. Mio||[[http://|×]]||
|| ||AOS Overall (15min)||T. Akutsu||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5536|O]]||
|| ||AOS/VIS Wide Angle Baffles and Length-Sensing OpLevs for KAGRA (15min)||S. Zeidler||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5559|O]]||
|| ||VIS Overall (15min)||R. Takahashi||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5553|O]]||
|| ||VIS Type-A (15min)||K. Okutomi||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5560|O]]||
|| ||VIS Type-B (15min)||M. Barton||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5546|O]]||
|| ||VIS Type-Bp (15min)||A. Shoda||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5552|○]]||
|| ||CAL (15min)||S. Haino||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5531|○]]||
Line 45: Line 53:
||18:30-||||IBR meeting|| || ||<rowstyle="background-color: #F0FFF0;">18:40-||||IBR meeting at the room B203|| ||
Line 47: Line 55:
||||||||▄▄▄▄▄▄▄▄▄▄▄▄▄ August 26th (Fri) ▄▄▄▄▄▄▄▄▄▄▄▄▄ || ||<rowstyle="background-color: #E0FFFF;">||||||▄▄▄▄▄▄▄▄▄▄▄▄▄ August 26th (Fri) ▄▄▄▄▄▄▄▄▄▄▄▄▄ ||
Line 49: Line 57:
||<rowstyle="background-color: #FFFFE0;">9:00-10:30||||<style="text-align: left;">AM 1: Subsystem II (Chair: ) || ||
|| ||FCL (15min)||TBA||[[http://]]||
||<rowstyle="background-color: #FFFFE0;">9:00-10:30||||<style="text-align: left;">AM 1: Subsystem II (Chair: R. Takahashi) || ||
|| ||FCL (15min)||S. Miyoki||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5538|○]]||
Line 52: Line 60:
|| ||CRY 1 (15min)||TBA||[[http://|×]]||
|| ||CRY 2 (15min)||TBA||[[http://|×]]||
|| ||CRY 3 (15min)||TBA||[[http://|×]]||
|| ||CRY 4 (15min)||TBA||[[http://|×]]||
|| ||CRY 1 (5min)||Takayuki Tomaru||[[http://|×]]||
|| ||CRY 2 (20min)||Rahul Kumar||[[http://|×]]||
|| ||CRY 3 (20min)||Kieran Craig||[[http://|×]]||
|| ||CRY 4 (15min)||Nobuhiro Kimura||[[http://|×]]||
Line 57: Line 65:
||10:30-10:40||||Break|| || ||<rowstyle="background-color: #F0FFF0;">10:30-10:40||||Break|| ||
Line 61: Line 69:
|| ||MIF 1: MIF status overview (15min)||Y. Michimura ||[[http://]]||
|| ||MIF 2: bKAGRA phase 1 ASC (15min)||Y. Enomoto ||[[http://]]||
|| ||MIF 3: OFI/OMC (15min)||K. Somiya ||[[http://|×]]||
|| ||IOO 1 (15min)||TBA||[[http://|×]]||
|| ||IOO 2 (15min)||TBA||[[http://|×]]||
|| ||MIF 1 : MIF status overview (15min)||Y. Michimura ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5563|O]]||
|| ||MIF 2 : bKAGRA phase 1 ASC (15min)||Y. Enomoto ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5541|O]]||
|| ||MIF 3 : OFI/OMC (15min)||K. Somiya ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5564|O]]||
|| ||IOO 1 : IOO overview (15min)||S. Kawamura||[[http://
|×]]||
|| ||IOO 2 : Intensity stabilization and green lock (15min)||Y. Sugimoto, S. Kambara||[[http://|×]]||
Line 67: Line 75:
||12:10-12:15||||Break|| || ||<rowstyle="background-color: #F0FFF0;">12:10-12:15||||Break|| ||
Line 69: Line 77:
||<rowstyle="background-color: #FFFFE0;">12:15-13:00||||<style="text-align: left;">AM 3: Collaboration I (Chair: ) || || ||<rowstyle="background-color: #FFFFE0;">12:15-13:00||||<style="text-align: left;">AM 3: Collaboration I (Chair: H. Tagoshi ) || ||
Line 74: Line 82:
||13:00-14:00||||Lunch|| || ||<rowstyle="background-color: #F0FFF0;">13:00-14:00||||Lunch|| ||
Line 76: Line 84:
||<rowstyle="background-color: #FFFFE0;">14:00-14:50||||<style="text-align: left;">PM 1: Invited talk (Chair: ) || || ||<rowstyle="background-color: #FFFFE0;">14:00-14:50||||<style="text-align: left;">PM 1: Invited talk (Chair: N. Kanda) || ||
Line 79: Line 87:
||14:50-15:00||||Break|| || ||<rowstyle="background-color: #F0FFF0;">14:50-15:00||||Break|| ||
Line 81: Line 89:
||<rowstyle="background-color: #FFFFE0;">15:00-16:25||||<style="text-align: left;">PM 2: Subsystem IV (Chair: ) || ||
|| ||GIF 1 (15min)||TBA||[[http://|×]]||
|| ||GIF 2 (15min)||TBA||[[http://|×]]||
|| ||DET 1 Status (15min)||K. Hayama ||[[http://|×]]||
|| ||DET 2: Measurement of Schumann Resonance (20min)||S.Atsuta, Y.Kataoka||[[http://]]||
|| ||DET 3: Water study Measurement/Theory (20min) || Shikano, Somiya||[[http://|×]]||
||<rowstyle="background-color: #FFFFE0;">15:00-16:25||||<style="text-align: left;">PM 2: Subsystem IV (Chair: A. Shoda) || ||
|| ||GIF 1 : Status of GIF and Environmental Monitor (15min)||A. Araya||[[http://|×]]||
