Differences between revisions 4 and 5
Revision 4 as of 2011-09-03 08:45:16
Size: 666
Comment:
Revision 5 as of 2011-09-03 08:56:39
Size: 739
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:
== Activities Allocation ==
 * Determining procedure and plan
 * Procurement of tools (autocollimator?)
Line 16: Line 20:

== Activities Allocation ==
TBD

Initial Alignment

Related subgroups: MIF, IOO, VAC, CRY, VIS


Scope

The scope of Initial Alignment is to determine the procedure and plan of setting the initial alignment of LCGT optics. This task also includes procurement of tools required for setting the initial alignment.

Activities Allocation

  • Determining procedure and plan
  • Procurement of tools (autocollimator?)

Applicable Documents

None.

General Description

It is important. This needs to be determined before the LCGT installation.

Requirements

TBD

Characteristics

TBD

Inspection plans

TBD

Procurement process and plans

TBD

LCGT/subgroup/AOS/InitialAlign1 (last edited 2012-02-10 14:47:52 by TomotadaAkutsu)