Size: 2092
Comment:
|
Size: 2095
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 11: | Line 11: |
== 1. Calibration and hardware related issues == | == I. Calibration and hardware related issues == |
Line 18: | Line 18: |
I. Current Status (Y.Inoue) | 1. Current Status (Y.Inoue) |
Line 23: | Line 23: |
I. Remark the goal/target of O3 | 1. Remark the goal/target of O3 |
Line 32: | Line 32: |
I.#3 GW (Gravitational Wave) Metrology Workshop report, home works (Y.Inoue) I. LVK cross check I. Toward O4 |
1.#3 GW (Gravitational Wave) Metrology Workshop report, home works (Y.Inoue) 1. LVK cross check 1. Toward O4 |
Line 43: | Line 43: |
I.#6 Hardware conditions/evaluations (con't for discussion in a.m.) | 1.#6 Hardware conditions/evaluations (con't for discussion in a.m.) |
Line 45: | Line 45: |
I. Proc. Data (T.Yamamoto and/or T.Sawada) | 1. Proc. Data (T.Yamamoto and/or T.Sawada) |
Line 58: | Line 58: |
I. Data files (N.Kanda) | 1. Data files (N.Kanda) |
Line 62: | Line 62: |
== 2. Data Analysis related with Calibration == | == II. Data Analysis related with Calibration == |
Line 66: | Line 66: |
I.#9 GW waveform injection (T.Sawada) I. Simulation (S.Tsuchida) I. Analysis topics related with calibration |
1.#9 GW waveform injection (T.Sawada) 1. Simulation (S.Tsuchida) 1. Analysis topics related with calibration |
Line 70: | Line 70: |
== 3. Grants strategy (closed session) == | == III. Grants strategy (closed session) == |
Satellite Meeting on Calibration and related grants projects
Date : April/22 Time : 9:00 - 15:30 Place : the same room with F2F.
Presentation registration of the satellite meeting should be made directly to Calibration subgroup and leader of related grants ; kanda\_at\_sci.osaka-cu.ac.jp, tomaru\_at\_post.kek.jp, iyuki\_at\_post.kek.jp
Discussion Program and Agenda
I. Calibration and hardware related issues
We would like to have general discussion on the KAGAR calibration, $h(t)$ reconstruction and hardware related issues.
9:00-12:00 Remark and Sharing the Current Status of calibration around O3
chair: T.Tomaru
- Current Status (Y.Inoue)
- end-to-end of KAGRA calibration
- Flow chart of works and dedicated persons
- Who is working on What/How ?
- Remark the goal/target of O3
- goal / target !?
- Q: Are we ready for O3 ?
- prepared/finished items: , , , ,
- remain items : , , , ,
- options : , , ,
(break)
- GW (Gravitational Wave) Metrology Workshop report, home works (Y.Inoue)
- LVK cross check
- Toward O4
- Preparation for O4
- How /What goal for the finish of O4 in KAGRA ?
13:00-14:00 Technical issues on h(t) reconstruction
chair : N.Kanda
- Hardware conditions/evaluations (con't for discussion in a.m.)
- Proc. Data (T.Yamamoto and/or T.Sawada)
- C1#
- Filter design
- Expected quality
- Latency
- variation of files, i.e. length, recorded channels, etc.
- decisions for O3
- C2#
- Target quality
- Cadence of offline generation
- Necessary items for C2#
- C1#
- Data files (N.Kanda)
- Data flow overview
- Variations including low latency files
II. Data Analysis related with Calibration
chair : Y.Inoue
14:15-15:30
- GW waveform injection (T.Sawada)
- Simulation (S.Tsuchida)
- Analysis topics related with calibration
III. Grants strategy (closed session)
15:30- (Until 17:00 in late case.) :
This is closed session for grant member only.