Differences between revisions 3 and 4
Revision 3 as of 2011-09-03 08:44:33
Size: 609
Comment:
Revision 4 as of 2011-09-03 08:45:16
Size: 666
Comment:
Deletions are marked like this. Additions are marked like this.
Line 15: Line 15:
This needs to be determined before the LCGT installation.

Initial Alignment

Related subgroups: MIF, IOO, VAC, CRY, VIS


Scope

The scope of Initial Alignment is to determine the procedure and plan of setting the initial alignment of LCGT optics. This task also includes procurement of tools required for setting the initial alignment.

Applicable Documents

None.

General Description

It is important. This needs to be determined before the LCGT installation.

Activities Allocation

TBD

Requirements

TBD

Characteristics

TBD

Inspection plans

TBD

Procurement process and plans

TBD

LCGT/subgroup/AOS/InitialAlign1 (last edited 2012-02-10 14:47:52 by TomotadaAkutsu)