4533
Comment:
|
6490
|
Deletions are marked like this. | Additions are marked like this. |
Line 9: | Line 9: |
* FCL | /* * FCL N = 0 |
Line 12: | Line 13: |
* VIS * MIR |
* VIS N = 3 K. Okutomi,M. Barton, A. Shoda * MIR N = 1 E. Hirose */ |
Line 15: | Line 17: |
* MIF | * MIF N = 1 Status Report (Y. Michimura) |
Line 17: | Line 19: |
1 Overview of IOO (Kawamura) 2 Progress in Kamioka (Kokeyama) 3 The Measurements for Characteristics of SiC and Prospect to the Design of Beam Dump (Chen) 4 Intensity noise stabilization and green lock system (tentative title) (Yokogawa) |
1. Overview of IOO (Kawamura) 2. Progress in Kamioka (Kokeyama) 3. The Measurements for Characteristics of SiC and Prospect to the Design of Beam Dump (Chen) 4. Intensity noise stabilization and green lock system (tentative title) (Yokogawa) |
Line 24: | Line 26: |
* DMG N = 2 K. Sakai, N. Kanda * DAS * GIF |
* DMG N = 3 1. N. Kanda 2. K. Sakai 3. G.-W. Kang (KISTI, Korea) Status of computing resources at KISTI and supports for KAGRA on 29th * DAS N = 1 * GIF N = 2 A. Araya, K. Miyo on 30th |
Line 30: | Line 35: |
* iKAGRA data analysis results | * iKAGRA data analysis paper plan 30 min |
Line 63: | Line 68: |
||<rowstyle="background-color: #FFFFE0;text-align: left;">9:00-10:45||||<style="text-align: left;">TOPIC (Chair: ) || || || ||VAC (15 min) || T. Uchiyama || || || ||VIS 1 (15 min) || K. Okutomi || || || ||VIS 2 (15 min) || M. Barton || || || ||VIS 3 (15 min) || A. Shoda || || || ||CRY 1 (15 min) || T. Miyamoto || || || ||CRY 2 (15 min) || R. Kumar, T. Yamada || || || ||CRY 3 (15 min) || K. Yamamoto, Ochi || || |||||||| || ||<rowstyle="background-color: #F0FFF0;">10:45-11:00||||Break|| || |||||||| || ||<rowstyle="background-color: #FFFFE0;text-align: left;">11:00-12:30||||<style="text-align: left;">TOPIC (Chair: ) || || || ||MIR (15 min) || E. Hirose || || || ||Status of MIF (15 min) || Y. Michimura || || || ||Overview of IOO (15 min) || S. Kawamura || || || ||Progress in Kamioka (15 min) || K. Kokeyama || || || ||The Measurements for Characteristics of SiC and Prospect to the Design of Beam Dump (15 min) || Chen || || || ||Intensity noise stabilization and green lock system (tentative title) (15 min) || Yokogawa || || |||||||| || ||<rowstyle="background-color: #F0FFF0;">12:30-14:00||||Lunch|| || |||||||| || ||<rowstyle="background-color: #FFFFE0;text-align: left;">14:00-HH:MM||||<style="text-align: left;">TOPIC (Chair: ) || || || ||LIGO Status (mm min) || David Shoemaker || || || ||LRR paper on bKAGRA (mm min) || M. Ando || || |||||||| || ||<rowstyle="background-color: #F0FFF0;">HH:MM-HH:MM||||Break|| || |||||||| || |
|
Line 64: | Line 96: |
|| ||TITLE (mm min) || SPEAKER || || |||||||| || ||<rowstyle="background-color: #F0FFF0;">HH:MM-HH:MM||||Lunch|| || |||||||| || ||<rowstyle="background-color: #FFFFE0;text-align: left;">HH:MM-HH:MM||||<style="text-align: left;">TOPIC (Chair: ) || || || ||LIGO Status (mm min) || SPEAKER || || || ||TITLE (mm min) || SPEAKER || || |
|| ||AOS 1 (15 min) || TBA || || || ||AOS 2 (15 min) || TBA || || || ||AOS 3 (15 min) || TBA || || || ||DMG 1 (15 min) || N. Kanda || || || ||DMG 2 (15 min) || Y. Michimura || || || ||Status of computing resources at KISTI and supports for KAGRA (15 min) || G.-W. Kang || || |
16th KAGRA face-to-face meeting, March 28-30th 2017, Satellite Campus Tokimate, Niigata University
Agenda includes
- Application for new collaboration (Chunglee Kim, ...)
- iKAGRA paper status (Somiya, Sato, Itoh)
- Status of the KAGRA status paper for the Living reviews in relativity (Ando)
- bKAGRA plan
- Subsystem talks