Differences between revisions 9 and 10
Revision 9 as of 2011-08-29 06:03:51
Size: 961
Comment:
Revision 10 as of 2011-10-06 05:51:53
Size: 1107
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= IR Pick-off and Transmit Telescopes = = Beam Reducing Telescopes =
Line 7: Line 7:
Pick-off and transmit IR beams from vacuum chambers. Pick-off and transmit IR/Green beams from/to vacuum chambers.
Line 44: Line 44:
 * [[https://dcc.ligo.org/cgi-bin/DocDB/ShowDocument?docid=62886|LIGO-E1100537-v10, Transmission Monitor Telescope Suspension (TMS) Final Design]]

Beam Reducing Telescopes

Related subgroups: IOO, MIF, VAC, CRY, VIS...


Scope

Pick-off and transmit IR/Green beams from/to vacuum chambers.

Applicable Documents

  • Spec. for vacuum chambers
  • Optical Layout Drawing of the LCGT interferometer
  • Length Sensing and Control doc
  • Alignment Sensing and Control doc
  • CCD Monitor doc
  • Any...

General Description

TBD

Functions

Beams for TBD

Naming Conventions

TBD

Locations

  • BS chamber

Requirements

TBD

Characteristics

TBD

Inspection plans

TBD

Procurement process and plans

TBD

LCGT/subgroup/AOS/BeamReduceTelescope1 (last edited 2012-09-28 03:45:15 by TomotadaAkutsu)