Differences between revisions 8 and 9
Revision 8 as of 2011-09-03 09:06:47
Size: 872
Comment:
Revision 9 as of 2011-09-03 09:13:25
Size: 869
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
The scope of ''Initial Alignment'' is to determine the procedure for setting the initial alignment of LCGT optics.
This task also includes procurement of tools required for setting the initial alignment.
The scope of ''Initial Alignment'' is to determine the procedure for initially aligning the LCGT optics.
This task also includes procurement of tools required for actual setting the initial alignment.

Initial Alignment

Related subgroups: MIF, IOO, VAC, CRY, VIS


Scope

The scope of Initial Alignment is to determine the procedure for initially aligning the LCGT optics. This task also includes procurement of tools required for actual setting the initial alignment.

Activity Allocation

Activities

Assinged to

Memo

Determining the procedure

MIF

Procurement of tools

Autocollimator?

Applicable Documents

None.

General Description

It is important. This needs to be determined before the LCGT installation.

Requirements

TBD

Characteristics

TBD

Inspection plans

TBD

Procurement process and plans

TBD

LCGT/subgroup/AOS/InitialAlign1 (last edited 2012-02-10 14:47:52 by TomotadaAkutsu)