|| ||GIF 2 : First Operation of GIF (15min)||K. Miyo||[[http://|×]]||
|| ||DET 1 : Status (15min)||K. Hayama ||[[http://|×]]||
|| ||DET 2 : Measurement of Schumann Resonance (20min)||S.Atsuta, Y.Kataoka||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5544|o]]||
|| ||DET 3 : Water study Measurement/Theory (20min) || Y. Shikano, K. Somiya||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5565|o]]||
Line 88: Line 96:
||16:25-16:35||||Break|| || ||<rowstyle="background-color: #F0FFF0;">16:25-16:35||||Break|| ||
Line 91: Line 99:
|| ||AEL (15min)||TBA||[[http://|×]]||
|| ||DGS 1 (15min)||TBA||[[http://|×]]||
|| ||DGS 2 (15min)||TBA||[[http://|×]]||
|| ||DGS 3 (15min)||TBA||[[http://|×]]||
|| ||DGS 4: Hardware Injection (15min)||T. Yokozawa||[[http://|×]]||
|| ||AEL : Manufacturing electric circuits for KAGRA (15min) ||O.Miyakawa||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5556|O]]||
|| ||DGS 1 : DGS schedule for bKAGRA (15min) ||O.Miyakawa||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5554|O]]||
|| ||DGS 2 : Setting up a test bench system (15min) ||Y.Sasaki||[[http://|×]]||
|| ||DGS 3 : Update and maintenance for controls system (15min) ||T.Yamamoto||[[http://|×]]||
|| ||DGS 4 : Hardware Injection (15min)||T. Yokozawa||[[http://|×]]||
Line 98: Line 106:
|| ||TBA (30min)||T. Nakamura ||[[http://|×]]|| || ||What will we observe in O2 and Future GW detectors ? (tentative title, 30min)||T. Nakamura ||[[http://|×]]||
Line 100: Line 108:
|| ||||Banquet|| || ||<rowstyle="background-color: #F0FFF0;"> ||||Banquet|| ||
Line 102: Line 110:
||||||||▄▄▄▄▄▄▄▄▄▄▄▄▄ August 27th (Sat) ▄▄▄▄▄▄▄▄▄▄▄▄▄ || ||<rowstyle="background-color: #E0FFFF;">||||||▄▄▄▄▄▄▄▄▄▄▄▄▄ August 27th (Sat) ▄▄▄▄▄▄▄▄▄▄▄▄▄ ||
Line 104: Line 112:
||<rowstyle="background-color: #FFFFE0;">9:00-9:40||||<style="text-align: left;">AM 1: KSC (Chair: ) || ||
|| ||KSC items/authorship policy (40min)||H.-M. Lee/N. Kanda and KSC members||[[http://|×]]||
||<rowstyle="background-color: #FFFFE0;">9:00-9:40||||<style="text-align: left;">AM 1: KSC (Chair: Y. Michimura) || ||
|| ||KSC items/authorship policy (40min)||KSC members||[[http://|×]]||
Line 107: Line 115:
||9:40-9:50||||Break|| || ||<rowstyle="background-color: #F0FFF0;">9:40-9:50||||Break|| ||
Line 109: Line 117:
||<rowstyle="background-color: #FFFFE0;">9:50-12:05||||<style="text-align: left;">AM 2: Subsystem VI (Chair: ) || ||
|| ||LAS (15min)||TBA||[[http://|×]]||
|| ||DMG 1: Main data storage & DMG roadmap(15min)||N. Kanda||[[http://|×]]||
|| ||DMG 2: Data transfer system
(15min)||K. Sakai||[[http://|×]]||
|| ||DMG 3: TBD(15min)||K. Oohara||[[http://|×]]||
|| ||DAS 1: Status (15min)||H. Tagoshi ||[[http://|×]]||
|| ||DAS 2: TBD
(15min)||T. Yuzirihara||[[http://|×]]||
|| ||DAS 3: TBD(15min)||Joengcho. Kim||[[http://|×]]||
|| ||DAS 4: Continuous wave search using the iKAGRA data(15min)||K. Eda||[[http://|×]]||
|| ||DAS 5: TBD(15min)||T. Yamamoto||[[http://|×]]||
||<rowstyle="background-color: #FFFFE0;">9:50-11:50||||<style="text-align: left;">AM 2: Subsystem VI (Chair: ) || ||
|| ||DMG 1 : Main data storage & DMG roadmap(15min)||N. Kanda||[[http://|×]]||
|| ||DMG 2 : Data transfer system(15min)||K.
Sakai||[[http://|×]]||
|| ||DMG 3 :
TBA (15min)||K. Oohara||[[http://|×]]||
|| ||DA
S 1 : Status (15min)||H. Tagoshi ||[[http://|×]]||
|| ||DAS 2 : TBA (15min)||T. Yuzirihara||[[http://|×]]||
|| ||DAS 3 : TBA (15min)||J. Kim||[[http://|×]]||
|| ||DAS 4 : Continuous wave search using the iKAGRA data(15min)||K. Eda||[[http://|×]]||
|| ||DAS 5 : TBA (15min)||T. Yamamoto||[[http://|×]]||
Line 120: Line 127:
||12:05-13:05|||| Lunch || || ||<rowstyle="background-color: #FFFFE0;">11:50-12:05||||<style="text-align: left;">AM 3: TOPIC (Chair: ) || ||
|| ||TOPIC : Deep searches for long duration transient sources (15min)||M. H. P. Van Putten||[[http://|×]]||
|||||||| ||
||<rowstyle="background-color: #F0FFF0;">12:05-13:05|||| Lunch || ||
Line 124: Line 134:
|| ||CPC  and rules to use KAGRA data in theses(20min)||R. Flaminio||[[http://|×]]|| || ||CPC and rules to use KAGRA data in theses(20min)||R. Flaminio||[[http://|×]]||
Line 127: Line 137:
|| ||Report from IBR members (15min+5min)||TBA||[[http://|×]]||
|| ||Summary (10min)||TBA||[[http://|×]]||
|| ||Report from IBR members (15min+5min)||T. Kajita||[[http://|×]]||
|| ||Summary (10min)||T. Kajita||[[http://|×]]||

