Differences between revisions 5 and 6
Revision 5 as of 2019-04-14 17:45:49
Size: 2092
Comment:
Revision 6 as of 2019-04-14 17:48:51
Size: 2095
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
== 1. Calibration and hardware related issues == == I. Calibration and hardware related issues ==
Line 18: Line 18:
 I. Current Status (Y.Inoue)  1. Current Status (Y.Inoue)
Line 23: Line 23:
 I. Remark the goal/target of O3  1. Remark the goal/target of O3
Line 32: Line 32:
 I.#3 GW (Gravitational Wave) Metrology Workshop report, home works (Y.Inoue)
 I. LVK cross check
 I. Toward O4
 1.#3 GW (Gravitational Wave) Metrology Workshop report, home works (Y.Inoue)
 1. LVK cross check
 1. Toward O4
Line 43: Line 43:
 I.#6 Hardware conditions/evaluations (con't for discussion in a.m.)  1.#6 Hardware conditions/evaluations (con't for discussion in a.m.)
Line 45: Line 45:
 I. Proc. Data (T.Yamamoto and/or T.Sawada)  1. Proc. Data (T.Yamamoto and/or T.Sawada)
Line 58: Line 58:
 I. Data files (N.Kanda)  1. Data files (N.Kanda)
Line 62: Line 62:
== 2. Data Analysis related with Calibration == == II. Data Analysis related with Calibration ==
Line 66: Line 66:
 I.#9 GW waveform injection (T.Sawada)
 I. Simulation (S.Tsuchida)
 I. Analysis topics related with calibration
 1.#9 GW waveform injection (T.Sawada)
 1. Simulation (S.Tsuchida)
 1. Analysis topics related with calibration
Line 70: Line 70:
== 3. Grants strategy (closed session) == == III. Grants strategy (closed session) ==

Satellite Meeting on Calibration and related grants projects

Date : April/22 Time : 9:00 - 15:30 Place : the same room with F2F.

Presentation registration of the satellite meeting should be made directly to Calibration subgroup and leader of related grants ; kanda\_at\_sci.osaka-cu.ac.jp, tomaru\_at\_post.kek.jp, iyuki\_at\_post.kek.jp

Discussion Program and Agenda

We would like to have general discussion on the KAGAR calibration, $h(t)$ reconstruction and hardware related issues.

9:00-12:00 Remark and Sharing the Current Status of calibration around O3

chair: T.Tomaru

  1. Current Status (Y.Inoue)
    • end-to-end of KAGRA calibration
    • Flow chart of works and dedicated persons
      • Who is working on What/How ?
  2. Remark the goal/target of O3
    • goal / target !?
    • Q: Are we ready for O3 ?
      • prepared/finished items: , , , ,
      • remain items : , , , ,
      • options : , , ,

(break)

  1. GW (Gravitational Wave) Metrology Workshop report, home works (Y.Inoue)
  2. LVK cross check
  3. Toward O4
    • Preparation for O4
    • How /What goal for the finish of O4 in KAGRA ?

13:00-14:00 Technical issues on h(t) reconstruction

chair : N.Kanda

  1. Hardware conditions/evaluations (con't for discussion in a.m.)
  2. Proc. Data (T.Yamamoto and/or T.Sawada)
    • C1#
      • Filter design
      • Expected quality
      • Latency
      • variation of files, i.e. length, recorded channels, etc.
      • decisions for O3
    • C2#
      • Target quality
      • Cadence of offline generation
      • Necessary items for C2#
  3. Data files (N.Kanda)
    • Data flow overview
    • Variations including low latency files

chair : Y.Inoue

14:15-15:30

  1. GW waveform injection (T.Sawada)
  2. Simulation (S.Tsuchida)
  3. Analysis topics related with calibration

III. Grants strategy (closed session)

15:30- (Until 17:00 in late case.) :

This is closed session for grant member only.

LCGT/Meeting/f2f/2019Apr/CalRelated (last edited 2019-04-22 15:07:03 by TakahiroYamamoto)