Differences between revisions 8 and 9
Revision 8 as of 2016-07-22 14:53:06
Size: 3689
Editor: EriSakamoto
Comment:
Revision 9 as of 2016-07-22 14:57:20
Size: 3641
Editor: EriSakamoto
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
# 25th, Aug. (Thu.):  25th, Aug. (Thu.):
Line 9: Line 9:
## AM (11:00-12:45, Chair: )  AM (11:00-12:45, Chair: )
Line 18: Line 18:
## Lunch (12:45-13:45)  Lunch (12:45-13:45)
Line 20: Line 20:
## PM1 (13:45-14:55, Chair  PM1 (13:45-14:55, Chair
Line 24: Line 24:
## PM2 (14:55-15:55, Chair: )  PM2 (14:55-15:55, Chair: )
Line 31: Line 31:
## Break (15:55-16:10)  Break (15:55-16:10)
Line 33: Line 33:
## PM3 (16:10-17:40, Chair: )  PM3 (16:10-17:40, Chair: )
Line 42: Line 42:
## PM4 (17:40-18:30, Chair: )  PM4 (17:40-18:30, Chair: )
Line 47: Line 47:
## IBR meeting (18:30-)  IBR meeting (18:30-)
Line 50: Line 50:
# 26th, Aug. (Fri.):
## AM1 (9:00-10:45, Chair: )
 26th, Aug. (Fri.):
 AM1 (9:00-10:45, Chair: )
Line 56: Line 56:
## AM2 (9:45-10:45, Chair: )  AM2 (9:45-10:45, Chair: )
Line 60: Line 60:
## Break 10:45-11:00  Break 10:45-11:00
Line 62: Line 62:
## AM3 (11:00-13:00, Chair: )  AM3 (11:00-13:00, Chair: )
Line 67: Line 67:
## Lunch 13:00-14:00  Lunch 13:00-14:00
Line 69: Line 69:
## PM1 (14:00-14:50, Chair: )  PM1 (14:00-14:50, Chair: )
Line 72: Line 72:
## PM2 (14:50-15:50, Chair: )  PM2 (14:50-15:50, Chair: )
Line 80: Line 80:
## Break 15:50-16:05  Break 15:50-16:05
Line 82: Line 82:
## PM3 (16:05-18:05, Chair: )  PM3 (16:05-18:05, Chair: )
Line 94: Line 94:
- *Banquet*  *Banquet*
Line 97: Line 97:
# 27th, Aug. (Sat.):
## AM1 (9:00-9:40, Chair: )
 27th, Aug. (Sat.):
 AM1 (9:00-9:40, Chair: )
Line 101: Line 101:
## Break (9:40-9:50)  Break (9:40-9:50)
Line 103: Line 103:
## AM2 (9:50-11:50, Chair: )  AM2 (9:50-11:50, Chair: )
Line 117: Line 117:
## Lunch (11:50-13:00)  Lunch (11:50-13:00)
Line 119: Line 119:
## PM (13:00-15:00, Chair: )  PM (13:00-15:00, Chair: )

KAGRA Site Tour (subscribers only, August 24)

  • from 13:00 at Hokubu-kaikan(data analysis building of KAGRA)

Program (August 25 - 27)

August 25th (Thu)

  • 25th, Aug. (Thu.):
    • - registration (10:30-11:00)
    AM (11:00-12:45, Chair: )

- Greeting message (2min) - KAGRA overview (15min+3min) - SEO report (20min+5min) - Introduction of new collaborators & guest (5min) - Summary of the external review and PAB (20+5min) - What we have learned from the iKAGRA run (20+10min)

  • - Summary of the iKAGRA run (summary from the extended chief meeting.)
  • Lunch (12:45-13:45) PM1 (13:45-14:55, Chair

- bKAGRA phase I roadmap (M. Ando, 25min + 10min) - Review on science of bKAGRA era (25min+10min)

  • PM2 (14:55-15:55, Chair: )

- bKAGRA phase II planning (60min)

  • - Installation - Commissioning - Observation policy
    • - Discussion
  • Break (15:55-16:10) PM3 (16:10-17:40, Chair: )

- Status report from subgroups I (45min)

  • - AOS 15min x 2 - MIF 15min x 3
    • - MIF status overview (Michimura, 15 min) - bKAGRA Phase 1 ASC (Enomoto, 15 min) - OFI/OMC (Somiya, 15 min)
    - CAL 15min x 1
  • PM4 (17:40-18:30, Chair: )

- New people presentation (40min) - Vote for new people (10min)

  • IBR meeting (18:30-) 26th, Aug. (Fri.): AM1 (9:00-10:45, Chair: )

- Status report from subgroups II

  • - FCL 15min x 1 - IOO 15min x 2
  • AM2 (9:45-10:45, Chair: )

- 4 Talks from collaboration members

  • - TBD (15min x 4)
  • Break 10:45-11:00 AM3 (11:00-13:00, Chair: )

- Status report from subgroups III

  • - VIS 15min x 4 - CRY 15min x 4
  • Lunch 13:00-14:00 PM1 (14:00-14:50, Chair: )

- Invited talk from the Virgo collaboration (F. Ricci, 40min+10min)

  • PM2 (14:50-15:50, Chair: )

- Status report from subgroups IV (90min)

  • - GIF 15min x 1

    - DetChar 15min x 3

    • - DET status (Hayama, 15min) - Measurement of Schumann Resonance(Atsuta, Kataoka,15min) - Water study (Measurement: Shikano, Theory: Somiya,15min)
  • Break 15:50-16:05 PM3 (16:05-18:05, Chair: )

- Status report from subgroups V (75min)

  • - VAC 15min x 1 (N. Ohishi)
  • - MIR 15min x 1 ? (no reply) - LAS 15min x 1 ? (no reply) - AEL 15min x 1 - DGS 15min x 4
    • - TBD (TBA, 15min) - TBD (TBA, 15min) - TBD (TBA, 15min) - Hardware Injection (T. Yokozawa, 15min)
  • Banquet* 27th, Aug. (Sat.): AM1 (9:00-9:40, Chair: )

- KSC items (for KSC members, 40min, Prof. Hyung-Mok Lee leads)

  • Break (9:40-9:50) AM2 (9:50-11:50, Chair: )

- Status report from subgroups VI

  • - DMG 15min x 3
    • - Main data storage & DMG roadmap (Kanda,15min) - Data transfer system (Sakai,15min) - TBD (Oohara,15min)

    - DAS 15min x 5
    • - Status (H. Tagoshi, 15min) - TBD (T. Yuzirihara, 15min) - TBD (Joengcho Kim, 15min) - Continuous wave search using the iKAGRA data (Eda, 15min) - TBD (T. Yamamoto, 15min)
  • Lunch (11:50-13:00) PM (13:00-15:00, Chair: )

- iKAGRA publication plan (20+20min) - Safety rules & lecture (20min) - Organization (10min each, 30min)

  • - Document and drawings - CPC (R. Flaminio) - Authorship

- Report from IBR members (15min+5min) - Summary (10min)

LCGT/Meeting/f2f/2016Aug (last edited 2017-02-09 12:21:10 by YousukeIto)