Differences between revisions 11 and 12
Revision 11 as of 2011-09-03 09:20:50
Size: 851
Comment:
Revision 12 as of 2011-09-03 09:21:05
Size: 873
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
The scope of ''Initial Alignment'' is to determine the procedure for initially aligning the LCGT main optics. The scope of ''Initial Alignment'' is to determine the procedure for initially aligning the LCGT main opticsand main optical paths.

Initial Alignment

Related subgroups: MIF, IOO, VAC, CRY, VIS


Scope

The scope of Initial Alignment is to determine the procedure for initially aligning the LCGT main opticsand main optical paths. This task also includes procurement of tools required for the pursuance.

Activity Allocation

Activities

Assinged to

Memo

Determining the procedure

MIF

Procurement of tools

Autocollimator?

Applicable Documents

None.

General Description

It is important. This needs to be determined before the LCGT installation.

Requirements

TBD

Characteristics

TBD

Inspection plans

TBD

Procurement process and plans

TBD

LCGT/subgroup/AOS/InitialAlign1 (last edited 2012-02-10 14:47:52 by TomotadaAkutsu)