KAGRA Site Tour (subscribers only, August 24)

Meet at 13:00 at the Hokubu-kaikan (the data analysis building of KAGRA).

See KAGRA_site_tour_v2.pdf for details.

IBR meeting (August 25)

Room B203 (on the same floor and in the same building as the f2f meeting room)

Program (August 25 - 27)

▄▄▄▄▄▄▄▄▄▄▄▄▄ August 25th (Thu) ▄▄▄▄▄▄▄▄▄▄▄▄▄

Time

Subject and Title

Speaker

File

10:30-11:00

Registration

11:00-12:40

AM: Status (Chair: F. Matsushima )

Greeting message (2min)

F. Matsushima

×

KAGRA overview (15min+3min)

T. Kajita

O

SEO report I : Budget (10min)

K. Somiya and M. Ohashi

O

SEO report II : Schedule tracking (10min)

Y. Aso

O

Introduction of new collaborators & guest (5min)

×

Summary of the Program Advisory Board (20+5min)

M. Ohashi

O

Summary of the iKAGRA run (20+10min)

Y. Michimura

O

12:40-13:40

Lunch

13:40-14:45

PM 1: bKAGRA I/II (Chair: Y. Aso)

 

bKAGRA phase I roadmap(25min + 10min)

M. Ando

bKAGRA phase I&II commissioning (20min+10min)

S. Kawamura

O

14:45-14:55

Break

14:55-16:25

PM 2: bKAGRA prospects (Chair: Y. Itoh)

 

Review on science of bKAGRA (Experimental Aspect Discussed in Dawn Meeting II)(25min)

S. Miyoki

Review on science of bKAGRA era II (25min)

H. Tagoshi

Review on science of bKAGRA: Discussion (10min)

Discussion leaders: S. Miyoki/H. Tagoshi

×

Observation plan (30min)

Discussion leaders: M. Ando/N.Kanda

16:25-16:35

Break

16:35-18:35

PM 3: Subsystem I (Chair: O. Miyakawa )

 

LAS (15min)

N. Mio

×

AOS Overall (15min)

T. Akutsu

O

AOS/VIS Wide Angle Baffles and Length-Sensing OpLevs for KAGRA (15min)

