The scope of ''Initial Alignment'' is to determine the procedure for setting the initial alignment of LCGT optics.
This task also includes procurement of tools required for setting the initial alignment.
The scope of ''Initial Alignment'' is to determine the procedure for initially aligning the LCGT main optics as well as the main optical paths.
This task also includes procurement of tools required for the pursuance.
Line 10: Line 10:
== Activities Allocation == == Activity Allocation ==
Line 12: Line 12:
|| Determining the procedure || MIF || || || Determining the procedure || MIF/Aso || ||

[OBSOLETE] Initial Alignment

Related subgroups: MIF, IOO, VAC, CRY, VIS


Scope

The scope of Initial Alignment is to determine the procedure for initially aligning the LCGT main optics as well as the main optical paths. This task also includes procurement of tools required for the pursuance.

Activity Allocation

Activities

Assinged to

Memo

Determining the procedure

MIF/Aso

Procurement of tools

Autocollimator?

Applicable Documents

None.

General Description

It is important. This needs to be determined before the LCGT installation.

Requirements

TBD

Characteristics

TBD

Inspection plans

TBD

Procurement process and plans

TBD