Differences between revisions 1 and 3 (spanning 2 versions)
Revision 1 as of 2010-12-15 04:03:18
Size: 663
Comment:
Revision 3 as of 2010-12-15 04:05:51
Size: 995
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
  * file link   * [[file link]]
  *{{{
Suggestions from Rana / Action Items
}}}
Line 7: Line 10:
  * file link   * [[file link]]
  *{{{
Suggestions from Rana / Action Items
}}}
Line 10: Line 16:
  * file link   * [[file link]]
  *{{{
Suggestions from Rana / Action Items
}}}
Line 13: Line 22:
  * file link   * [[file link]]
  *{{{
Suggestions from Rana / Action Items
}}}
Line 16: Line 28:
  * file link   * [[file link]]
  *{{{
Suggestions from Rana / Action Items
}}}
Line 19: Line 34:
  * file link
  * [[file link]]
  *{{{
Suggestions from Rana / Action Items
}}}

Discussion with Rana

  • 12/9 Optical configuration (Somiya), 1PM-5PM @Small seminar room (2)
    • file link

    • Suggestions from Rana / Action Items
  • 12/10 Interferometer sensing/control 1 (Aso), 10AM-12PM @Sougou-kenkyu-tou 664, 1PM-5PM @Small seminar room (1)
    • file link

    • Suggestions from Rana / Action Items
  • 12/14 Electronics (Moriwaki), 10AM-5PM @Small seminar room (2)
    • file link

    • Suggestions from Rana / Action Items
  • 12/15 Vibration isolation (Takahashi), 10AM-5PM @Small seminar room (1)
    • file link

    • Suggestions from Rana / Action Items
  • 12/16 Laser, Mirror, Input/Output optics (Mio, Telada), 10AM-5PM @Small seminar room (1)
    • file link

    • Suggestions from Rana / Action Items
  • 12/17 Interferometer sensing/control 2 (Aso) 10AM-3PM, @Small seminar room (2) 3PM-5PM @Sougou-kenkyu-tou 664
    • file link

    • Suggestions from Rana / Action Items

LCGT/iLCGT/Subgroup/DiscussionRana2010 (last edited 2011-06-17 00:47:04 by OsamuMiyakawa)