= Initial Alignment = | = [OBSOLETE] Initial Alignment = |
Line 7: | Line 7: |
The scope of ''Initial Alignment'' is to determine the procedure and plan of setting the initial alignment of LCGT optics. This task also includes procurement of tools required for setting the initial alignment. |
The scope of ''Initial Alignment'' is to determine the procedure for initially aligning the LCGT main optics as well as the main optical paths. This task also includes procurement of tools required for the pursuance. |
Line 10: | Line 10: |
== Activities Allocation == * Determining procedure and plan * Procurement of tools (autocollimator?) |
== Activity Allocation == || '''''Activities''''' || '''''Assinged to''''' || '''''Memo'''''|| || Determining the procedure || MIF/Aso || || || Procurement of tools || || Autocollimator?|| |
[OBSOLETE] Initial Alignment
Related subgroups: MIF, IOO, VAC, CRY, VIS
Contents
Scope
The scope of Initial Alignment is to determine the procedure for initially aligning the LCGT main optics as well as the main optical paths. This task also includes procurement of tools required for the pursuance.
Activity Allocation
Activities |
Assinged to |
Memo |
Determining the procedure |
MIF/Aso |
|
Procurement of tools |
|
Autocollimator? |
Applicable Documents
None.
General Description
It is important. This needs to be determined before the LCGT installation.
Requirements
TBD
Characteristics
TBD
Inspection plans
TBD
Procurement process and plans
TBD