666
Comment:
|
739
|
Deletions are marked like this. | Additions are marked like this. |
Line 10: | Line 10: |
== Activities Allocation == * Determining procedure and plan * Procurement of tools (autocollimator?) |
|
Line 16: | Line 20: |
== Activities Allocation == TBD |
Initial Alignment
Related subgroups: MIF, IOO, VAC, CRY, VIS
Contents
Scope
The scope of Initial Alignment is to determine the procedure and plan of setting the initial alignment of LCGT optics. This task also includes procurement of tools required for setting the initial alignment.
Activities Allocation
- Determining procedure and plan
- Procurement of tools (autocollimator?)
Applicable Documents
None.
General Description
It is important. This needs to be determined before the LCGT installation.
Requirements
TBD
Characteristics
TBD
Inspection plans
TBD
Procurement process and plans
TBD