602
Comment:
|
873
|
Deletions are marked like this. | Additions are marked like this. |
Line 7: | Line 7: |
The scope of ''Initial Alignment'' is to determine the procedure and plan of setting the initial alignment of LCGT optics. This task also includes procurement of tools required for setting the initial alignment. |
The scope of ''Initial Alignment'' is to determine the procedure for initially aligning the LCGT main opticsand main optical paths. This task also includes procurement of tools required for the pursuance. == Activity Allocation == || '''''Activities''''' || '''''Assinged to''''' || '''''Memo'''''|| || Determining the procedure || MIF || || || Procurement of tools || || Autocollimator?|| |
Line 11: | Line 16: |
None. | |
Line 14: | Line 20: |
== Activities Allocation == TBD |
This needs to be determined before the LCGT installation. |
Initial Alignment
Related subgroups: MIF, IOO, VAC, CRY, VIS
Contents
Scope
The scope of Initial Alignment is to determine the procedure for initially aligning the LCGT main opticsand main optical paths. This task also includes procurement of tools required for the pursuance.
Activity Allocation
Activities |
Assinged to |
Memo |
Determining the procedure |
MIF |
|
Procurement of tools |
|
Autocollimator? |
Applicable Documents
None.
General Description
It is important. This needs to be determined before the LCGT installation.
Requirements
TBD
Characteristics
TBD
Inspection plans
TBD
Procurement process and plans
TBD