S. Zeidler

O

VIS Overall (15min)

R. Takahashi

O

VIS Type-A (15min)

K. Okutomi

O

VIS Type-B (15min)

M. Barton

O

VIS Type-Bp (15min)

A. Shoda

CAL (15min)

S. Haino

18:40-

IBR meeting at the room B203

▄▄▄▄▄▄▄▄▄▄▄▄▄ August 26th (Fri) ▄▄▄▄▄▄▄▄▄▄▄▄▄

9:00-10:30

AM 1: Subsystem II (Chair: R. Takahashi)

 

FCL (15min)

S. Miyoki

VAC (15min)

N. Ohishi

×

CRY 1 (5min)

Takayuki Tomaru

×

CRY 2 (20min)

Rahul Kumar

×

CRY 3 (20min)

Kieran Craig

×

CRY 4 (15min)

Nobuhiro Kimura

×

10:30-10:40

Break

10:40-12:10

AM 2: Subsystem III (Chair: )

 

MIR (15min)

TBA

×

MIF 1 : MIF status overview (15min)

Y. Michimura

O

MIF 2 : bKAGRA phase 1 ASC (15min)

Y. Enomoto

O

MIF 3 : OFI/OMC (15min)

K. Somiya

O

IOO 1 : IOO overview (15min)

S. Kawamura

×

IOO 2 : Intensity stabilization and green lock (15min)

Y. Sugimoto, S. Kambara

×

12:10-12:15

Break

12:15-13:00

AM 3: Collaboration I (Chair: H. Tagoshi )

 

New people presentation (20min)

Tjonnie Li (The Chinese University of Hong Kong)

×

Vote for new people (5min)

×

Safety rules & lecture (20min)

×

13:00-14:00

Lunch

14:00-14:50

PM 1: Invited talk (Chair: N. Kanda)

 

TBA (40min+10min)

F. Ricci

×

14:50-15:00

Break

15:00-16:25

PM 2: Subsystem IV (Chair: A. Shoda)

 

GIF 1 : Status of GIF and Environmental Monitor (15min)

A. Araya

×

GIF 2 : First Operation of GIF (15min)

K. Miyo

×

DET 1 : Status (15min)

K. Hayama

×

DET 2 : Measurement of Schumann Resonance (20min)

S.Atsuta, Y.Kataoka

o

DET 3 : Water study Measurement/Theory (20min)

Y. Shikano, K. Somiya

o

16:25-16:35

Break

16:35-17:50

PM 3: Subsystem V (Chair: )

 

AEL : Manufacturing electric circuits for KAGRA (15min)

O.Miyakawa

O

DGS 1 : DGS schedule for bKAGRA (15min)

O.Miyakawa

O

DGS 2 : Setting up a test bench system (15min)

Y.Sasaki

×

DGS 3 : Update and maintenance for controls system (15min)

T.Yamamoto

×

DGS 4 : Hardware Injection (15min)

T. Yokozawa

×

17:50-18:20

PM 4: GW science (Chair: )

 

What will we observe in O2 and Future GW detectors ? (tentative title, 30min)

T. Nakamura

×

Banquet

▄▄▄▄▄▄▄▄▄▄▄▄▄ August 27th (Sat) ▄▄▄▄▄▄▄▄▄▄▄▄▄

9:00-9:40

AM 1: KSC (Chair: Y. Michimura)

 

KSC items/authorship policy (40min)

KSC members

×

9:40-9:50

Break

9:50-11:50

AM 2: Subsystem VI (Chair: )

 

DMG 1 : Main data storage & DMG roadmap(15min)

N. Kanda

×

DMG 2 : Data transfer system(15min)

K. Sakai

×

DMG 3 : TBA (15min)

K. Oohara

×

DAS 1 : Status (15min)

H. Tagoshi

×

DAS 2 : TBA (15min)

T. Yuzirihara

×

DAS 3 : TBA (15min)

J. Kim

×

DAS 4 : Continuous wave search using the iKAGRA data(15min)

K. Eda

×

DAS 5 : TBA (15min)

T. Yamamoto

×

11:50-12:05

AM 3: TOPIC (Chair: )

 

TOPIC : Deep searches for long duration transient sources (15min)

M. H. P. Van Putten

×

12:05-13:05

Lunch

13:05-14:55

PM: Collaboration II (Chair: )

 

Report from KSC including authorship policy (10min)

N. Kanda

×

CPC and rules to use KAGRA data in theses(20min)

R. Flaminio

×

iKAGRA publication plan (20+20min)

K. Somiya/N. Kanda

×

Document and drawings (10min)

N. Kanda

×

Report from IBR members (15min+5min)

T. Kajita

×

Summary (10min)

T. Kajita

×