Differences between revisions 1 and 11 (spanning 10 versions)
Revision 1 as of 2011-07-03 04:17:00
Size: 744
Comment:
Revision 11 as of 2011-10-06 19:50:30
Size: 1127
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
'''[[../|..Up]]'''
Line 7: Line 8:
TBD Pick-off and transmit IR/Green beams from/to vacuum chambers.
Line 40: Line 41:
== Procurement process and plans ==
TBD
Line 41: Line 45:
 * [[https://dcc.ligo.org/cgi-bin/DocDB/ShowDocument?docid=29666&version=1|LIGO-T1000746-v1, Viewports Subsystem Final Design Document]]  * [[https://dcc.ligo.org/cgi-bin/DocDB/ShowDocument?docid=62886|LIGO-E1100537-v10, Transmission Monitor Telescope Suspension (TMS) Final Design]]
 * [[https://dcc.ligo.org/cgi-bin/DocDB/ShowDocument?docid=60926|LIGO-G1100439-v4, TMS Telescope Alignment]]
 * [[https://dcc.ligo.org/cgi-bin/DocDB/ShowDocument?docid=58277|LIGO-T1100258-v4, Transmission Monitoring Telescope and Suspension - TMS]]

Beam Reducing Telescopes

Related subgroups: IOO, MIF, VAC, CRY, VIS...


..Up

Scope

Pick-off and transmit IR/Green beams from/to vacuum chambers.

Applicable Documents

  • Spec. for vacuum chambers
  • Optical Layout Drawing of the LCGT interferometer
  • Length Sensing and Control doc
  • Alignment Sensing and Control doc
  • CCD Monitor doc
  • Any...

General Description

TBD

Functions

Beams for TBD

Naming Conventions

TBD

Locations

  • BS chamber

Requirements

TBD

Characteristics

TBD

Inspection plans

TBD

Procurement process and plans

TBD

LCGT/subgroup/AOS/BeamReduceTelescope1 (last edited 2012-09-28 03:45:15 by TomotadaAkutsu)