Differences between revisions 10 and 13 (spanning 3 versions)
Revision 10 as of 2011-10-06 05:51:53
Size: 1107
Comment:
Revision 13 as of 2012-06-27 17:07:52
Size: 1047
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= Beam Reducing Telescopes = = Transmission Monitor =
Line 3: Line 3:

Also called as "beam reducing telescope (BRT)".
Line 4: Line 7:
'''[[../|..Up]]'''
Line 7: Line 11:
Pick-off and transmit IR/Green beams from/to vacuum chambers. Transmission monitors for IR/Green beams.
Line 9: Line 13:
== Applicable Documents ==
 * Spec. for vacuum chambers
 * Optical Layout Drawing of the LCGT interferometer
 * Length Sensing and Control doc
 * Alignment Sensing and Control doc
 * CCD Monitor doc
 * Any...
Line 18: Line 15:
TBD
Line 21: Line 17:
Beams for TBD  * Monitoring the off-centering and pitch/yaw fluctuations of the ITMs/ETMs relative to the preselected optical path.
 * Monitoring the shape of the beam modes that transmit the arm cavity.


=== Required channels ===
Line 27: Line 28:
 * BS chamber
 *
 * At the dedicated chambers in back of ETM chambers
Line 30: Line 30:
== Requirements ==
TBD

== Characteristics ==
TBD


== Inspection plans ==
TBD

== Procurement process and plans ==
TBD

Transmission Monitor

Related subgroups: IOO, MIF, VAC, CRY, VIS...

Also called as "beam reducing telescope (BRT)".


..Up

Scope

Transmission monitors for IR/Green beams.

General Description

Functions

  • Monitoring the off-centering and pitch/yaw fluctuations of the ITMs/ETMs relative to the preselected optical path.
  • Monitoring the shape of the beam modes that transmit the arm cavity.

Required channels

Naming Conventions

TBD

Locations

  • At the dedicated chambers in back of ETM chambers

LCGT/subgroup/AOS/BeamReduceTelescope1 (last edited 2012-09-28 03:45:15 by TomotadaAkutsu)