Technical issues on control scheme

Original note

alt text

Optical configuration

These can be an issue with our own risk as aLIGO and AdVirgo will start with BRSE configuration and they do not plan to change the homodyne phase from 90 deg.

Input optics

These are also unique for LCGT.

Control


see http://gw.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/subgroup/ifo/ISC/Issues for other issues.