 * Remote actuators for TMS itself would be required.  * Remote actuators for TMS chassis would be required.

Transmission Monitor System (TMS)

Related subgroups: IOO, MIF, VAC, CRY, VIS...

Also called "beam reducing telescope (BRT)" in LCGT.


..Up

Scope

Transmission monitors for IR/Green beams.

General Description

Functions

  • Collect 1064nm and 532nm light transmitting ETMs.
  • Monitor the off-centering and pitch/yaw fluctuations of the ITMs/ETMs relative to the preselected optical path.
  • Monitor the shape of the beam modes that transmit the arm cavity.

Requirements

For each TMS,

  • 2QPDs for 1064nm are required to monitor off-centering of the beam; one is for high gain, the other is for low gain.
  • 2QPDs for 1064nm are required to monitor pitch/yaw misalignments of the beam; one is for high gain, the other is for low gain.
  • 2QPDs for 532nm are required.
  • Remote stirring mirrors for QPDs are required at least in the initial commissioning phase.
  • Remote actuators for TMS chassis would be required.
  • CCD monitors for monitoring the beam mode transmitting the ETM are required.
  • Optical levers (or equivalent local monitors) are required.
  • Suspension system will require more signal channels?
  • Shutters for high gain QPDs are required.

Chamber Name

Type

Quantity

Purpose

Used By

PRM

1064nm QPD

4

REFL port

MIF

Naming Conventions

TBD

Locations

  • At the dedicated chambers in back of ETM chambers