Differences between revisions 2 and 3
Revision 2 as of 2011-07-03 04:19:29
Size: 611
Comment:
Revision 3 as of 2011-07-03 04:50:01
Size: 631
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
TBD Transmit IR/Green beams

Beam Reducing Telescopes

Related subgroups: IOO, MIF, VAC, CRY, VIS...


Scope

Transmit IR/Green beams

Applicable Documents

  • Spec. for vacuum chambers
  • Optical Layout Drawing of the LCGT interferometer
  • Length Sensing and Control doc
  • Alignment Sensing and Control doc
  • CCD Monitor doc
  • Any...

General Description

TBD

Functions

Beams for TBD

Naming Conventions

TBD

Locations

  • BS chamber

Requirements

TBD

Characteristics

TBD

Inspection plans

TBD

TBD

LCGT/subgroup/AOS/BeamReduceTelescope1 (last edited 2012-09-28 03:45:15 by TomotadaAkutsu)