Differences between revisions 5 and 6
Revision 5 as of 2011-07-03 05:02:54
Size: 877
Comment:
Revision 6 as of 2011-07-07 02:36:46
Size: 921
Comment:
Deletions are marked like this. Additions are marked like this.
Line 40: Line 40:
== Procurement process and plans ==
TBD

Beam Reducing Telescopes

Related subgroups: IOO, MIF, VAC, CRY, VIS...


Scope

Transmit IR/Green beams

Applicable Documents

  • Spec. for vacuum chambers
  • Optical Layout Drawing of the LCGT interferometer
  • Length Sensing and Control doc
  • Alignment Sensing and Control doc
  • CCD Monitor doc
  • Any...

General Description

TBD

Functions

Beams for TBD

Naming Conventions

TBD

Locations

  • BS chamber

Requirements

TBD

Characteristics

TBD

Inspection plans

TBD

Procurement process and plans

TBD

LCGT/subgroup/AOS/BeamReduceTelescope1 (last edited 2012-09-28 03:45:15 by TomotadaAkutsu)